# 00170802894452
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-12-06, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the compliance of the work performed and the building materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 and 3 of Articles 52 of the Urban Planning Code of the Russian Federation
# 00170802777505
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701875506
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-11, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the fulfillment of the instruction to eliminate the identified violations
# 772100239690
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the task of this check is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on on the basis of an agreement with a developer or technical customer, violations of legislation on urban development, including design documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
availability of a building permit;
compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 772100239647
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100215847
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100133190
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-05, duration: 14
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya v sootvetstvii s izvescheniem
OOO «DKM» ob okonchanii stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva ot 1 aprelya 2021 № b/n (vh.№ 210/15835
ot 01.04.2021) s celyu kontrolya sootvetstviya vypolnennyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii, trebovaniyam
po energosberezheniyu i povysheniyu energeticheskoi effektivnosti
i inyh normativno - pravovyh aktov pri stroitelstve;
zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie, vyyavlenie
i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora
s zastroischikom ili tehnicheskim zakazchikom, narushenii zakonodatelstva
o gradostroitelnoi deyatelnosti, v tom chisle tehnicheskih reglamentov
i proektnoi dokumentacii, trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti.
Predmetom nastoyaschei proverki yavlyaetsya:
sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti
(za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov;
# 772100012866
Unscheduled inspection
Start date: 2021-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004232822
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-12, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904109478
Unscheduled inspection
Start date: 2019-12-25, end date: 2020-01-29, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the reconstruction of the capital construction facility, the task of this check is to prevent identify and suppress violations committed by the developer by the technical customer as well as by the person carrying out the reconstruction on the basis of an agreement with the developer or technical customer violations of legislation on urban planning activities, including technical regulations and design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which the requirements of energy efficiency efficiency does not apply to the requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904058470
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-09, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of a letter received on the termination of federal state supervision of an unfinished capital construction facility. From the information provided, it is established that construction and installation works are not being carried out at the facility. conservation of the facility has not been completed. The task of this inspection is to prevent, identify and suppress violations of the legislation on urban development committed by the developer, the customer carrying out construction. The subject of this inspection is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including the requirements of energy efficiency with the exception of capital construction facilities, which are not subject to energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 001904058489
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-09, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of a letter received on the termination of federal state supervision of an unfinished capital construction facility. From the information provided, it is established that construction and installation works are not being carried out at the facility. conservation of the facility has not been completed. The task of this inspection is to prevent, identify and suppress violations of the legislation on urban development committed by the developer, the customer carrying out construction. The subject of this inspection is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including the requirements of energy efficiency with the exception of capital construction facilities, which are not subject to energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 001903883164
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-09, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya sootvetstviya vypolnennyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii trebovaniyam po energosberezheniyu i povysheniyu energeticheskoi effektivnosti i inyh normativno pravovyh aktov pri stroitelstva obekta kapitalnogo stroitelstva zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsyasootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Gradostroitelnogo Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 001903973702
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-11, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903898628
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902897386
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-12, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: s celyu kontrolya sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri stroitelstvezadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti
# 001902885420
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnostiPredmetom nastoyaschei proverki yavlyaetsyasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovvypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001902748735
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-17, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnostiPredmetom nastoyaschei proverki yavlyaetsyasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovvypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001902620046
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-03-26, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800214777
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-03-06, duration: —
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Proverka ispolneniya predpisaniya 1136985 ot 30102017
# 00170802894452
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-12-06, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the compliance of the work performed and the building materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 and 3 of Articles 52 of the Urban Planning Code of the Russian Federation
# 00170802777505
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-29, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the presence of a construction permit fulfilling the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 00170701875506
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-11, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the fulfillment of the instruction to eliminate the identified violations