# 00170802850691
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-25, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of the instructions of the federal executive authorities authorized to carry out federal state supervision
# 222004323631
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-02-28, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izvescheniyah 1 ot 29012020 vh 62VP170 ot 29012020 2 ot 29012020 vh 62VP171 ot 29012020 3 ot 29012020 vh 62VP172 ot 29012020 o srokah zaversheniya rabot podlezhaschih proverke i realizacii programmy provedeniya proverok 1 ot 13092019Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p1 p2 p3 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15152 i 153 stati 48 GrK RF proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 GrK RF
# 221903434575
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902814424
Unscheduled inspection
Start date: 2019-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902679106
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-30, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy proverok 1 ot 28092018 inzhenernye seti po izvescheniyu o srokah zaversheniya rabot podlezhaschih proverki 21 ot 02042019kirpichnaya kladka sten 2 etazha v osyah 611 s ustroistvom perekrytiya 22 ot 02042019kirpichnaya kladka sten 2 etazha v osyah 15 s ustroistvom perekrytiya Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya pp123 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221902648615
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-30, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to implement the inspection program from 26022018 3 as well as to verify the information contained in the notice on the completion dates of works to be checked during the construction of a capital construction facility from 02042019 3 vx from 05042019 62VP3348 namely, the performance of work on the installation and erection of structures of the aboveground part of the 2nd floor, the objectives of this inspection are to check the capital construction facility prevention identification and suppression of violations committed by the person carrying out construction of violations of the legislation on urban planning activities, including the requirements of design documentation, the subject of this audit is pp 1 3 ch2 st54 of the GrK of the Russian Federation verification of compliance with the execution of works and construction materials used in the construction of a capital construction facility as well as the results of such work with the requirements of design documentation compliance with the mandatory requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 221902443283
Unscheduled inspection
Start date: 2019-01-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902461281
Unscheduled inspection
Start date: 2019-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221802290016
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-17, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: S celyu proverki svedenii soderzhaschihsya v izveschenii o srokah zaversheniya rabot podlezhaschih proverke ot 06122018 vh 31VP6594 ot 06122018 Zadachami nastoyaschei proverki yavlyayutsya proverka obekta kapitalnogo stroitelstva preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschem stroitelnyi kontrol zastroischika narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch 2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221802425298
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Altaiskomu krayu
Purpose of inspection:
# 221800754492
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221800556133
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-24, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii pri stroitelstve 4 ot 02072018 vh 31VP3476 ot 02072018 i realizacii programmy proverok ot 27102017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 221800504244
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-06-28, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok 1 ot 14092017g Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 221800399663
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-30, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii pri stroitelstve 3 ot 21052018 vh 31VP2685 ot 21052018 i realizacii programmy proverok ot 27102017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 221800306471
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-20, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii pri stroitelstve 2 ot 21032018 vh 31VP1272 ot 22032018 i realizacii programmy proverok ot 27102017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 221800263611
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-05-03, duration: —
Authority: YUzhnoSibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: kontrol vypolneniya ranee vydannogo Altaiskomu kraevomu gosudarstvennomu unitarnomu predpriyatiyu Altaistroizakazchik predpisaniya organa gosudarstvennogo kontrolya nadzora ot 02022018 180010 srok dlya ispolneniya kotorogo istek 02042018g
# 001800068230
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-29, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: provoditsya s celyu kontrolya vypolneniya ranee vydannogo Altaiskomu kraevomu gosudarstvennomu unitarnomu predpriyatiyu «Altaistroizakazchik» predpisaniya ot 25 dekabrya 2017g 17180032PKIP647
# 221800089411
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii o srokah zaversheniya rabot podlezhaschih proverke pri stroitelstve obekta kapitalnogo stroitelstva 118 ot 06022018 vh 31VP520 ot 06022018 i realizacii programmy proverok ot 27102017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 22170803018945
Unscheduled inspection
Start date: 2017-12-22, end date: 2017-12-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii 3 ot 15122017 o srokah zaversheniya rabot podlezhaschih proverke pri stroitelstve obekta kapitalnogo stroitelstva vh 31VP6420 ot 15122017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 00170802850691
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-25, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of the instructions of the federal executive authorities authorized to carry out federal state supervision
# 22170802983619
Unscheduled inspection
Start date: 2017-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22170802888853
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii o srokah zaversheniya rabot podlezhaschih proverke pri rekonstrukcii obekta kapitalnogo stroitelstva 1 ot 02112017 vh 264PA2333 ot 08112017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 22170802766684
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-31, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Altaiskomu krayu
Purpose of inspection: kontrolya za ispolneniem predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti ot 28102016g 3081117
# 22170802679527
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-04, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ot 18092017 042 vh 31VP4636 ot 18092017 ob okonchanii stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 00170802711138
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-11, duration: —
Authority: Ministerstvo kultury Altaiskogo kraya
Purpose of inspection: osuschestvleniya kontrolya za vypolneniem predpisaniya ob ustranenii vyyavlennyh narushenii k aktu proverki ot 28042015 14 srok dlya ispolneniya kotorogo istekproverka vypolneniya ukazannyh v predpisanii meropriyatii v ustanovlennye srokivypolnenie predpisaniya upravleniya
# 22170802419166
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-09-13, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki izvescheniya ot 01092017 2 ob ustranenii narushenii pri stroitelstve rekonstrukcii obektov kapitalnogo stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 22170701814572
Unscheduled inspection
Start date: 2017-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22170701776951
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-27, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 20062017 ob ustranenii narushenii pri stroitelstve rekonstrukcii obektov kapitalnogo stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii»
# 22170701665665
Unscheduled inspection
Start date: 2017-05-31, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 22170701532155
Unscheduled inspection
Start date: 2017-04-12, end date: 2017-04-12, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of elimination of violations of the task prevention detection and suppression of violations of the legislation on urban development the subject is to verify the completed construction of the object, checking the compliance of the work and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22170701498206
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-03-31, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701258810
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-20, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii ukazannyh v akte proverki zadachi preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti predmetom yavlyaetsya proverka zakonchennogo stroitelstvom obekta proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 22160701118419
Unscheduled inspection
Start date: 2016-11-16, end date: 2016-11-17, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to verify the information contained in the notice of elimination of violations committed during construction tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements equipment of the capital construction facility with metering devices for used energy resources compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701060997
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-10-28, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701058643
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-10-31, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700881556
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 22160700057303
Unscheduled inspection
Start date: 2016-08-24, end date: 2016-08-25, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700045181
Unscheduled inspection
Start date: 2016-08-19, end date: 2016-08-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka realizacii programmy proverok zadachi preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti predmetom yavlyaetsya proverka zakonchennogo stroitelstvom obekta proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF