Found 180 inspections:

# 002101390479
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-02-08, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-2", located at the address: Tyumen region, Tyumen city, house 241.


# 002101390455
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 002100910817
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 002100910427
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 002100262197
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 002100262165
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-02-08, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order dated 05/06/2021 No. 540k on the basis of a notice on the elimination of violations during construction, reconstruction of a capital construction facility dated 05/31/2021.. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city. Compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies.


# 722005145344
Unscheduled inspection
Start date: 2020-09-30, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 722101397979
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration: 15
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: carrying out state construction supervision on the basis of a notice of completion of construction, reconstruction of a capital construction facility dated 11/23/2021. the objectives of this inspection are: prevention, identification and suppression of violations of the legislation on urban planning activities committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, in particular including technical regulations and design documentation for the construction of a capital construction facility: "Residential development of the Tyumen Sloboda district, Tyumen. Block 9. Multi-storey residential building GP-2, located at the address: Russian Federation, Tyumen region, Tyumen city, Vadim Bovanenko street, 4 The subject of this audit is (to note the necessary): compliance with mandatory requirements


# 722101397876
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration: 15
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: carrying out state construction supervision on the basis of a notice of completion of construction, reconstruction of a capital construction facility dated 11/23/2021. the objectives of this inspection are: prevention, identification and suppression of violations of the legislation on urban planning activities committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, in particular including technical regulations and design documentation for the construction of a capital construction facility: "Residential development of the Tyumen Sloboda district, Tyumen. Block 9. Multi-storey residential building GP-1, located at the address: Russian Federation, Tyumen region, Tyumen city, Vadim Bovanenko street, 4, building 1 The subject of this audit is: compliance with mandatory requirements


# 002101390479
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-02-08, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-2", located at the address: Tyumen region, Tyumen city, house 241.


# 002101390455
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-02-08, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 722101347628
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 722101347540
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 722101169067
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 722101168673
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 002100910817
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-03-03, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: In order to verify the elimination of violations according to the order dated 07/27/2021 No. 941k on the basis of a notice on the elimination of violations during construction, reconstruction of a capital construction facility dated 09/10/2021, prevention, detection and suppression of violations of the legislation on urban development committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations, and design documentation for the construction of a capital construction facility: "Residential buildings (territory 1 according to GPZ RU-72304000-0282) in the integrated development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". "Multi-storey residential building GP-2", located at the address: 241 Tyumen city, Tyumen, Russian Federation, the city of Tyumen, compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies.


# 002100910427
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-03-03, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: In order to verify the elimination of violations according to the order dated 07/27/2021 No. 939k on the basis of a notice on the elimination of violations during construction, reconstruction of a capital construction facility dated 09/10/2021, prevention, identification and suppression of violations of the legislation on urban development committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations, and design documentation for the construction of a capital construction facility: "Residential buildings (territory 1 according to GPZ RU-72304000-0282) in the integrated development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". "Multi-storey residential building GP-1", located at 240 Tyumen city, Tyumen, Russian Federation, Tyumen region, compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies.


# 722100573766
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 722100573266
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 722100533821
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 722100343032
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 722100343260
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of: implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 07/06/2021 The objectives of this audit are: prevention, detection and suppression of violations of legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Complex development of the territory on a plot of land in the alignment of Yamskaya - Medovaya streets in Tyumen. Multi-storey residential building with non-residential premises GP-5", located at the address: Russian Federation, Tyumen region, Tyumen city district, Tyumen city, Anatoly Klindyuk str., building 2, building 1 The subject of this audit is: compliance with mandatory requirements


# 722100333019
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: 5
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of: carrying out state construction supervision on the basis of the notice of the beginning of construction, reconstruction of the capital construction facility dated 06/22/2021 No. 1. The objectives of this audit are: prevention, detection and suppression of violations of legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Complex development of the territory on a plot of land in the alignment of Yamskaya — Medovaya streets in Tyumen. Quarterly boiler room", located at the address: Russian Federation, Tyumen region, Tyumen city district, Tyumen city, Anatoly Klindyuk Street, building 4, building 1. The subject of this review is: compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements


# 722100378778
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 722100371033
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: carrying out state construction supervision on the basis of notice No. 1 on the beginning of construction, reconstruction of a capital construction facility dated 07/16/2021. the objectives of this inspection are: prevention, detection and suppression of violations of the legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations, and design documentation for the construction of a capital construction facility: "Complex development of the territory on a plot of land in the alignment of Yamskaya — Medovaya streets in Tyumen. Multi-storey residential building with non-residential premises GP-9", located at the address: Russian Federation, Tyumen region, Tyumen city district, Tyumen city, Anatoly Klindyuk Street, house 1 The subject of this audit is the compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements


# 722100343150
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 002101390450
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 002100314400
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-2", located at the address: Tyumen region, Tyumen city, house 241.


# 002100314374
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 002100394721
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-02-08, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order dated 05/06/2021 No. 540k on the basis of a notice on the elimination of violations during construction, reconstruction of a capital construction facility dated 05/31/2021.. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city. Compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies.


# 002100262197
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-02-08, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order dated 05/06/2021 No. 540k on the basis of a notice on the elimination of violations during construction, reconstruction of a capital construction facility dated 05/31/2021.. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-2", located at the address: Tyumen region, Tyumen city, house 241. Compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies.


# 002100262165
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-02-08, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order dated 05/06/2021 No. 540k on the basis of a notice on the elimination of violations during construction, reconstruction of a capital construction facility dated 05/31/2021.. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city. Compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies.


# 722100266597
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: this check is carried out for the purpose of: checking the elimination of violations according to the order 475k dated 04/23/2021 on the basis of the notice on the elimination of violations during construction, reconstruction of the capital construction facility No. 2 dated 05/31/2021 The objectives of this audit are: prevention, detection and suppression of violations of legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Complex development of the territory on a plot of land in the alignment of Yamskaya-Medovaya streets in Tyumen. Multi-storey residential building with non-residential premises GP-4", located at the address: 6 Selektsionnaya str., Tyumen city, Tyumen city, Tyumen city, Tyumen region, Russian Federation The subject of this audit is: compliance with mandatory requirements


# 722100265703
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration:
Authority:
Purpose of inspection:


# 722100187672
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-04-12, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Complex development of the territory on a land plot in the alignment of Yamskaya - Medovaya streets in the city of Tyumen. Multi-storey residential building with non-residential premises GP-5", located at the address: Russian Federation, Tyumen region, Tyumen city district, Tyumen city, Anatoly Klindyuk str., building 2, building 1


# 002100262158
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 002100262154
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 002100120382
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-05-06, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-2", located at the address: Tyumen region, Tyumen city, house 241.


# 002100120271
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 722100119320
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-12, duration: 6
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Complex development of the territory on a land plot in the alignment of Yamskaya - Medovaya streets in the city of Tyumen. Multi-storey residential building with non-residential premises GP-5", located at the address: Russian Federation, Tyumen region, Tyumen city district, Tyumen city, Anatoly Klindyuk str., building 2, building 1


# 722100074093
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-02-04, duration: 3
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU – 72304000-0282) in complex development territories at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-3, located at 239 Tyumen city, Tyumen, Russian Federation


# 722100094554
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-02-04, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Complex development of the territory on a plot of land in the alignment of Yamskaya-Medovaya streets in Tyumen. Multi-storey residential building with non-residential premises GP-4", located at the address: 6 Selektsionnaya str., Tyumen city, Tyumen city, Tyumen city, Tyumen region, Russian Federation


# 722100094543
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-02-04, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU – 72304000-0282) in complex development territories at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-3, located at 239 Tyumen city, Tyumen, Russian Federation


# 722000079159
Unscheduled inspection
Start date: 2021-03-23, end date: 2021-03-31, duration: 7
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development of the Tyumen Sloboda district, Tyumen. Block 9. Multi-storey residential building GP-2, located at the address: Russian Federation, Tyumen region, Tyumen city, Vadim Bovanenko street, 4


# 722000079143
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration:
Authority:
Purpose of inspection:


# 722105297087
Unscheduled inspection
Start date: 2021-01-12, end date: 2021-02-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-2", located at the address: Tyumen region, Tyumen city, house 241.


# 722105297037
Unscheduled inspection
Start date: 2021-01-12, end date: 2021-02-08, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility dated 11/16/2020. Prevention, detection and suppression of violations of the legislation on urban planning activities, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Residential development (territory 1 according to GPZ RU-72304000-0282) in complex development of the territory at the address: Tyumen region, Tyumen, KN 72:23:0215001:165. Multi-storey residential buildings GP-1, GP-2, GP-3". Multi-storey residential building GP-1", located at 240 Tyumen region, Tyumen city.


# 722005264695
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration:
Authority:
Purpose of inspection:


# 722005264692
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-22, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP4" located at Tyumen Zapolyarnaya str., 9


# 722005206900
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-13, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP2 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4


# 722005206893
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 722005202697
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 722005202694
Unscheduled inspection
Start date: 2020-10-30, end date: 2020-11-26, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP4" located at Tyumen Zapolyarnaya str., 9


# 722004463031
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP2 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4


# 722004463001
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP1 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4 building 1


# 722005115315
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 722004445718
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 722004445672
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-17, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP5" located at the address Russian Federation Federation Tyumen region Tyumen Zapolyarnaya str 11 building 1


# 722004445669
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-06-23, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP4" located at Tyumen Zapolyarnaya str., 9


# 722004434874
Unscheduled inspection
Start date: 2020-06-18, end date: —, duration:
Authority:
Purpose of inspection:


# 722004434412
Unscheduled inspection
Start date: 2020-06-18, end date: 2020-07-03, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP2 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4


# 722004434407
Unscheduled inspection
Start date: 2020-06-18, end date: 2020-07-03, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP1 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4 building 1


# 722004438833
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration:
Authority:
Purpose of inspection:


# 722004416982
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-23, duration: 17
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP5" located at the address Russian Federation Federation Tyumen region Tyumen Zapolyarnaya str 11 building 1


# 722004416978
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-23, duration: 17
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP4" located at Tyumen Zapolyarnaya str., 9


# 722004407872
Unscheduled inspection
Start date: 2020-05-14, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 722004408536
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility from 30042020 Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of an apartment building located at address Russian Federation Tyumen region Tyumen Turinskaya street 21 23 25 Kashirskaya Turinskaya street 2319


# 722004400845
Unscheduled inspection
Start date: 2020-04-23, end date: 2020-05-26, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Tyumenskoi oblasti
Purpose of inspection: The present inspection is carried out on the basis of the order of the Federal Service for Labor and Employment dated February 7, 2020, pursuant to the instructions of Deputy Prime Minister of the Russian Federation TA Golikova dated December 27, 2019 TG 1211486 Tasks


# 722004374677
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP4" located at Tyumen Zapolyarnaya str., 9


# 722004374603
Unscheduled inspection
Start date: 2020-03-24, end date: —, duration:
Authority:
Purpose of inspection:


# 722004434431
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority:
Purpose of inspection:


# 722004340436
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority:
Purpose of inspection:


# 722004340411
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP1 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4 building 1


# 722004336384
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections of the capital construction facility dated 25122019 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Apartment Building" located at the address Russian Federation Federation Tyumen region Tyumen Turinskaya str. 21 23 25 Kashirskaya str. Turinskaya 2319


# 722004163248
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-02-05, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification 3 on the completion dates of works subject to verification during the construction reconstruction of a capital construction facility dated 20122019 Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer "Apartment building" located at the address Russian Federation Tyumen region Tyumen Turinskaya str. 21 23 25 Kashirskaya Turinskaya str. 2319


# 722004194127
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-01-17, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 9 Multi-storey residential building GP2 located at the address Russian Federation Tyumen region the city of Tyumen Vadim Bovanenko street 4


# 722004194101
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 721904063161
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: the purpose is to carry out state construction supervision on the basis of the notice of completion of the capital construction facility dated 27112019 2. Prevention of detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Multi-storey residential building with built-in facilities social and cultural center GP10 Tyumen Antipino street Budennogo Old Tobolsk tract" located at Tyumen region Tyumen Antipino street Budennogo Old Tobolsk tract


# 721903982414
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-03, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046328 Multi-storey residential building GP2" located at the address Russian Federation Federation Tyumen region Tyumen Vasily Podshibyakin str., 12


# 721903982354
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-03, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046328 Multi-storey residential building GP1" located at the address Russian Federation Federation Tyumen region Tyumen Vasily Podshibyakin str 12 building 1


# 721904030751
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-09, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP5" located at Tyumen Zapolyarnaya str., building 11, building 1


# 721904030857
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721904030879
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 721903886522
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-11-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The purpose is to carry out state construction supervision on the basis of a notice on the completion dates of works subject to inspection during the construction of a capital construction facility dated 27092019 1 and the inspection program dated 30092019 to prevent the identification and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer. construction of the capital construction facility "Multi-storey residential building with built-in social and cultural facilities GP10 Tyumen Antipino st. Budennogo Old Tobolsk tract" located at Tyumen region Tyumen Antipino st. Budennogo Old Tobolsk tract


# 721903851719
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721903478296
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: the purpose of checking the elimination of violations according to the order of 26072019 1024l on the basis of a notice on the elimination of violations during the construction reconstruction of a capital construction facility from 06092019 1 Prevention identification and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility construction of a "Multi-storey residential building with built-in social and cultural facilities GP10 Tyumen Antipino st. Budennogo Old Tobolsk tract" located at Tyumen region Tyumen Antipino st. Budennogo Old Tobolsk tract


# 721903775360
Unscheduled inspection
Start date: 2019-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 721902981922
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721903762175
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-09-26, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: "Residential development of the Tyumen Sloboda district, Tyumen Block 6, Plot 721713130046329 Multi-storey residential building GP3" located at 11 Zapolyarnaya str., Tyumen


# 001902930181
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-09-24, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" on the basis of the instruction of Deputy Chairman of the Government of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019"the tasks of the inspection are to prevent detection and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts, the subject of verification is compliance by a legal entity in the course of carrying out activities with mandatory requirements of industrial safety safety in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices of lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials used as well as requirements for machinery and equipment and related requirements for these products processes of operation and disposal


# 721903597731
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 721903597421
Unscheduled inspection
Start date: 2019-08-26, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721903597472
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-20, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential building GP5" located at the address Russian Federation Federation Tyumen region Tyumen Zapolyarnaya str 11 building 1


# 721902881074
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice on the completion dates of works subject to verification during the construction reconstruction of a capital construction facility dated 01072019 and the inspection program dated 05072019 Prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer construction of the capital construction facility "Construction of a kindergarten for 360 places in the Yamalsky MKR2 Tyumen with the use of re-application PD" located at 6 Vyuzhnaya Street, Tyumen, Russian Federation, Tyumen region


# 721902846659
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 721902901225
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-08-21, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046328 Multi-storey residential building GP1" located at the address Russian Federation Federation Tyumen region Tyumen Vasily Podshibyakin str 12 building 1


# 721902786386
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721902841047
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification 1 on the elimination of violations during the construction of the reconstruction of the capital construction facility from 07062019 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Apartment building" committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer" located at the address Russian Federation Tyumen region Tyumen Turinskaya street 21 23 25 Kashirskaya Turinskaya street 2319


# 721902699378
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration:
Authority:
Purpose of inspection:


# 721902699154
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration:
Authority:
Purpose of inspection:


# 721902723228
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority:
Purpose of inspection:


# 721902651701
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-05-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 13062018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 6 Plot 721713130046328 Multi-storey residential building GP1" located at the address Russian Federation Tyumen region, Tyumen Vasily Podshibyakin str., 12 building 1


# 721902651728
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-05-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of compliance with regulation 159818k of 14122018 on the elimination of violations during the construction of reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility "Residential development of the Tyumen Sloboda district" committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer Tyumen Block 6 Plot 721713130046328 Multi-storey residential building GP2" located at the address Russian Federation Tyumen region Tyumen Vasily Podshibyakin str. d 12


# 721902604296
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 15102018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility "Construction of a kindergarten for 360 places in the Yamalsky MKR2 Tyumen with the use of re-application PD" located at 6 Vyuzhnaya Street, Tyumen, Russian Federation, Tyumen region


# 721902567207
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-04-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 07122018 154218k Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Apartment Building" located at the address Russian Federation Tyumen region, Tyumen Ul Turinskaya 21 23 25 Kashirskaya street Turinskaya 2319


# 721902546169
Unscheduled inspection
Start date: 2019-03-04, end date: —, duration:
Authority:
Purpose of inspection:


# 721902483741
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 721902421739
Unscheduled inspection
Start date: 2019-01-14, end date: —, duration:
Authority:
Purpose of inspection:


# 721902471720
Unscheduled inspection
Start date: 2019-01-22, end date: 2019-02-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 13112018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the Tyumen Sloboda capital construction facility, Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential GP5 House" located at 11 Zapolyarnaya Street, building 1, Tyumen city, Tyumen, Russian Federation


# 721902471082
Unscheduled inspection
Start date: 2019-01-22, end date: 2019-02-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 13112018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the Tyumen Sloboda capital construction facility, Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential GP3 House" located at 11 Zapolyarnaya Street, Tyumen city, Tyumen, Russian Federation


# 721902471660
Unscheduled inspection
Start date: 2019-01-22, end date: 2019-02-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 13112018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the Tyumen Sloboda capital construction facility, Tyumen Quarter 6 Plot 721713130046329 Multi-storey residential GP4 House" located at 9 Zapolyarnaya Street, Tyumen city, Tyumen, Russian Federation


# 721902520963
Unscheduled inspection
Start date: 2019-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 721902476023
Unscheduled inspection
Start date: 2019-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 721802420023
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 15102018 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility "Construction of a kindergarten for 360 places in the Yamalsky MKR2 Tyumen with the use of re-application PD" located at 6 Vyuzhnaya Street, Tyumen, Russian Federation, Tyumen region


# 721802214465
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Check elimination of violations, according to the prescription from 02102018 116718тя Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object "Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" 3rd place is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721802214120
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Check elimination of violations, according to the prescription from 02102018 116518тя Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object"Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" phase 2 is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721802208998
Unscheduled inspection
Start date: 2018-12-05, end date: 2019-01-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 19112018 on the completion dates of works subject to verification during the construction of reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a multi-storey capital construction facility residential building with built-in social and cultural facilities GP10 Tyumen Antipino st. Budennogo Old Tobolsk tract" located at Tyumen region Tyumen Antipino st. Budennogo Old Tobolsk tract


# 721802332110
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 06/122018 on the completion of construction reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility Residential development of the Tyumen Sloboda district gTyumen Quarter 1 Public housing complex GP 1 consisting of multi-storey residential buildings GP11 GP12 parking GP13 correction The first stage of construction is a multi-storey residential building GP11 located at Tyumen region Tyumen Ulzakaluzhskaya plot 206


# 721802332204
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notification dated 07122018 on the completion of construction reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 1 Public housing complex GP 1 consisting of multi-storey residential buildings GP 11 GP 12 parking GP 13 The second stage of construction Multi-storey residential building GP 12 parking GP 13" located at Tyumen region Tyumen ul Zakaluzhskaya plot 206


# 721802420159
Unscheduled inspection
Start date: 2018-12-19, end date: 2019-01-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision in accordance with the notice from 06122018 on the timing of completion of the work to be inspected in the construction, reconstruction of capital construction object and programme of inspections from 13122018 Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of the object of capital construction, Reconstruction and modernization of PAO Poultry Borovskaya with the increase of the annual production of eggs to 13 billion PCs 6 stages stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 Construction gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment the content of cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020 phase 2 located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721802064569
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 24102018 6 on the completion dates of works subject to verification during the construction reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer "An apartment building with built-in non-residential premises located on a plot of land with cadastral number 72171316002272" located at 23 Linear Street, Tyumen, Russian Federation, Tyumen region


# 721802130017
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of compliance with regulation 118318k dated 04102018 on the basis of a notice dated 29102018 on the elimination of violations during the construction of a reconstruction of a capital construction facility Prevention identification and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility "Residential development Tyumen Sloboda district Tyumen Quarter 1 Public housing complex GP 1 consisting of multi-storey residential buildings GP 11 GP 12 parking lot GP 13 The second stage of construction Multi-storey residential building GP 12 parking lot GP 13" located at Tyumen region Tyumen ul Zakaluzhskaya plot 206


# 721802081163
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 23102018 on the completion dates of works subject to verification during the construction of reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of an apartment building facility, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer residential building" located at the address Russian Federation Tyumen region Tyumen Turinskaya street 21 23 25 Kashirskaya Turinskaya street 2319


# 721802150239
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification 1 dated 07112018 on the beginning of construction of the reconstruction of the capital construction facility Prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility Tyumen Sloboda Block 6 Plot 721713130046329 Multi-storey residential building GP4" located at 9 Zapolyarnaya Street, Tyumen, Russian Federation, Tyumen region


# 721802150208
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification 1 dated 07112018 on the beginning of construction of the reconstruction of the capital construction facility Prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility Tyumen Sloboda Block 6 Plot 721713130046329 Multi-storey residential building GP3" located at 11 Zapolyarnaya Street, Tyumen, Russian Federation, Tyumen region


# 721802150188
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 721802150254
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 721802150137
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721801999488
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 721801998034
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-10-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections for the capital construction object from 15082017 Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object "Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" 3rd place is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721801998008
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-10-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections for the capital construction object from 15082017 Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object"Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" phase 2 is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721801997882
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-10-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections for the capital construction object from 15082017 Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object "Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" phase 1 located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721801998361
Unscheduled inspection
Start date: 2018-09-07, end date: —, duration:
Authority:
Purpose of inspection:


# 721800672903
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-09-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 28062018 67418k on the basis of the notification of 08082018 on the elimination of violations during the construction reconstruction of the capital construction facility Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer "Multi-storey residential buildings with built-in non-residential premises and aboveground closed multi-level parking lots on Bakinsky Komissarov Military street in Tyumen Multi-storey residential building with built-in non-residential premises GP3" located at Tyumen region, Tyumen, Bakinsky Komissarov Street house 1


# 721801950338
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 721801950632
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 721800614084
Unscheduled inspection
Start date: 2018-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 721800531152
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-08-06, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 02042018 prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction and Modernization of PJSC Poultry Farm Borovskaya" with an increase the annual egg production volume is up to 13 billion pieces 6 stages" Stage 2 stage 1 stage Construction of 2 poultry houses with cage equipment for the maintenance of repair young animals according to 59616 poultry farms in PM external supply engineering networks planned year of construction 2017 located at the address Russian Federation Tyumen region Tyumen district RP Borovsky


# 721800610503
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-08-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Check elimination of violations, according to the prescription from 23052018 51718тя Warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object "Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" 3rd place is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721800610482
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721800610452
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721800475565
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification 3 dated 01062018 on the completion dates of works subject to verification during the construction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a residential capital construction facility development of the Tyumen Sloboda district Tyumen Block 6 Plot 721713130046328 Multi-storey residential building GP1" located at the address Russian Federation Tyumen region Tyumen Vasily Podshibyakin street d 12 building 1


# 721800475522
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification 3 dated 01062018 on the completion dates of works subject to verification during the construction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a residential capital construction facility development of the Tyumen Sloboda district Tyumen Block 6 Plot 721713130046328 Multi-storey residential building GP1" located at the address Russian Federation Tyumen region Tyumen Vasily Podshibyakin street d 12 building 1


# 721800467919
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the program of inspections for the capital construction facility from 22082017 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Multi-storey residential buildings with built-in non-residential premises and aboveground closed multi-level parking lots on Bakinsky Komissarov Military Street in Tyumen Multi-storey residential building with built-in non-residential premises GP3" located at Tyumen region, Tyumen, Bakinsky Komissarov Street house 1


# 721800432038
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 07052018 46018 on the basis of the notification of 22052018 on the elimination of violations during the construction of the reconstruction of the capital construction facility Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer "Reconstruction and modernization of PJSC "Poultry farm "Borovskaya" with an increase in annual egg production to 13 billion pieces 6 stages" Stage 2, stage 1, Construction of 2 poultry houses with cage equipment for the maintenance of repair young animals according to 59616 poultry farms in PM external supply engineering networks planned year of construction 2017 located at the address Russian Federation Tyumen region Tyumen district RP Borovsky


# 721800406830
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order on the elimination of violations during the construction of the reconstruction of the capital construction facility from 20042018 38918k Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Residential development of the Tyumen region" committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer Sloboda"Tyumen Quarter 6 Plot 721713130046328 Multi-storey residential building GP1" located at the address Russian Federation Tyumen region, Tyumen Vasily Podshibyakin str. d 12 building 1


# 721800406850
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order on the elimination of violations during the construction of the reconstruction of the capital construction facility from 20042018 39018k Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Residential development of the Tyumen region" committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer Sloboda" Tyumen Quarter 6 Plot 721713130046328 Multi-storey residential building GP2" located at 12 Vasily Podshibyakin Street, Tyumen, Russian Federation, Tyumen region


# 721800290364
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-05-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 06032018 21718k on the basis of the notification of 03042018 on the elimination of violations during the construction of the reconstruction of the capital construction facility Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer "Multi-storey residential buildings with built-in non-residential premises and aboveground closed multi-level parking lots on Bakinsky Komissarov Military street in Tyumen Multi-storey residential building with built-in non-residential premises GP3" located at Tyumen region, Tyumen, Bakinsky Komissarov Street house 1


# 721800324162
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections from 15082017 warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object "Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" 3rd place is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721800324054
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections from 15082017 warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of the object of capital construction, Reconstruction and modernization of PAO Poultry Borovskaya with the increase of the annual production of eggs to 13 billion PCs 6 stages stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020 Phase 1 located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721800324125
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections from 15082017 warning detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of capital construction object "Reconstruction and modernization of PJSC "Poultry "Bohr" with the increase of the annual production of eggs to 13 billion PCs in 6 steps" Stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM external incoming network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020" phase 2 is located at Russian Federation, Tyumen region, Tyumen district MO p Borovskiy


# 721800289245
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-05-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 26032018 on the completion dates of works subject to verification during the construction reconstruction of a capital construction facility and a program for conducting inspections of a capital construction facility dated 02042018 Prevention detection and suppression of violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer and design documentation for the construction of the capital construction facility "Reconstruction and modernization of PJSC "Poultry Farm "Borovskaya" with an increase in annual egg production to 13 billion pieces 6 stages" Stage 2, stage 1, Construction of 2 poultry houses with cage equipment for maintenance of repair young animals according to 59616 poultry farms in PM external supply engineering networks planned year of construction 2017 located at the address Russian Federation Tyumen region Tyumen district RP Borovsky


# 721800252215
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 721800252033
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notification dated 21022018 on the beginning of construction reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban planning activities, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility Residential development of the Tyumen Sloboda district, Tyumen Block 6 Plot 721713130046328 Multi-storey residential building GP1 located at the address Russian Federation Tyumen region Tyumen Vasily Podshibyakin street d 12 building 1


# 721800252372
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration:
Authority:
Purpose of inspection:


# 721800252333
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration:
Authority:
Purpose of inspection:


# 721800230500
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72180803053023
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-02-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 06062017 Prevention of detection and suppression of violations of legislation on urban planning activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of a capital construction facility Residential development of the Tyumen Sloboda district gTyumen Quarter 1 Public Housing complex GP 1 in as part of the multi-storey residential buildings GP11 GP12 parking lot GP13 adjustment The first stage of construction is a multi-storey residential building GP11 located at Tyumen region, Tyumen ul. Zakaluzhskaya plot 206


# 721800184512
Unscheduled inspection
Start date: 2018-01-23, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72170803039477
Unscheduled inspection
Start date: 2017-12-07, end date: —, duration:
Authority:
Purpose of inspection:


# 72170802904220
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notification dated 15112017 1 on the completion of construction reconstruction of a capital construction facility, prevention of detection and suppression of violations of legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility, a drainage network for a residential area within the boundaries of Gubernskaya Zakaluzhskaya Moskovsky tract streets from kol85, taking into account loads of 3 mkr of JSC Zapsibgazprom located at the address Tyumen region g Tyumen in the area of d Patrushev d Ozhogino located at the address Russian Federation Tyumen region Tyumen city Vasily Podshibyakin Street building 22


# 72170802837742
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-12-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections from 15082017Предупреждение detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of the object of capital construction, Reconstruction and modernization of PAO Poultry Borovskaya with the increase of the annual production of eggs to 13 billion PCs 6 stages stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020 2 the place is located at Russian Federation, Tyumen region, Tyumen district MO Borowski


# 72170802837661
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 72170802806209
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: The implementation of the state construction supervision of the program of inspections from 15082017Предупреждение detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and design documentation for reconstruction of the object of capital construction, Reconstruction and modernization of PAO Poultry Borovskaya with the increase of the annual production of eggs to 13 billion PCs 6 stages stage 3 phase 1 Construction of 3 houses with cellular equipment for the maintenance of laying hens in the laying hen places 180000 construction of a gas boiler 1 TP KNS external incoming network engineering planning year of construction 2017 phase 2 Construction accessoriesaccessories center with volume sorting eggs to 35 million units per day in t h external incoming network engineering planning year of construction 20172018 gg 3 turn the Construction of 6 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2018 4 turn the poultry house Construction 4 with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2019 5 turn the Construction of 3 houses with cellular equipment for cornesse 180,000 hen places in the PM outer lead network engineering planning year of construction 2020 3 the place is located at Russian Federation, Tyumen region, Tyumen district MO Borowski


# 72170802806175
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 15082017 Prevention of detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the reconstruction of the capital construction facility Reconstruction and modernization of PJSC Poultry Farm Borovskaya with an increase in annual egg production to 13 billion pieces 6 stages 2 stage 1 stage Construction of 2 poultry houses with cage equipment for the maintenance of repair young animals according to 59616 poultry farms in PM external supply engineering networks planned year of construction 2017 located at the address Russian Federation Tyumen region Tyumen district RP Borovsky


# 72170802762124
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notification dated 10102017 on the completion of construction reconstruction of a capital construction facility, prevention of detection and suppression of violations of legislation on urban planning, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of an object of capital construction "Apartment building for victims of a natural disaster disasters of residents" located at the address Tyumen region Gishim ulPorfirieva 6


# 72170802628016
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-10-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notification dated 04092017 on the completion dates of works subject to verification during the construction reconstruction of a capital construction facility inspection program dated 12092017 Prevention of detection and suppression of violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer capital construction of an "apartment building for residents affected by a natural disaster" located at the address Tyumen region g Ishim Porfirieva str. 6


# 72170701894052
Unscheduled inspection
Start date: 2017-08-15, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72170802290272
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification dated 11082017 on the beginning of construction of the reconstruction of the capital construction facility, prevention of detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Drainage networks for a residential area within the boundaries Gubernskaya Zakaluzhskaya Moskovsky tract streets from kol85, taking into account loads of 3 mkr of JSC Zapsibgazprom located at the address Russian Federation Tyumen region Tyumen Vasily Podshibyakin Street building 22


# 72170701718129
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72170701718144
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration:
Authority:
Purpose of inspection:


# 72170701585547
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program from 23092016, Verification of compliance of completed works with the requirements of technical regulations, norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Multi-apartment residential building for residents affected by a natural disaster" located at the address Tyumen region Gishim ulPorfiryeva 6


# 72160701241443
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 07112016 129416k on the basis of the notification of 23112016 on the elimination of violations during the construction reconstruction of the capital construction facility, Verification of compliance of the work and the construction materials used during construction as well as the results of such work with the requirements of technical regulations other regulatory legal acts of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices energy resources used in the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" GTUMEN Quarter 1 Public housing complex GP2 consisting of multi-storey residential buildings GP21 GP22 parking lot GP23 The second stage of construction Multi-storey residential building GP 21" located at Tyumen region Gtumen Ulzakaluzhskaya plot 206


# 72160701241555
Unscheduled inspection
Start date: 2016-12-14, end date: 2017-01-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order dated 31102016 126316k on the basis of the notification dated 23112016 on the elimination of violations during the construction reconstruction of the capital construction facility, Verification of compliance of the work and the construction materials used during construction as well as the results of such work with the requirements of technical regulations other regulatory legal acts of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices energy resources used in the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" GTUMEN Quarter 1 Public housing complex GP2 consisting of multi-storey residential buildings GP21 GP22 parking lot GP23 The second stage of construction Multi-storey residential building GP22 parking lot GP23" located at Tyumen region Gtumen Ulzakaluzhskaya plot 206


# 72160701162387
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72160700999863
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration:
Authority:
Purpose of inspection:


# 72160700950669
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice on the completion dates of works subject to verification during the construction of a capital construction facility from 04082016 Verification of compliance of the work and the construction materials used during construction as well as the results of such work with the requirements of technical regulations other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy used resources during the construction of the capital construction facility "Residential development of the Tyumen Sloboda district" Tyumen Quarter 1 Public housing complex GP2 consisting of multi-storey residential buildings GP 21 GP 22 parking lot GP 23 The second stage of construction Multi-storey residential building GP 22 parking lot GP 23" located at Tyumen region Tyumen Zakaluzhskaya street plot 206


# 72160700917297
Unscheduled inspection
Start date: 2016-10-05, end date: 2016-10-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notification of the beginning of construction reconstruction of the capital construction facility dated 16092016 Verification of compliance of the work and the construction materials used during construction as well as the results of such work with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the facility capital construction of an "apartment building for residents affected by a natural disaster" located at the address Tyumen region g Ishim Porfirieva str. 6


# 72160700048160
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-09-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 23062016 63216k Verification of compliance of the work and the construction materials used in the construction process, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Residential area"Tyumen Sloboda" Tyumen Quarter 1 Public housing complex GP2 consisting of multi-storey residential buildings GP 21 GP 22 parking lot GP 23 The second stage of construction Multi-storey residential building GP 22 parking lot GP 23" located at Tyumen region Gtumen Ulzakaluzhskaya plot 206


# 72160700048154
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-09-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations according to the order of 22062016 62716k Verification of compliance of the work and the construction materials used in the construction process, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Residential area"Tyumen sloboda" Gtumen Quarter 1 Public housing complex GP1 consisting of multi-storey residential buildings GP11 GP12 parking lot GP13 The second stage of construction Multi-storey residential building GP12 parking lot GP 13" located at Tyumen region Gtumen Ulzakaluzhskaya plot 206


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.