# 002105282524
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-05, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction (ex. No. 261/29259 dated 12/10/2020) in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region. The stage is "The railway infrastructure of the GOK with a shipment volume of 2.3 million tons/year with the prospect of increasing the shipment of finished products to 4.6 million tons/year." Adjustment". An independent object (a group of objects): The construction of the ABC with associated communications of Park A, located at the address: Pimeno-Chernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer.


# 002005267122
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-25, duration: 10
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of paragraphs 2 and 4 of regulation 1046MGSN2020 of 06042020 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities of 30112020 bx 26128176 of 01122020 and a request for verification of the fulfillment of paragraphs 2 and 4 of the previously issued regulation 1046MGSN2020 of 06042020 The objectives of this audit are to carry out control supervision measures for the elimination by a legal entity limited liability company "Eurokhimvolgakaliy" LLC "Eurokhimvolgakaliy" of violations specified in the previously issued instruction from 06042020g 1046MGSN2020, the subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005214167
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-23, duration: 11
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted on the basis of the notification of completion from 23102020 720 Rin 26124447 from 23102020 to verify compliance of work performed and used building materials in the construction process of the object of capital construction "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million that 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, the Phase of the "Rail infrastructure GOK with the shipments of 23 million that with a view to increasing the delivery of finished products to 46 million that" Adjustment Independent object object group Device off-site networks of domestic and drinking water supply pressure sewer gravity and household rainwater drainage" located at Pianoterreno rural settlement, municipal Kotelnikovsky district, Volgograd region, as well as the results of such work to the requirements of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices used energy resourceusage of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including project documentlibraries of this review is the compliance of work performed and used building materials in the construction process of the facility and the results of such work to the requirements of project documentation including requirements for energy efficiency and requirements equipment of a capital construction object metering devices used energy resourcewelcome the requirements of state control surveillance


# 002005162130
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-23, duration: 15
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26114774 dated 17072020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons of 95 KCL Gremyachinsky deposit of Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg" Adjustment" is an independent object group of objects Installation of on-site networks of household water supply and sewerage to buildings stage 1 of Park A on-site rain sewer networks of Park A located at Pimenochernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region as well as the results of such work to the requirements of design documentation, including the requirements The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer.


# 002004497170
Unscheduled inspection
Start date: 2020-08-21, end date: 2020-09-01, duration: 8
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26117183 dated 14082020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg" Adjustment" Independent object group of objects Construction of an overpass over the railway at PK 0+6634 length 29107 m" located at Pimenochernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and equipment requirements of the facility The objectives of this audit are the prevention detection and suppression of violations of the legislation on urban development activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, the subject of this audit is the compliance of the completed works and the applied building materials during the construction of the capital construction facility as well as the results of such works the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of state control and supervision bodies


# 002004468780
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004468753
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26114774 dated 17072020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg"Adjustment" is an independent object group of objects Installation of on-site fire-fighting water supply networks Construction of fire-fighting water reservoirs of the fire extinguishing pumping station of the park "A" located at Pimenochernyanskoye rural settlement of the Kotelnikovsky municipal district of the Volgograd region as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer


# 002004442579
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-07-14, duration: 12
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of control over the execution of LLC "EuroHimVolgaKaliy" regulations 062420 of 03032020 upon expiration of its execution period 03062020 and regulations 063720 of 18032020 upon expiration of its execution period 17062020 Control over the elimination of LLC "EuroHimVolgaKaliy" regulations 062420 of 03032020 and regulations 063720 of 18032020 Compliance with regulations of state control supervision bodies


# 002004389184
Unscheduled inspection
Start date: 2020-04-06, end date: —, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004231749
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-07, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of paragraphs 15 of regulation 10246MGSN2019 of 28112019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 12020 of 20012020 g bx 1358 of 20012020 g The tasks of this inspection are the implementation of measures to control supervision of the elimination by a legal entity LLC Eurohimvolgakali of violations specified in the previously issued regulation 10246MGSN2019 from 28112019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 002004217841
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-31, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of paragraphs 16 of regulation 10128MGSN2019 of 19072019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities bn of 19122019 vh 4433 fax of 19122019 The objectives of this inspection are to carry out measures to control supervision of the elimination by a legal entity limited liability company EuroChiMvolgAkali of violations specified in the previously issued The regulation of 19072019g 10128MGSN2019THE subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 002004210951
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-31, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of paragraphs 139 of regulation 10160MGSN2019 of 13092019 on the basis of notices on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 1663405 of 11112019 g bx 35786 of 12112019 g 1663452 of 26122019 g bx 42042 of 27122019 g 1663453 of 26122019 g bx 42043 of 27122019 g The tasks of this check are the implementation of measures for the control and supervision of the elimination by a legal entity of EuroChiMvolgAkali LLC of violations specified in the previously issued regulation 10160MGSN2019 of 13092019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001904119443
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-18, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the execution by a legal entity of LLC "EuroHimVolgaKaliy" n 1 2 of the previously issued regulation 06902019 of 09082019 upon expiration of the deadlines for their execution, the objectives of this audit are to monitor the elimination by a legal entity of LLC "EuroHimVolgaKaliy" n 1 and 2 of the previously issued regulation 06902019 of 09082019, the deadline for which expired on 09112019, the fulfillment of the instructions of the state control supervision bodies municipal control bodies


# 001904003768
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-28, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment of paragraphs 19 of regulation 10162MGSN2019 of 13092019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 1663406 of 11112019 g vh 35788 of 12112019 g The objectives of this audit are the implementation of measures to control supervision of the elimination by a legal entity LLC "Eurohimvolgakali" of violations specified in the previously issued regulation from 13092019 10162MGSN2019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001903983572
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted on the basis of the Programme of inspections approved by the Deputy head of the lower Volga Department of Rostekhnadzor Vasiliev EG 11022019гЗадачами of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is the checks of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Volgograd Mine mine" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the project documentation with the changes made in the project documents in accordance with parts 3_8 and 3_9 article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital stroitelstvoimoti requirements established in parts 3_1 2 and 3 of article 52 of the town planning code of the Russian Federation


# 001903915030
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-28, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the compliance of construction and installation works and construction materials used at the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of the GOK with a shipment volume of 23 million tons per year with the prospect of increasing the shipment of finished products to 46 million tons per year" Adjustment" to the requirements of project documentation and compliance with the requirements of parts of Article 52 and Article 53 of the Urban Planning Code of the Russian Federation according to the inspection program approved by the Deputy head of the Nizhnevolzhsky Department of Rostechnadzor Vasiliev EG dated 08062018, the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban planning committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer activities, including project documentation, The subject of this audit is compliance with mandatory requirements


# 001902864731
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the received notice of completion of the construction of Vh 19534 dated 28062019 of the capital construction facility "Mining and processing plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects "Main ventilation unit object 241 and ventilation duct 1 installation of a fire protection 240 heater installation 1 object 242"The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, the subject of this audit is to verify the compliance of the completed works and applied building materials during the construction of the capital construction facility construction as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902864361
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 001902757581
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-17, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of control over the execution by a legal entity of LLC "Eurohimvolgakali" pp 9 10 19 23 24 27 31 33 45 72 76 78 81 82 84 93 95 97105 128 previously issued regulation 75rpP2019 of 05042019 upon expiration of the deadlines for their execution, verification of compliance with the instructions of the state control and supervision bodies


# 001902691371
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the received notice of completion of construction of Vh 11848 dated 12042019 of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Gremyachinsky GOK mine Stage 1 Commissioning of the mine An independent object group of objects "Block complete transformer substation BKTP 5314" The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and project documentation. The subject of this audit is to verify the compliance of completed works and applied building materials during the construction of the capital construction facility "Mining and Processing Plant and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region The Gremyachinsky GOK mine Stage 1 Commissioning of the mine is an independent facility group of facilities "Block complete transformer substation BKTP 5314" as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used


# 001902431433
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-03-18, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of a notification received on the completion of the construction of the capital construction facility "Mining and Processing plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects "First stage of the Salt dump and sludge storage with associated utilities object 380" Vx 83907 dated 27122018 Tasks of this inspections are aimed at preventing, identifying and suppressing violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and project documentation. The subject of this audit is to verify the compliance of completed works and applied building materials during the construction of the capital construction facility "Mining and Processing Plant for the Extraction and Enrichment of Potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects "The first stage of the Salt dump and sludge storage with associated communications object 380" as well as the results of such work to the requirements of technical regulations and design documentation


# 001802052681
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 001801435704
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-10-12, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of paragraphs 113 of regulation 10106MGSN2018VO dated 27042018 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities bn bd vh 54079 dated 30082018. The objectives of this inspection are to carry out measures to control supervision of the elimination by a legal entity limited liability company EuroChiMvolgAkali of violations specified in the previously issued order from 27042018g 10106MGSN2018VO The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 001801379209
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-10-05, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to verify the fulfillment of paragraphs 131 of regulation 10283MGSN2017 dated 08122017 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities bn bd vh 54077 dated 30082018. The objectives of this audit are to carry out measures to control supervision of the elimination by a legal entity limited liability company "EuroChiMvolgAkali" of violations specified in the previously issued order from 08122017g 10283MGSN2017 The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 001800917234
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-14, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to verify the fulfillment of paragraphs 17 of regulation 10195MGSN2018VO dated 13072018 on the basis of a Notice on the elimination of violations during construction reconstruction and overhaul of capital construction facilities bn bd vh reg 54076 dated 30082018. The task of this audit is to carry out measures to control supervision of elimination by a legal entity Limited Liability Company EuroHimVolgaKaliy LLC EuroHimVolgaKaliy TIN 7710473036 violations specified in the previously issued Regulation dated 13072018 10195MGSN2018VO 7 The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 001800105009
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-28, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Inspection Program approved by the Deputy head of the Nizhnevolzhsky Department of Rostechnadzor Vasiliev EG 26012018 The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, the subject of this inspection is compliance mandatory requirements and or requirements established by municipal legal acts


# 00170802915289
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-08, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex" Independent object group of objects of the ABC factory object 7901 with related communications object BKTP 26 and RP1 Electric cable overpasses object 6302 to RP1 from PS220 to BCTP 26 from RP1 to object 7901 from BCTP 26" as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used On the basis of the received notice of completion of the capital construction facility dated 18102017 bn


# 00170802861612
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the execution by the limited liability company "EuroHimVolgaKaliy" of the previously issued order dated 21042017 1065MGSN2017 upon the expiration of the deadline for the execution of paragraphs 18


# 00170802778931
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-10-26, duration:
Authority: YUzhnoe upravlenie gosudarstvennogo zheleznodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: verification of the elimination of violations specified in the regulation of 091217 g 815


# 00160701070552
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-23, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentation


# 00160701222285
Unscheduled inspection
Start date: 2016-12-28, end date: 2017-01-31, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance of the completed works with the requirements of the project documentation


# 00150601397246
Unscheduled inspection
Start date: 2015-12-02, end date: 2015-12-04, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: establishing the facts of violations of the requirements of regulatory legal acts and regulatory and technical documents in the field of industrial safety during drilling operations for geological exploration and production of potassium magnesium salts of Eurochimvolgakaliy LLC


# 00150601312041
Unscheduled inspection
Start date: 2015-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 00150600016828
Unscheduled inspection
Start date: 2015-07-21, end date: —, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00150600016169
Unscheduled inspection
Start date: 2015-07-06, end date: 2015-07-17, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the compliance of the work and the construction materials used in the construction process


# 342101311231
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer, LLC EuroChem–VolgaKaliy, in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation. b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter — the Code) design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code); b) requirements for a construction permit; c) the requirements established by parts 2 and 3.1 of Article 52 of the Code; d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility; e) requirements for the procedure for the implementation of construction control established by the Code and other regulatory legal acts.


# 342101243154
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 342100639899
Unscheduled inspection
Start date: 2021-09-08, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100715289
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100405915
Unscheduled inspection
Start date: 2021-08-04, end date: —, duration:
Authority:
Purpose of inspection:


# 342100294309
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-28, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including project documentation;, The subject of this audit is compliance with mandatory requirements for: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code The Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources; b) availability of a construction permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100286704
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-28, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including project documentation;, the task of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code The Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources; b) availability of a construction permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100286742
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-28, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including project documentation;, the task of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code The Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources; b) availability of a construction permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100286639
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-28, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including project documentation;, the task of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code The Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources; b) availability of a construction permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100251345
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 18
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: compliance of the completed works and the applied building materials during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region. The surface complex. An independent object (a group of objects): Department of storage, preparation and distribution of reagents (facility No. 540)", located at: Pimeno-Chernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; compliance with the regulations of state bodies control (supervision). This inspection is carried out on the basis of the notice of completion of construction dated 05/18/2021 No. b/n (ex. No. 261/13229 dated 05/25/2021) in order to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer.


# 342100198836
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-05-25, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including project documentation;, the task of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code The Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources; b) availability of a construction permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100309311
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100211137
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the compliance of construction and installation works and the construction materials used at the capital construction facility: "Mining and processing plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year of 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region. Surface complex" to the requirements of design documentation and compliance with the requirements of parts of Article 52 and Article 53 of the Urban Planning Code of the Russian Federation, according to the inspection program dated 02/26/2021. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer. The subject of this audit is: compliance with mandatory requirements.


# 342100156581
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-18, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms on the basis of an order from the President of the Russian Federation (paragraph 5.2, paragraph 5 of the Protocol of the operational meeting of the Security Council of the Russian Federation dated 02/23/2021, approved by the By the President of the Russian Federation V.V. Putin on 03/05/2021, No. Pr-356) and the order of the head of the Rostrud M.Y. Ivankov dated 04/02/2021, No. 73


# 342100146114
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-05-12, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection: execution of the order of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 No. 131 "On conducting inspections of working conditions of foreign citizens involved in the implementation of large investment projects", issued in order to implement paragraph 5.2 of the protocol of the operational meeting of the Security Council of the Russian Federation dated 02/02/2021, approved by the President of the Russian Federation V.V.Putin 05.03.2021 No. Pr-356


# 342100161870
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-21, duration: 18
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the implementation of paragraphs 1-19 of the regulation dated 12/30/2020 No. 10-87MGSN/2020 on the basis of a notice on the elimination of violations during construction, reconstruction, and major repairs of capital construction facilities dated 03/29/2021 (ex. No. 261/8274 dated 04/02/2021). The objectives of this audit are: implementation of measures to control (supervise) the elimination of a legal entity – EuroChem-VolgaKaliy LLC violates the violations specified in the previously issued regulation No. 10-87MGSN/2020 dated 12/30/2020. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 342100159492
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-25, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction dated 04/08/2021 No. 11/20 (ex. No. 261/9072 dated 04/08/2021) in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year 95% KCL of the Gremyachinsky Kotelnikovsky deposit the district of the Volgograd region. The stage is "The railway infrastructure of the GOK with a shipment volume of 2.3 million tons/year with the prospect of increasing the shipment of finished products to 4.6 million tons/year." Correction. An independent object (a group of objects): Construction of MGT on PC 26+98.50, length 91.160 m of the park G; construction of MGT on PC 29+17.30, length 20.010 m of the park G; construction of MGT on PC 32+86.60, length 9.820 of the park G; construction of MGT on PC 30+97.05, length 11.840 m of the park G", as well as the results of such works according to the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used; - compliance with the instructions of the state control (supervision) bodies.


# 342100159412
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-25, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the notice of completion of construction dated 03/31/2021 (ex. No. 261/8496 dated 04/05/2021) in order to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region areas. The mine of the Gremyachinsky GOK. (Stage 1. Commissioning of the mine). An independent object (a group of objects): Underground mining operations in an amount sufficient to put the mine into operation (general storage bunker No. 1)", located at: Pimeno-Chernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used; - compliance with the instructions of the state control (supervision) bodies.


# 342100161902
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-21, duration: 18
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of paragraphs 1-2 of the regulation dated 09/18/2020 No. 10-55MGSN/2020 on the basis of a notice on the elimination of violations during construction, reconstruction, overhaul of capital construction facilities dated 03/29/2021 (ex. No. 261/8275 dated 04/02/2021). The objectives of this audit are: implementation of measures to control (supervision) the elimination of a legal entity – EuroChem-VolgaKaliy LLC violations specified in the previously issued regulation dated 09/18/2020 No. 10-55MGSN/2020. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 342100159745
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-25, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction dated 04/08/2021 No. 10/20 (ex. No. 261/9074 dated 04/08/2021) in order to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year 95% KCL of the Gremyachinsky Kotelnikovsky deposit the district of the Volgograd region. The stage is "The railway infrastructure of the GOK with a shipment volume of 2.3 million tons/year with the prospect of increasing the shipment of finished products to 4.6 million tons/year." Correction. An independent object (a group of objects): Construction of retaining walls, length 372.28 m of the park B; construction of the roadbed and drainage structures of the railway in full park B; laying of the upper structure of the track with ballasting and straightening of the path of the park B; construction of gates BP1 and BP2 of the park B; construction of a pipeline and a receiver of the park B; installation of power supply and outdoor lighting of the park B" as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used; - compliance with the instructions of the state control (supervision) bodies.


# 342100041359
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by the limited liability company EuroChem-VolgaKaliy of the previously issued regulation No. 10-16MGSN/2020 dated 09/18/2020 on the basis of the expiration of paragraphs 1-20. The objectives of this audit are: the implementation of measures to control (supervise) the elimination by a legal entity – limited liability company EuroChem-VolgaKaliy (LLC EuroChem-VolgaKaliy) of violations specified in the previously issued regulation dated 09/18/2020 No. 10-16MGSN/2020. The subject of this audit is: - compliance with the instructions of state control (supervision) bodies, municipal control bodies.


# 342100037862
Unscheduled inspection
Start date: 2021-03-03, end date: —, duration:
Authority:
Purpose of inspection:


# 342100023317
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-02-26, duration: 3
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by the limited liability company EuroChem-VolgaKaliy of paragraphs 1-6 of the previously issued regulation No. 10-15MGSN/2020 dated 02/03/2020 on the basis of the expiration of the previously issued regulation No. 10-15MGSN/2020 dated 02/03/2020. The objectives of this audit are: implementation of measures to control (supervise) the elimination by a legal entity – limited liability company EuroChem-VolgaKaliy of violations specified in the previously issued regulation No. 10-15MGSN/2020 dated 02/03/2020. The subject of this audit is: - compliance with the instructions of state control (supervision) bodies, municipal control bodies.


# 002105282524
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-05, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction (ex. No. 261/29259 dated 12/10/2020) in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons/year 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region. The stage is "The railway infrastructure of the GOK with a shipment volume of 2.3 million tons/year with the prospect of increasing the shipment of finished products to 4.6 million tons/year." Adjustment". An independent object (a group of objects): The construction of the ABC with associated communications of Park A, located at the address: Pimeno-Chernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer.


# 002105267143
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-05, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the received notice of completion of construction (Vh. No. 261/28176 dated 12/01/2020) of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons per year 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region. The mine of the Gremyachinsky GOK. (Stage 1. Commissioning of the mine). An independent object (a group of objects): Underground mine workings in an amount sufficient to put the mine into operation (near-trunk yard and service chambers (CSN) (main drainage system))". The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of an agreement with the developer or customer. The subject of this review is: - verification of the compliance of the completed works and the applied building materials during the construction of the capital construction facility: "Mining and processing plant for the extraction and enrichment of potash salts with a capacity of 2.3 million tons per year of 95% KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region. The mine of the Gremyachinsky GOK. (Stage 1. Commissioning of the mine). An independent object (a group of objects): Underground mining operations in an amount sufficient to put the mine into operation (near-trunk yard and service chambers (CSN) (main drainage system))", as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; - compliance with the instructions of state control (supervision) bodies, municipal control bodies.


# 002005267099
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-31, duration: 14
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the received notice of completion of construction of Vh 26127893 dated 27112020 of the capital construction facility "Mining and Processing plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects Central compressor station object 570 Process water system Reservoir Water treatment and distribution object 554 with associated communications Recycled water system Reservoir Water treatment and distribution facility 553 with associated communications Inter-shop finished product transportation tract facility 449 of the "H" brand with associated communications facilities 441 443 445 4462 hydraulic fracturing with external and on-site gas supply and a group of facilities in accordance with sections of the working documentation 100203WD0002GS5 internal gas supply of the building 540 in accordance with the working documentation 100203WD54002GS"The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and design documentationthe subject of this audit is to verify the compliance of completed works and applied building materials during the construction of a capital construction facility, as well as the results of such work with the requirements of the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with the requirements of state control bodies supervision of municipal control bodies


# 002005267122
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-25, duration: 10
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of paragraphs 2 and 4 of regulation 1046MGSN2020 of 06042020 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities of 30112020 bx 26128176 of 01122020 and a request for verification of the fulfillment of paragraphs 2 and 4 of the previously issued regulation 1046MGSN2020 of 06042020 The objectives of this audit are to carry out control supervision measures for the elimination by a legal entity limited liability company "Eurokhimvolgakaliy" LLC "Eurokhimvolgakaliy" of violations specified in the previously issued instruction from 06042020g 1046MGSN2020, the subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 342005292562
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-18, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: but the real test is conducted in accordance with the program of inspections to assess compliance activities conducted at the site to the requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and compliance of work and applicable construction materials in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b availability building permits in the implementation of the requirements provided for by parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 342005335817
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-18, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC Eurokhimvolgakaliy in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in The purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation


# 002005101167
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-27, duration: 20
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted on the basis of the Programme of inspections approved by the Deputy head of the lower Volga Department of Rostekhnadzor Zotov MV 03022020гЗадачами of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is the checks of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Surface complex" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the project documentation with the changes made in the project documents in accordance with parts 3_8 and 3_9 article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital stroitelstvoimoti requirements established in parts 3_1 2 and 3 of article 52 of the town planning code of the Russian Federation


# 002005214167
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-23, duration: 11
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted on the basis of the notification of completion from 23102020 720 Rin 26124447 from 23102020 to verify compliance of work performed and used building materials in the construction process of the object of capital construction "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million that 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, the Phase of the "Rail infrastructure GOK with the shipments of 23 million that with a view to increasing the delivery of finished products to 46 million that" Adjustment Independent object object group Device off-site networks of domestic and drinking water supply pressure sewer gravity and household rainwater drainage" located at Pianoterreno rural settlement, municipal Kotelnikovsky district, Volgograd region, as well as the results of such work to the requirements of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices used energy resourceusage of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including project documentlibraries of this review is the compliance of work performed and used building materials in the construction process of the facility and the results of such work to the requirements of project documentation including requirements for energy efficiency and requirements equipment of a capital construction object metering devices used energy resourcewelcome the requirements of state control surveillance


# 002005162130
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-23, duration: 15
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26114774 dated 17072020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons of 95 KCL Gremyachinsky deposit of Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg" Adjustment" is an independent object group of objects Installation of on-site networks of household water supply and sewerage to buildings stage 1 of Park A on-site rain sewer networks of Park A located at Pimenochernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region as well as the results of such work to the requirements of design documentation, including the requirements The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer.


# 002005101194
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-29, duration: 19
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted on the basis of the Programme of inspections approved by the Deputy head of the lower Volga Department of Rostekhnadzor Zotov MV 30042020гЗадачами of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is the checks of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Volgograd Mine mine" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the project documentation with the changes made in the project documents in accordance with parts 3_8 and 3_9 article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital stroitelstvoimoti requirements established in parts 3_1 2 and 3 of article 52 of the town planning code of the Russian Federation


# 002004451634
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the received notice of completion of construction of Vh 26113235 from 30062020 of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects" The objectives of this inspection are to prevent identify and suppress the violations committed by the developer, the customer and a person carrying out construction on the basis of a contract with a developer or a customer for violations of legislation on urban planning activities, including technical regulations and design documentationthe subject of this audit is to verify the compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of a capital construction facility metering devices for energy resources used to comply with the requirements of state control bodies supervision of municipal control bodies


# 002004497170
Unscheduled inspection
Start date: 2020-08-21, end date: 2020-09-01, duration: 8
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26117183 dated 14082020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg" Adjustment" Independent object group of objects Construction of an overpass over the railway at PK 0+6634 length 29107 m" located at Pimenochernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and equipment requirements of the facility The objectives of this audit are the prevention detection and suppression of violations of the legislation on urban development activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, the subject of this audit is the compliance of the completed works and the applied building materials during the construction of the capital construction facility as well as the results of such works the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of state control and supervision bodies


# 342004485488
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-21, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including project documentationthe task is to prevent identify and suppress violations of the legislation of the Russian Federation, including project documentationsubject compliance with mandatory requirements in relation to the conformity of work and applied building materials in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004485469
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-21, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including project documentationthe task is to prevent identify and suppress violations of the legislation of the Russian Federation, including project documentationsubject compliance with mandatory requirements in relation to the conformity of work and applied building materials in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004485451
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 342004889254
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-04, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: but the real test is conducted in accordance with the program checks received by the representative of the developer OOO "Ibrahimbayli" with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b permit construction in the implementation of the requirements provided for by parts 2 3 and 31 of article 52 of the town planning code of the Russian Federation


# 002004468816
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that the real test is conducted on the basis of the notice of completion of construction Rin 26114773 from 17072020 to verify compliance of work performed and used building materials in the construction process of the object of capital construction "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million that 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, the Phase of the "Rail infrastructure GOK with the shipments of 23 million that with a view to increasing the delivery of finished products to 46 million that" Adjustment" Independent object object group BMK Device with thermal networks for heating tanks sprinkler Park "And" device of a gas pipeline Park "A" located at Pianoterreno rural settlement, municipal Kotelnikovsky district, Volgograd region, as well as the results of such work to the requirements of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices used energy resourceusage of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including project documentlibraries this check alleycatallies of work performed and used building materials in the construction process of the facility and the results of such work to the requirements of project documentation, including the requirements of energy efficiency and requirements of equipment the object of capital construction of the metering devices of energy resourcewelcome the requirements of state control surveillance


# 002004468780
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26114772 dated 17072020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons of 95 KCL Gremyachinsky deposit of Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg" Adjustment" is an independent object group of objects Construction of a car preparation point PPV Park "A" located at Pimenochernyanskoye rural settlement of Kotelnikovsky municipal district of the Volgograd region, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer. The subject of this audit is the compliance of completed works and applied building materials during the construction of a capital construction facility, as well as the results of such work with the requirements of project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation. including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of state control and supervision bodies


# 002004468753
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of construction of vh 26114774 dated 17072020 in order to verify the compliance of the completed works and the construction materials used during the construction of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Stage "Railway infrastructure of GOK with a shipment volume of 23 million tons tg with the prospect of increasing the shipment of finished products to 46 million tg"Adjustment" is an independent object group of objects Installation of on-site fire-fighting water supply networks Construction of fire-fighting water reservoirs of the fire extinguishing pumping station of the park "A" located at Pimenochernyanskoye rural settlement of the Kotelnikovsky municipal district of the Volgograd region as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer


# 342004455356
Unscheduled inspection
Start date: 2020-06-25, end date: 2020-07-22, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in connection with the receipt by the Inspection of 19062020 of the notification of the completion of the construction of the Facility in order to assess the compliance of the Facility with the requirements of the design documentation b the task of this inspection is to ensure that the Facility meets the requirements of the design documentation 7 The subject of this inspection is compliance with mandatory requirements regarding the compliance of construction works, their results and applied building materials with the requirements of regulatory legal acts and project documentation


# 342004454732
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-07-03, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the real test is conducted in accordance with the program checks received by the representative of the developer OOO "Ibrahimbayli" with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b permit construction in the implementation of the requirements provided for by parts 2 3 and 31 of article 52 of the town planning code of the Russian Federation


# 002004442579
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-07-14, duration: 12
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of control over the execution of LLC "EuroHimVolgaKaliy" regulations 062420 of 03032020 upon expiration of its execution period 03062020 and regulations 063720 of 18032020 upon expiration of its execution period 17062020 Control over the elimination of LLC "EuroHimVolgaKaliy" regulations 062420 of 03032020 and regulations 063720 of 18032020 Compliance with regulations of state control supervision bodies


# 342004435679
Unscheduled inspection
Start date: 2020-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 342004435678
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-07-07, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Objective Assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including project documentation Tasks Prevention identification and suppression of violations of the legislation of the Russian Federation, including project documentation Subject to compliance with mandatory requirements regarding a compliance of work and applied building materials in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used b the availability of a construction permit c meeting the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004435675
Unscheduled inspection
Start date: 2020-06-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 002004430712
Unscheduled inspection
Start date: 2020-06-16, end date: 2020-07-13, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted based on the received notice of completion of construction Rin 26110768 from 29052020г capital construction object "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Surface a complex of an Independent object object group "checkpoint 2 Checkpoint factory object 657 with associated communications and passenger pavilion Parking facility 652 Parking facility 6525"The objectives of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is to verify compliance of work performed and used building materials in the construction process of the object of capital construction "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Surface a complex of an Independent object object group" Checkpoint 2 Checkpoint factory object 657 with associated communications and passenger pavilion Parking facility 652 Parking facility 6525" as well as the results of such work to the requirements of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital construction of the provisions of state control of the oversight bodies, municipal control


# 002004396432
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the received notice of completion of construction of Bx 2617341 from 27032020 of the capital construction facility "Mining and processing plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects "Housing crushing object 330 with associated communications Main building object 300 Warm transition ABK Factory Main building of object 791 Thickener shelter object 301 Drying department object 420 with associated communications Inter-shop halite waste transportation tract object 369 to the salt dump with associated communications"The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer, including among the technical regulations and design documentationthe subject of this audit is to verify the compliance of completed works and applied building materials during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with the instructions of state control bodies supervision of municipal control bodies


# 002004389184
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-05-06, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the received notice of completion of construction of Vh 2616668 from 23032020 of the capital construction facility "Mining and processing plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex Independent object group of objects "Ore warehouse object 320 stage 1 with associated communications of Inter-shop ore supply routes object 319 with related communications Ore warehouse object 320 Stage 2 with related communications stage 2 construction of GRGOK"The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this audit is to verify the compliance of completed works and applied building materials during the construction of the capital construction facility "Mining and Processing Plant potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Surface complex is an independent object group of objects "Ore warehouse object 320 stage 1 with associated communications of Inter-shop ore supply routes object 319 with associated communications Ore warehouse object 320 stage 2 with associated communications stage 2 construction of the GRGOK" as well as the results of such works the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of state control bodies, supervision of municipal control bodies


# 002004300419
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted on the basis of the Programme of inspections approved by the Deputy head of the lower Volga Department of Rostekhnadzor Zotov MV 29012020гЗадачами of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is the checks of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Volgograd Mine mine" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the project documentation with the changes made in the project documents in accordance with parts 3_8 and 3_9 article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital stroitelstvoimoti requirements established in parts 3_1 2 and 3 of article 52 of the town planning code of the Russian Federation


# 342004314812
Unscheduled inspection
Start date: 2020-02-27, end date: 2020-03-26, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: consideration of an employee's application for violation of his labor rights in the case of 18022020 347 54120OB


# 342004265381
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 002004231749
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-07, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of paragraphs 15 of regulation 10246MGSN2019 of 28112019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 12020 of 20012020 g bx 1358 of 20012020 g The tasks of this inspection are the implementation of measures to control supervision of the elimination by a legal entity LLC Eurohimvolgakali of violations specified in the previously issued regulation 10246MGSN2019 from 28112019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 002004217841
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-31, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of paragraphs 16 of regulation 10128MGSN2019 of 19072019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities bn of 19122019 vh 4433 fax of 19122019 The objectives of this inspection are to carry out measures to control supervision of the elimination by a legal entity limited liability company EuroChiMvolgAkali of violations specified in the previously issued The regulation of 19072019g 10128MGSN2019THE subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 002004210951
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-31, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of paragraphs 139 of regulation 10160MGSN2019 of 13092019 on the basis of notices on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 1663405 of 11112019 g bx 35786 of 12112019 g 1663452 of 26122019 g bx 42042 of 27122019 g 1663453 of 26122019 g bx 42043 of 27122019 g The tasks of this check are the implementation of measures for the control and supervision of the elimination by a legal entity of EuroChiMvolgAkali LLC of violations specified in the previously issued regulation 10160MGSN2019 of 13092019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 341904096834
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: this inspection is carried out in connection with the receipt by the Inspection of the 18112019 notification of the completion of the construction of the Facility in order to assess the compliance of the Facility with the requirements of the design documentationthe purpose of this inspection is to ensure that the Facility meets the requirements of the design documentationthe subject of this inspection is compliance with mandatory requirements regarding the compliance of construction works, their results and applied building materials with the requirements of regulatory legal acts and design documentation


# 341904072904
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: consideration of an employee's application for violation of his labor rights in the case of 24112019 347413919


# 001904063641
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-16, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the received notice of completion of construction of Vx 38089 dated 29112019 of the capital construction facility "Mining and Processing Plant for the extraction and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Gremyachinsky GOK Mine" Stage 1 Commissioning of the mine An independent object group of objects Lifting machinery building 2 object 232" The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, including technical regulations and project documentation. The subject of this audit is to verify the compliance of completed works and applied building materials during the construction of the capital construction facility "Mining and Processing Plant for Mining and enrichment of potash salts with a capacity of 23 million tons per year 95 KCL of the Gremyachinsky deposit of the Kotelnikovsky district of the Volgograd region Mine of the Gremyachinsky GOK" Stage 1 Commissioning of the mine An independent object group of objects Lifting machinery building 2 object 232" as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting of energy resources used compliance with the requirements of state control bodies supervision of municipal control bodies


# 001903994079
Unscheduled inspection
Start date: 2019-12-30, end date: 2020-02-03, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted on the basis of the Programme of inspections approved by IO Deputy head of the lower Volga Department of Rostechnadzor Zotov MV 12112019гЗадачами of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is the checks of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object "Landfill of municipal solid waste and industrial waste IV and V classes of hazards in Kotelnikovsky district, Volgograd region stage II construction cards 12" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the project documentation with the changes made in the project documents in accordance with parts 3_8 and 3_9 article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital stroitelstvoimoti requirements established in parts 3_1 2 and 3 of article 52 of the town planning code of the Russian Federation


# 001904119443
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-18, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the execution by a legal entity of LLC "EuroHimVolgaKaliy" n 1 2 of the previously issued regulation 06902019 of 09082019 upon expiration of the deadlines for their execution, the objectives of this audit are to monitor the elimination by a legal entity of LLC "EuroHimVolgaKaliy" n 1 and 2 of the previously issued regulation 06902019 of 09082019, the deadline for which expired on 09112019, the fulfillment of the instructions of the state control supervision bodies municipal control bodies


# 001904003829
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-28, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment of paragraphs 110 of regulation 10161MGSN2019 of 13092019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 1663407 of 11112019 g vh 35789 of 12112019 g The objectives of this audit are to carry out measures to control supervision of the elimination by a legal entity LLC Eurohimvolgakali of violations specified in a previously issued prescription from 13092019, 10161MGSN2019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001904003768
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-28, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment of paragraphs 19 of regulation 10162MGSN2019 of 13092019 on the basis of a notice on the elimination of violations during construction reconstruction and major repairs of capital construction facilities 1663406 of 11112019 g vh 35788 of 12112019 g The objectives of this audit are the implementation of measures to control supervision of the elimination by a legal entity LLC "Eurohimvolgakali" of violations specified in the previously issued regulation from 13092019 10162MGSN2019, the subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001903983572
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted on the basis of the Programme of inspections approved by the Deputy head of the lower Volga Department of Rostekhnadzor Vasiliev EG 11022019гЗадачами of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer violations of the legislation on town-planning activities including technical regulations and project documentlibraries of this review is the checks of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object "Mining and processing plant for the extraction and enrichment of potassium salts with a capacity of 23 million tons per year, 95 KCL gremyachinskoe Kotelnikovsky district, Volgograd region, Volgograd Mine mine" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the project documentation with the changes made in the project documents in accordance with parts 3_8 and 3_9 article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resourcevalue a building permit for the object of capital stroitelstvoimoti requirements established in parts 3_1 2 and 3 of article 52 of the town planning code of the Russian Federation