# 782100004268
Unscheduled inspection
Start date: 2021-02-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100028118
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-24, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out for the purpose of: monitoring the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 06.12.2019 No. 37-1-750/1/1 (the deadline for elimination is 31.12.2020) the objectives of this inspection are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements
The subject of this audit is:
– compliance with fire safety requirements at the protection facility used (operated) by the organization in the course of its activities
# 782100195574
Unscheduled inspection
Start date: 2021-01-22, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Verification of compliance with labor legislation
# 471904129695
Unscheduled inspection
Start date: 2019-12-20, end date: 2020-01-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of elimination of violations of the mandatory requirements specified in the notice of the person carrying out the construction on elimination of the identified violations The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction metering devices for energy resources used to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction
# 471904129532
Unscheduled inspection
Start date: 2019-12-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 781903948727
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 471903894321
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 471903785038
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer technical customer on completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction
# 471903994759
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over the employer's compliance with the requirements of legislation on special assessment of working conditions
# 781902881914
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-08-08, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu SanktPeterburgu
Purpose of inspection: expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of a previously issued order to eliminate an identified violation of mandatory requirements dated October 29, 2018, 780308574PR18
# 781902820133
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-12, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Determination of compliance of the constructed capital construction facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used compliance with the requirements of h2 h 3 h 31 Art 54 of the Urban Planning Code Prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer during the construction and reconstruction of capital construction facilities, the requirements of technical regulations, other regulatory legal acts and design documentation are checked for compliance with the requirements of the capital construction facility for compliance with the requirements of the design documentation, including fire prevention measures, measures to ensure sanitary and epidemiological welfare of the population, environmental protection, energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 781902692402
Unscheduled inspection
Start date: 2019-05-14, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection:
# 781902619693
Unscheduled inspection
Start date: 2019-04-04, end date: 2019-04-30, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Determination of compliance of the construction materials used in the construction of a capital construction facility and the results of such work with the requirements of the design documentation for the construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, prevention, detection and suppression of violations of the law by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor Compliance of completed works and applied materials, as well as the results of work on the installation of internal and external engineering networks with the requirements of the design documentation
# 781902595720
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 781902555180
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-29, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Compliance of the completed works with the requirements of the project documentation Prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of other regulatory legal acts and project documentation performed during the construction of reconstruction of capital construction facilities Enclosing structures roof walls filling openings
# 471800232927
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Leningradskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor compliance with the mandatory requirements of legislation on the sanitary and epidemiological welfare of the population. The objectives of this audit are to indicate compliance with legislation on the sanitary and epidemiological welfare of the population with legislation on technical regulation. 7 The subject of this audit is to indicate compliance by a legal entity, an individual entrepreneur, in the course of carrying out activities, with the mandatory requirements established by the legislation of the Russian Federation
# 471800242396
Unscheduled inspection
Start date: 2018-02-02, end date: 2018-03-01, duration: —
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt of an application
# 471801962005
Unscheduled inspection
Start date: 2018-02-02, end date: 2018-03-01, duration: —
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt of an application
# 471800242430
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-03-07, duration: —
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Verification of compliance with labor legislation and other regulatory legal acts containing labor law norms
# 471800022109
Unscheduled inspection
Start date: 2018-01-31, end date: 2018-02-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of works at the beginning of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation
# 47170701670252
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-27, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Leningradskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor compliance with the mandatory requirements of legislation in the field of consumer protection on the sanitary and epidemiological welfare of the population on technical regulation Order of the Federal Service for Supervision of Consumer Protection and Human Welfare dated 13032017 132 "On conducting unscheduled field inspections during the preparation and conduct of the 2017 summer wellness campaign" The objectives of this audit are compliance with legislation on consumer rights protection compliance with legislation on the sanitary and epidemiological welfare of the population compliance with legislation on technical regulation The subject of this audit is compliance by a legal entity as an individual entrepreneur in the course of carrying out activities with mandatory requirements established by the legislation of the Russian Federation