Found 16 inspections:

# 542105291002
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection:


# 222004462392
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 222004344338
Unscheduled inspection
Start date: 2020-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 222004223419
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 221904042047
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-02, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose of verifying the information contained in the notice of completion of the capital construction facility 1 dated 17102019 BX 62VP5700 dated 17102019the objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, including the requirements of project documentation7 The subject of this audit is1 p2 p3ch2 st54 GRK RF verification of compliance with the work performed and the construction materials used during construction and reconstruction the capital construction project as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the GRK RF, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the GrK RF and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements The GRC of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 31 of Art 52 of the GrCRF


# 001903804691
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-11-05, duration:
Authority: Dalnevostochnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: implementation of state metrological supervision checks on the handling of under-filling of automobile fuel at a gas filling station owned by Gazoil LLC located at Yakutsk Pokrovskoe Highway 7 km D1A BX 8610127 dated 21082019. The objectives of this audit are to assess the compliance of measurements performed in the field of state regulation to ensure the uniformity of measurements with established requirements. The subject of this audit is to comply with mandatory requirements in the field of state regulation ensuring the uniformity of measurements to measurements of units of quantities to standards of units of quantities to standard samples of measuring instruments Carrying out measures to prevent the threat of harm to the life and health of citizens


# 221902959387
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to verify the information contained in the notice of completion of the reconstruction of the capital construction facility dated 08082019 1 bx dated 08082019 62VP4973THE tasks of this audit are to verify the capital construction facility, prevent identify and suppress violations of the legislation on urban development by the developer, including the requirements of project documentationthe subject of this audit is p1 p2 p3 ch2 st54 GRK RF verification of compliance with the work performed and the applicable construction materials in the process of construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the GRK RF, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the GrK RF and or the information model if the formation and maintenance of the information model they are mandatory in accordance with the requirements of the Civil Engineering Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 31 St 52 of the Civil Engineering Code of the Russian Federation


# 221902945953
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-08, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to verify the information contained in the notice on the elimination of violations during the reconstruction of the capital construction facility from 20062019 1 bx from 20062019 62VP4288 as well as to verify the fulfillment of the instruction on the elimination of identified violations of mandatory requirements from 22032019 AVM117GSN, the deadline for which expired 22042019the objectives of this audit are to verify the capital construction facility prevention detection and suppression of violations of the legislation on urban development by the developer. The subject of this audit is p1 ch2 ST54 of the GRK RF to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements of Parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 221902553284
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-22, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to verify the information contained in the notice of completion of the capital construction facility dated 27022019xx dated 27022019 62VP1908, the objectives of this audit are to verify the capital construction facility, prevent identify and suppress violations of the law on urban development by the developer, including the requirements of the project documentation. The subject of this audit is p1 ch2 st54 GrK RF checking the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, comply with the mandatory requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 221801457968
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-20, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to implement the inspection program 1 dated 01/122017, as well as to verify the fulfillment of the order to eliminate violations of the mandatory requirements of AVM33GSN dated 28042018, the deadline for which expired on 28052018, the objectives of this audit are to verify the capital construction facility, prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation. The subject of this audit is ch2 st54 GrK Russian Federation verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 221800327797
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-04-28, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the elimination of violations contained in the regulation on the elimination of violations during the reconstruction of a capital construction facility AVM21GSN dated 20032018, the objectives of this audit are to verify the capital construction facility, prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GrK RF checking the compliance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the safety of buildings and structures


# 221800199613
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 221800191276
Unscheduled inspection
Start date: 2018-03-14, end date: 2018-03-20, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program and verify the information contained in the notice on the elimination of violations during the reconstruction of the capital construction facility dated 02032018 bx31VP991 dated 02032018, the objectives of this audit are to verify the capital construction facility, prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GrK RF verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the Safety of Buildings and Structures


# 221800098945
Unscheduled inspection
Start date: 2018-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 221800014700
Unscheduled inspection
Start date: 2018-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 221800014308
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-02, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program and verify the information contained in the notice of completion dates for the reconstruction of the capital construction facility dated 15.012018 bx31VP141 dated 16.012018, the objectives of this audit are to verify the capital construction facility, prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is is ch2 st54 GrK RF verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the Safety of Buildings and Structures


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.