# 772101245866
Unscheduled inspection
Start date: 2021-10-27, end date: 2021-11-25, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101249535
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101249435
Unscheduled inspection
Start date: 2021-10-25, end date: 2021-11-23, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101066720
Unscheduled inspection
Start date: 2021-10-01, end date: 2021-10-14, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100706921
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100825085
Unscheduled inspection
Start date: 2021-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100825084
Unscheduled inspection
Start date: 2021-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100436471
Unscheduled inspection
Start date: 2021-08-10, end date: 2021-09-06, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100436473
Unscheduled inspection
Start date: 2021-08-10, end date: 2021-09-06, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100384131
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100384134
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100312249
Unscheduled inspection
Start date: 2021-07-01, end date: 2021-07-28, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100312250
Unscheduled inspection
Start date: 2021-07-01, end date: 2021-07-28, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100322856
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100322857
Unscheduled inspection
Start date: 2021-07-01, end date: 2021-07-28, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100268045
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-07-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100268069
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-07-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100263346
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-07-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100263344
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-07-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100267617
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100267539
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100209478
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-11, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100209497
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-11, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100143836
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100143837
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100158711
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-11, duration: 16
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: 5. Ustanovit, chto celyu i zadachei nastoyaschei proverki yavlyaetsya proverka soblyudeniya obyazatelnyh trebovanii zakonodatelstva ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i (ili) inyh obektov nedvizhimosti.
Predmetom vneplanovoi dokumentarnoi proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i (ili) inyh obektov nedvizhimosti.
# 772100106706
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100108552
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100041694
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100041693
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100040721
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100041695
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100084005
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-20, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100084006
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-20, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100016125
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-17, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772105316881
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772105317243
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105316878
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105317239
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105317238
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005282197
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-30, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of the audit is the fulfillment by the developer of the requirements of part 31 of Article 52 of the Urban Planning Code compliance with the performance of works and applied building materials during the construction reconstruction of the capital construction facility as well as the results of such works the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance with the completed works with the requirements of the project documentation identified during construction control and state construction supervision
# 772005279509
Unscheduled inspection
Start date: 2020-12-22, end date: 2021-01-26, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005284228
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005256484
Unscheduled inspection
Start date: 2020-12-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005295814
Unscheduled inspection
Start date: 2020-12-29, end date: 2021-02-03, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005295813
Unscheduled inspection
Start date: 2020-12-29, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772005253141
Unscheduled inspection
Start date: 2020-12-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005249070
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005249113
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005242016
Unscheduled inspection
Start date: 2020-12-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005251907
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-31, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005251904
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-31, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005251903
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772005298679
Unscheduled inspection
Start date: 2020-12-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005187731
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005206192
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005201854
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005201848
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005245238
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-10, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being checked. The subject of the audit is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code. The conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision
# 772005219303
Unscheduled inspection
Start date: 2020-11-06, end date: 2020-12-03, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of the audit is the fulfillment by the developer of the requirements of part 31 of Article 52 of the Urban Planning Code compliance with the performance of works and applied building materials during the construction reconstruction of the capital construction facility as well as the results of such works the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance with the completed works with the requirements of the project documentation identified during construction control and state construction supervision
# 772005248077
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005248265
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005151770
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005151765
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005141351
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005141350
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005141349
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005200518
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverki provedenie meropriyatii po kontrolyu v svyazi s postupleniem izvescheniya zastroischika zakazchika Zadachi proverki preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnosti Predmet proverki vypolnenie zastroischikom trebovanii chasti 31 stati 52 Gradostroitelnogo kodeksa vypolnenie licom osuschestvlyayuschim stroitelstvotrebovanii chasti 3 stati 52 Gradostroitelnogo kodeksa sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle proverka ustraneniya vyyavlennyh pri provedenii stroitelnogo kontrolya i osuschestvleniya gosudarstvennogo stroitelnogo nadzora narushenii sootvetstviya vypolnennyh rabot trebovaniyam proektnoi dokumentacii
# 772005181057
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005201259
Unscheduled inspection
Start date: 2020-10-30, end date: 2020-11-27, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772004507294
Unscheduled inspection
Start date: 2020-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004500180
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004500178
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-11, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being checked. The subject of the audit is the developer's compliance with the requirements of Part 31 of Article 52 of the Urban Planning Code. The fulfillment by the person carrying out the construction of the requirements of Part 3 of Article 52 of the Urban Planning Code. construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004492142
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004490824
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004500904
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004474430
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004444765
Unscheduled inspection
Start date: 2020-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004448695
Unscheduled inspection
Start date: 2020-07-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004472200
Unscheduled inspection
Start date: 2020-07-31, end date: 2020-08-07, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverki provedenie meropriyatii po kontrolyu v svyazi s postupleniem izvescheniya zastroischika zakazchika Zadachi proverki preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnosti Predmet proverki vypolnenie zastroischikom trebovanii chasti 31 stati 52 Gradostroitelnogo kodeksa sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 772004420147
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004416849
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004396270
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004394458
Unscheduled inspection
Start date: 2020-04-20, end date: 2020-06-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904029182
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803439730
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: fulfillment by the developer of the requirements of part 31 of Article 52 of the Urban Planning Code
# 77190803439729
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: fulfillment by the developer of the requirements of part 31 of Article 52 of the Urban Planning Code
# 77190803444468
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803392536
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803314257
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803279177
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-12-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 771800396340
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-18, duration: —
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: The purpose and objective of this audit is to verify compliance with the mandatory requirements of the legislation on participation in the shared construction of apartment buildings and or other real estate objects The subject of an unscheduled documentary audit is compliance with the requirements of the legislation on participation in the shared construction of apartment buildings and or other real estate objects
# 77180803117429
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803117395
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803117394
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803101926
Unscheduled inspection
Start date: 2018-03-13, end date: 2018-03-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803106221
Unscheduled inspection
Start date: 2018-03-21, end date: —, duration: —
Authority: —
Purpose of inspection: