Found 34 inspections:

# 162005246706
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-02, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 15092020 delo 120420200083Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 162004488732
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004436330
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-06-24, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 18012019 delo 121120190007 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 162004200466
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004219213
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-01-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya ustranennyh narushenii trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii drugih normativnyh aktov norm i pravil opredeleniya fakta ispolneniya predpisaniya a takzhe s celyu sostavleniya akta ob ustranenii narushenii ispolneniya predpisaniya na osnovanii postupivshego v Inspekciyu izvescheniya ot 30122019 13926 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva kotorye bylo predpisano ustranit v srok ustanovlennyi predpisaniem ot 06122019 1212135001 do 17012020 i istecheniya sroka ispolneniya predpisaniya ot 06122019 1212135001 srok ispolneniya kotorogo istek 17012020 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


# 161904015584
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19112019 case 121120180023the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer of the works performed during the construction of the capital construction facility with the requirements of mandatory requirements and or requirements established by municipal authorities. legal acts


# 161904044778
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 11042019 case 121120190049the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161904097491
Unscheduled inspection
Start date: 2019-12-13, end date: 2019-12-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 18012019 delo 121120190007 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 161903988637
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 161903678792
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161903628601
Unscheduled inspection
Start date: 2019-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 161903566825
Unscheduled inspection
Start date: 2019-09-24, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902987301
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-08-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 11042019 case 121120190049the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902993390
Unscheduled inspection
Start date: 2019-08-28, end date: 2019-09-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 31072019 6632 16082019 7424 on the elimination of violations during the construction reconstruction of a capital construction facility that were ordered to be eliminated in the term established by the regulation from 17072019 1212072402 17072019 1212072401 to 19082019 19082019 and the expiration of the period for the execution of the regulation from 17072019 1212072401 17072019 1212072402 the term of which expired 19082019 19082019the objectives of this audit are the prevention as well as the detection and suppression of violations committed by the developer customer the person carrying out construction on the basis of a contract with the developer or customer of compliance with the works performed during the construction of the capital construction facility requirements technical regulations, other regulatory legal acts, and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 161902859794
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 30032018 delo 121120180023Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 161902891752
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 161902786313
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902722735
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902650734
Unscheduled inspection
Start date: 2019-04-17, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902520386
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-03-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 10012019 96 28012019 617 on the elimination of violations during the construction reconstruction of a capital construction facility that were ordered to be eliminated in the period established by the regulation from 15112018 1219111801 15112018 1219111802 to 14122018 14122018 and the expiration of the period of execution of the regulation from 15112018 1219111802 15112018 1219111801 06022019 1212009901, the period of execution of which expired on 14122018 14122018 04032019


# 161902523156
Unscheduled inspection
Start date: 2019-02-22, end date: 2019-02-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya fakta ispolneniya predpisaniya ot 18012019 1212003001 srok ispolneniya kotorogo istek 18022019 18012019 1212003002 srok ispolneniya kotorogo istek 18022019 i sostavleniya akta po rezultatam proverki Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya vybrat nuzhnoe vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


# 161902500195
Unscheduled inspection
Start date: 2019-02-08, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902431456
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902436400
Unscheduled inspection
Start date: 2019-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 161902467402
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-01-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate dated 25/122018 10391 24/122018 10314 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation dated 07/122018 1219/122401 07122018 1219122402 until 14012019, the objectives of this audit are to prevent, identify and suppress violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, municipal control bodies


# 161802184089
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 30032018 delo 121120180023 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 161802091893
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19032018 case 121120180020


# 161800252080
Unscheduled inspection
Start date: 2018-03-30, end date: 2018-03-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya ustranennyh narushenii trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii drugih normativnyh aktov norm i pravil a takzhe s celyu sostavleniya akta ob ustranenii narushenii na osnovanii postupivshego v Inspekciyu izvescheniya ot 26032018 1956 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva kotorye bylo predpisano ustranit v srok ustanovlennyi predpisaniem ot 26022018 1219015901 do 27032018g preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


# 161800101249
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-02-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 17012017 delo 121120170014 preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 16170701409909
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya ustranennyh narushenii trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii drugih normativnyh aktov norm i pravil a takzhe s celyu sostavleniya akta ob ustranenii narushenii na osnovanii postupivshego v Inspekciyu izvescheniya ot 17022017 1277 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva kotorye bylo predpisano ustranit v srok ustanovlennyi predpisaniem ot 07022017 1219012401 do 27032017gZadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii Inspekcii


# 16170701335514
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-02-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 17052016 delo 121120160027Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii


# 16160700863323
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya fakta ispolneniya predpisaniya ot 29082016 1219080301 srok ispolneniya kotorogo istek 15092016 i sostavleniya akta po rezultatam proverkiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii Inspekcii


# 16160700084458
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-08-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 19052016 delo 12112015012402Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 16160601782228
Unscheduled inspection
Start date: 2016-08-10, end date: 2016-08-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya fakta ispolneniya predpisaniya ot 24062016 1219051201 24062016 1219051202 srok ispolneniya kotorogo istek 15072016 i sostavleniya akta po rezultatam proverkiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.