# 002005257579
Unscheduled inspection
Start date: 2020-12-14, end date: 2021-01-18, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 002004269660
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903883376
Unscheduled inspection
Start date: 2019-10-31, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903039747
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001902901293
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902659227
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction by the Federal Tax Service "Centravtomagistral". The purpose of this inspection is to establish the facts of the fulfillment of the above-mentioned instruction by the Federal Tax Service "Centravtomagistral". The subject of this inspection is the fulfillment by the Federal Tax Service "Centravtomagistral" of the instruction to eliminate the identified violations
# 001902442356
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Centralnomu federalnomu okrugu
Purpose of inspection:
# 001802141876
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-16, duration: —
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of paragraphs 1 and 2 of the previously issued instruction dated 28092018 26105C2018K during the construction of a capital construction facility, "Expenses for measures to improve the level of federal highway construction Artificial electric lighting on the A108 Moskovskoe Bolshoe Koltso highway Dmitrov Sergiev Posad Orekhovozuevo Voskresensk Mikhnevo Balabanovo Ruza Klin Dmitrov section from Brest Highway to Minsk Highway on Balabanovo NP km sections 7+200 14+300 np Ermolino km 14+300 15+200 np Mityaevo km 21+700 22+900 Kaluga Region" located at Kaluga region Borovsky district highway A108 "MBK" section from Brest highway to Minsk highway, the deadline for which expired on 19102018 the objectives of this audit are verification of the elimination by a legal entity of the violations identified in paragraphs 1 2 of the previously issued regulation dated 28092018 26105C2018K The subject of this audit is the fulfillment by the legal entity of paragraphs 1 2 of the previously issued regulation dated 28092018 26105C2018K
# 001801876848
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration: —
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to monitor compliance of the performed works with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object "the Cost of measures to improve the level of arrangement of highways of Federal importance of the Device faux electroacustica on the road А108 "Moscow big ring" Dmitrov Sergiev Posad, Orekhovozuevo Voskresensk Mikhnevo Balabanovo Ruza Wedge Dmitrov section from Brest to Minsk highway highway sections NP Balabanovo km 7+200 14+300 NP Ermolino km 14+300 15+200 NP Mytyajeve km 21+700 22+900 Kaluga oblast" the objectives of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder customer violations of the legislation on town-planning activities including technical regulations and project documentation of the Subject of this review is to check the construction of the facility in accordance with the requirements of article 51 of the parts 2 and 3 of article 52 article 53 54 the town-planning code of the Russian Federation of electrical safety and emergency fire safety, environmental protection sanitary and epidemiological norms of labor law compliance of the performed works and construction materials used in the construction process of the facility and the results of such work to the requirements of technical regulations and project documentation other regulatory acts including the requirements of energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation
# 00170701776898
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities committed by persons involved in construction
# 00170701776788
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities committed by persons involved in construction
# 00170701792720
Unscheduled inspection
Start date: 2017-05-23, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 772100307947
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100128837
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-12, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the task of this check is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on on the basis of an agreement with a developer or technical customer, violations of legislation on urban development, including design documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
availability of a building permit;
compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 772100112704
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-19, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the task of this check is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on on the basis of an agreement with a developer or technical customer, violations of legislation on urban development, including design documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
availability of a building permit;
compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 772100112673
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-19, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction based on a contract with a developer or technical customer, violations of legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
availability of a building permit;
meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 772100019605
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-27, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of the work performed with the mandatory requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources and other regulatory legal acts. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation, including project documentation, energy conservation and energy efficiency requirements, committed by the developer, the technical customer, as well as by the person carrying out the reconstruction on the basis of a contract with the developer or the technical customer. The subject of this review is: compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code Of the Russian Federation.
# 772100073484
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002105353059
Unscheduled inspection
Start date: 2021-02-09, end date: 2021-02-20, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction based on a contract with a developer or technical customer, violations of legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
availability of a building permit;
compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 002105353144
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-01, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction based on a contract with a developer or technical customer, violations of legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 Urban Planning Code of the Russian Federation.
# 002105353091
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-01, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction based on a contract with a developer or technical customer, violations of legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement;
The subject of this review is:compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
availability of a building permit;
compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 002005257579
Unscheduled inspection
Start date: 2020-12-14, end date: 2021-01-18, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 002005273842
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-24, duration: 8
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Moskovskoi oblasti
Purpose of inspection: this audit is conducted in order to review the appeal dated 11112020 52072J2020THE objectives of this audit are to prevent identify and suppress violations of the requirements of the legislation of the Russian Federation in the field of sanitary and epidemiological welfare of the population The subject of this audit is to take measures to prevent harm to the life and health of citizens
# 002005280684
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notice of FCU Centravtomagistral on the completion of the construction of the reconstruction of the capital construction facility 02122020 050811857 bx 21054753 dated 08122020 in order to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the reconstruction of the capital construction facility. The purpose of this audit is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out the reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and design documentation, requirements for energy conservation and energy efficiency improvement, the conformity of work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Articles 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Articles 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements are met. The efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources.
# 002005223815
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-27, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002005223734
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-27, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002005213088
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-24, duration: 12
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002005205099
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-11-25, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002005147362
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction reconstruction of a capital construction facility the task of this audit is to prevent identify and suppress violations of the legislation on urban development, including technical ones, committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer regulations and design documentation requirements for energy conservation and energy efficiency improvement The subject of this audit is the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation including energy efficiency requirements with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with devices accounting for used energy resourcescompliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002005190415
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-19, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004442768
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-16, duration: 9
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this audit is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of a contract with the developer or the technical customer. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by the parts
# 002004448261
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-31, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002004448234
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-31, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002004459361
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-08-05, duration: 12
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the reconstruction of the capital construction facility the task of this check is to prevent identify and suppress the mistakes made by the developer by the technical customer as well as by the person carrying out the reconstruction on the basis of an agreement with the developer or technical customer violations of legislation on urban planning activities, including technical regulations and design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements the requirements for equipping a capital construction facility with metering devices for energy resources used do not apply either. Compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004442783
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-23, duration: 9
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004440409
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-07, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of a linear facility, the task of this audit is to prevent identify and prevent the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or technical the customer's violations of legislation on urban development, including technical regulations and design documentation, requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design approved in accordance with Parts 15 152 and 153 of art. 48 of the Urban Planning Code of the Russian Federation. documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for construction permits to meet the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 002004440396
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-07, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of a linear facility, the task of this audit is to prevent identify and prevent the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or technical the customer's violations of legislation on urban development, including technical regulations and design documentation, requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design approved in accordance with Parts 15 152 and 153 of art. 48 of the Urban Planning Code of the Russian Federation. documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for construction permits to meet the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 002004440427
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-07-08, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of a linear facility, the task of this audit is to prevent identify and prevent the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or technical the customer's violations of legislation on urban development, including technical regulations and design documentation, requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design approved in accordance with Parts 15 152 and 153 of art. 48 of the Urban Planning Code of the Russian Federation. documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for construction permits to meet the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 002004269660
Unscheduled inspection
Start date: 2020-02-11, end date: 2020-02-21, duration: 9
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004269631
Unscheduled inspection
Start date: 2020-02-11, end date: 2020-02-21, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004232460
Unscheduled inspection
Start date: 2020-02-11, end date: 2020-02-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004232807
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-19, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004218040
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-14, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and other regulatory legal acts during the construction of the reconstruction of the capital construction facility, the purpose of this audit is to prevent identify and suppress the mistakes made by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or the technical customer violations of legislation on urban development, including technical regulations and design documentation of requirements for energy conservation and energy efficiency enhancement. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements They also do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources. Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904144857
Unscheduled inspection
Start date: 2019-12-25, end date: 2020-01-29, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001904076094
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-12, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Centralnomu federalnomu okrugu
Purpose of inspection: This check is carried out in order to monitor compliance with the instructions of the UGAN NOTB of the Central Federal District of Rostransnadzor dated January 25, 2019 VM4177419001 p 14
# 001904109582
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-30, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of the design documentation, requirements for energy conservation and energy efficiency improvement, and other regulatory legal acts during the construction and reconstruction of a capital construction facility. The purpose of this audit is to prevent identify and suppress violations of legislation on urban development, including design, committed by the developer, technical customer, and the person carrying out construction based on a contract with the developer or technical customer. documentation of requirements for energy conservation and energy efficiency enhancement The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Art 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 Article 49 of the Urban Planning Code and or the information model, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the need for a construction permit to comply with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903992561
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of a letter received on the termination of federal state supervision of an unfinished capital construction facility. From the information provided, it is established that construction and installation works are not being carried out at the facility. conservation of the facility has not been completed. The task of this inspection is to prevent, identify and suppress violations of the legislation on urban development committed by the developer, the customer carrying out construction. The subject of this inspection is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including the requirements of energy efficiency with the exception of capital construction facilities, which are not subject to energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 001903857542
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notice of completion of construction. The purpose is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this inspection is to prevent identify and suppress the based on a contract with the developer or a technical customer for violations of legislation on urban planning, including design documentation for energy conservation and energy efficiency improvement requirements, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility availability of a construction permit and compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903883376
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001903806542
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-25, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903016167
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-11, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903039747
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001902983196
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-20, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 501903644908
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Administraciya municipalnogo obrazovaniya gorodskoi okrug Lyubercy Moskovskoi oblasti
Purpose of inspection: compliance with land legislation FZ136 of 25102001 art 72
# 001902901293
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902994603
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the inspection is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the reconstruction of the capital construction facility. The purpose of this inspection is to prevent identify and prevent the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or technical The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements are met. The efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources. Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903002350
Unscheduled inspection
Start date: 2019-08-27, end date: 2019-09-05, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903002389
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-09-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the purpose of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or the technical customer The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of permits. for construction, the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code
# 001902811600
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-12, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902708231
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-17, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902690289
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-06-03, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notification of the FKU Centravtomagistral on the completion of the construction of the reconstruction of the capital construction facility dated 16042019 1 bx dated 18042019 0116478 in order to monitor the compliance of the completed works with the mandatory requirements of the project documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts. The purpose of this inspection is to prevent identify and suppress violations committed by the developer, the technical customer and the person carrying out construction on the basis of a contract with a developer or a technical customer for violations of legislation on urban planning, including design documentation, requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements for with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources are the availability of a construction permit and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation.
# 001902612420
Unscheduled inspection
Start date: 2019-04-29, end date: 2019-05-17, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902619532
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-29, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902659227
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction by the Federal Tax Service "Centravtomagistral". The purpose of this inspection is to establish the facts of the fulfillment of the above-mentioned instruction by the Federal Tax Service "Centravtomagistral". The subject of this inspection is the fulfillment by the Federal Tax Service "Centravtomagistral" of the instruction to eliminate the identified violations
# 001902542322
Unscheduled inspection
Start date: 2019-02-28, end date: 2019-03-14, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and other regulatory legal acts during the reconstruction of the facility, the purpose of this audit is to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of a contract with the developer or the technical customer. urban planning activities, including technical regulations and design documentation requirements for energy conservation and energy efficiency enhancementthe subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 001902442356
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-25, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Centralnomu federalnomu okrugu
Purpose of inspection: Monitoring of compliance with the instructions of the UGAN NOTB of the Central Federal District of Rostransnadzor dated 31072018 VM4177419133
# 001802141876
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-16, duration: —
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of paragraphs 1 and 2 of the previously issued instruction dated 28092018 26105C2018K during the construction of a capital construction facility, "Expenses for measures to improve the level of federal highway construction Artificial electric lighting on the A108 Moskovskoe Bolshoe Koltso highway Dmitrov Sergiev Posad Orekhovozuevo Voskresensk Mikhnevo Balabanovo Ruza Klin Dmitrov section from Brest Highway to Minsk Highway on Balabanovo NP km sections 7+200 14+300 np Ermolino km 14+300 15+200 np Mityaevo km 21+700 22+900 Kaluga Region" located at Kaluga region Borovsky district highway A108 "MBK" section from Brest highway to Minsk highway, the deadline for which expired on 19102018 the objectives of this audit are verification of the elimination by a legal entity of the violations identified in paragraphs 1 2 of the previously issued regulation dated 28092018 26105C2018K The subject of this audit is the fulfillment by the legal entity of paragraphs 1 2 of the previously issued regulation dated 28092018 26105C2018K
# 501801991023
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-15, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo administrativnotehnicheskogo nadzora Moskovskoi oblasti
Purpose of inspection: fulfillment of the requirement to conduct an unscheduled on-site inspection of the Lyubertsy City Prosecutor's Office dated 03102018 824b183
# 001801876848
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration: —
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to monitor compliance of the performed works with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object "the Cost of measures to improve the level of arrangement of highways of Federal importance of the Device faux electroacustica on the road А108 "Moscow big ring" Dmitrov Sergiev Posad, Orekhovozuevo Voskresensk Mikhnevo Balabanovo Ruza Wedge Dmitrov section from Brest to Minsk highway highway sections NP Balabanovo km 7+200 14+300 NP Ermolino km 14+300 15+200 NP Mytyajeve km 21+700 22+900 Kaluga oblast" the objectives of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder customer violations of the legislation on town-planning activities including technical regulations and project documentation of the Subject of this review is to check the construction of the facility in accordance with the requirements of article 51 of the parts 2 and 3 of article 52 article 53 54 the town-planning code of the Russian Federation of electrical safety and emergency fire safety, environmental protection sanitary and epidemiological norms of labor law compliance of the performed works and construction materials used in the construction process of the facility and the results of such work to the requirements of technical regulations and project documentation other regulatory acts including the requirements of energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation
# 001800560729
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-31, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Centralnomu federalnomu okrugu
Purpose of inspection: Monitoring of compliance with the instructions of the UGAN NOTB of the Central Federal District of Rostransnadzor dated 23.012018 VM4177419007
# 001800390625
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration: —
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility specified in the Inspection Program Order on approval of the inspection program dated 27022018 255 the objectives of this audit are to prevent identify and suppress violations committed by the developer the customer as well as the person carrying out construction on the basis of a contract with The subject of this audit is the verification of the construction of the facility in accordance with the requirements of Art 51 of parts 2 and 3 of Art 52 of Art 53 54 of the Urban Planning Code of the Russian Federation of Electrical Safety Civil and Emergency Situations fire safety environmental protection sanitary and epidemiological standards of labor legislation for compliance of the work performed and the applied construction materials during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations, project documentation, and other regulatory legal acts, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a construction permit
# 50170803040184
Unscheduled inspection
Start date: 2017-12-28, end date: 2018-02-01, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Moskovskoi oblasti
Purpose of inspection: consideration of citizens' appeals entrance 603j from 02112017g entrance 604j from 02112017g entrance 605j from 02112017g entrance 606j from 02112017g entrance 607j from 02112017g entrance 608j from 02112017g entrance 609j from 02112017g motivated presentation of the chief expert expert of the Sergiev Posad territorial Department of the Department of Rospotrebnadzor in the Moscow region St. Semenova 19 from 22112017g
# 00170701776898
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities committed by persons involved in construction
# 00170701776788
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities committed by persons involved in construction
# 00170701777122
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-26, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities committed by persons involved in construction
# 00170701792720
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-06-19, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit, compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation