# 002005294564
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of paragraph 1 of the inspection program from 07082020 in case 25011184811102R71
# 001903919467
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-10, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of compliance with previously issued regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 24122018 0526107H1 paragraphs 3 6 7 of the regulation dated 11072019 050644P1 the objectives of this audit are to monitor compliance with mandatory requirements in the field of environmental protection geological exploration rational use and protection of subsoil The subject of this audit is to comply with the requirements of state control supervision bodies
# 001902853994
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901219C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901219C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853982
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901019C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901019C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853976
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902853968
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902853961
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901819C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901819C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853921
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901719C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901319C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853954
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901319C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901319C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853945
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901119C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901119C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902801729
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-07-16, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to verify the facts set out in the reasoned submission of the head of the Department of State Geological Supervision and state Supervision in the field of use and protection of water bodies dated 11062019 agreed by the io head of the Interregional Department of Rosprirodnadzor for the Krasnodar Territory and the Republic of Adygea The objectives of this audit are to monitor compliance with mandatory requirements in the field of geological study rational use and protection of subsurface The subject of this The verification is compliance with mandatory requirements
# 001902613384
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-08, duration: —
Authority: Departament lesnogo hozyaistva po YUzhnomu federalnomu okrugu
Purpose of inspection: Purpose Control over the execution of the instruction previously issued by PJSC NK Rosneft on the elimination of identified violations of forest legislation 06102018 dated 24102018 Tasks Prevention detection and suppression of violations by a legal entity, its head and other officials, its authorized representatives of legislative requirements Subject to Compliance with the instructions of the state supervisory authorities
# 001902457847
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7224 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457844
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902457838
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902457836
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7221 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457834
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902457831
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7223 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457828
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7220 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457825
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0318 dated December 13, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001800539271
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration: —
Authority: SeveroKavkazskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Execution of the previously issued order dated 06102017
# 001800169255
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 5710914 dated November 18, 2016 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this code The Code
# 001800169249
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 5710942 dated November 18, 2016 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this code. The Code
# 001800208807
Unscheduled inspection
Start date: 2018-03-29, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800208804
Unscheduled inspection
Start date: 2018-03-29, end date: 2018-04-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0118 dated March 7, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established parts 2 3 and 3_1 of Article 52 of this Code
# 00180802886223
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2317 dated November 13, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts for the object "tvrK51btvrK48 oil collection pipeline with the installation of early preliminary discharge of URPSV water in the area of KNS8 of the Barsukovsky field" The subject of this check is to note the necessary compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy requirements the efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00180802840271
Unscheduled inspection
Start date: 2018-02-05, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00180802925548
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-03-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2717 dated November 15, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory the requirements of regulatory documents and legislative acts for the facility "Construction of the bush site 6 of the Gubkinskoye field"stage 1" The subject of this audit is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802925605
Unscheduled inspection
Start date: 2018-02-07, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00180802925588
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-03-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2617 dated November 15, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802882229
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-26, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2217 dated November 3, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices. the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170802918815
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802771985
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802772011
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the inspection program dated 18112016 5710942 Development of the Kharampur gas field Development of the Cenomanian deposit of the Turonian deposit section stage 1 The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is the compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with technical requirements regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00170802922244
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-29, duration: 8
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted on the basis of an order from Deputy Prime Minister of the Russian Federation Khloponin AG dated 16052017 AHP93144 letter from the Federal Service for Supervision of Natural Resources Rosprirodnadzor dated 20062017 AC02022212904 The task of this audit is to ensure that the Company complies with the terms of license agreements updated licenses in 2015 in terms of performing work on geological exploration and exploration of subsurface areas following the results of 2016 and to the present time under licenses HMN 03279 NE HMN 03280 NE HMN 03282 NE HMN 03283 NE regarding the fulfillment of hydrocarbon production volumes at the end of 2016 and up to the present time under license SLX 02498 NE The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170802742636
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated September 29, 2017 of the BN for the facility "Arrangement of the cluster site 16 of the Severotarasovsky field" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the applied construction materials in the process of construction reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170802512430
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-10-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility on the basis of the completion notice dated 01092017 1417 for the object "Oil collection pipeline tvrK51btvrK48 with the installation of early preliminary discharge of URPSV water in the area of KNS8 of the Barsukovsky field"the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is to note the necessary ۷ compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170802412733
Unscheduled inspection
Start date: 2017-09-14, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802412463
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-10-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to fulfill the program of inspections 575778 of 09062017 for the object "Construction of the bush site 25 of the Tarasovsky deposit" stage 1" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in the construction of the reconstruction of the capital facility construction, as well as the results of such work, the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170801913485
Unscheduled inspection
Start date: 2017-08-21, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170801913563
Unscheduled inspection
Start date: 2017-08-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701833859
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-08-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 11072017 1217 for the facility "Construction of the bush site 9 of the Gubkinskoye field stage 1" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in in the process of construction reconstruction of the capital construction facility as well as the results of such work, the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170701694740
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility on the basis of the completion notice dated 26052017 1117 for the capital construction facility "Arrangement of the cluster site 17 of the Kharampurskoye deposit Southern deposit" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671723
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 23052017 1017 for the capital construction facility "Arrangement of the cluster site 23 of the Kharampurskoye deposit Southern deposit" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671686
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated 22052017 0917 for the facility "Construction of the cluster site 12 of the Severotarasovsky field" stage 2" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671672
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated 22052017 0817 for the facility "Construction of the Ustharampurskoye field cluster site 101" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701557267
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-05-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 11042017 0217 for the CAP construction facility "Pressure oil pipeline DNC 3P zdv 6 pc ABZ zdv 4 ZapadnoPurpeyskoye field"the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements requirements and or requirements established by municipal legal acts
# 00170701557233
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-05-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 03042017 0117 for the construction cap facility "Arrangement of the cluster site 41 of the Severokharampurskoye field" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 00170701678401
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701604990
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-04-06, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to fulfill by a legal entity, an individual entrepreneur, an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements from 17062016 570903616R for the object "Diesel fuel hydrotreating plant in the area of the Tarasovsky field 1 stage"the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is compliance with the instructions of the state control bodies supervision of municipal control bodies
# 00170701561375
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Pipelines of the Mamontovsky region of construction 20112012 code 9494 Pipelines of the Mamontovsky region of construction 20112012 High-pressure water pipeline t20t6" on the basis of the notice of completion of the construction of the capital construction facility 10010205650 from 14022017 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701561454
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Pipelines of the Mamontovsky region of construction 20112012 code 9494 Pipelines of the Mamontovsky region of construction 20112012 High-pressure water pipeline t6k13t" on the basis of the notice of completion of the construction of the capital construction facility 10010205651 dated 14022017 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701349001
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701423491
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-21, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program 573516 from 15042016 of the capital construction facility KNS3 of the Petelinsky field cipher 314214415 2nd stage of construction KNS3 Linear pipelines consisting of a Low-pressure water pipeline kust VS 10a tvr2 PTVO Low-pressure water pipeline tvr1 PTVO KNS3 High-pressure water pipeline KNS3 tvr2 K54 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 00170701419702
Unscheduled inspection
Start date: 2017-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701430937
Unscheduled inspection
Start date: 2017-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701419809
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 13122016 10316 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction the capital construction project "Arrangement of the bush site 35 of the Gubkinskoye field" located at Yamalonenetsky Autonomous Okrug Purovsky District, the purpose of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701419785
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 14122016 10416 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction the capital construction project "Development of the cluster site 17 of the Kharampurskoye deposit Yuzhnaya Zalezh" located at Yamalonenetsky Autonomous Okrug, Purovsky District, Krasnoselkupsky District, the purpose of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701419724
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 26122016 10816 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction The capital construction facility "Construction of the SIKNS DNC1 DNC19 Yuzhnoharampurskoye field" located at Yamalonenetsky Autonomous Okrug Purovsky district Yuzhnoharampurskoye field, the subject of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00160701219880
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is carried out with the aim of implementation of the state construction supervision in accordance with the notice of completion of construction of capital construction object from 25112016 sadatomi of this review are to check the compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulatory legal acts of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources used in the construction of capital construction object "Construction of pipelines 2015 kharampur under the program for improving the reliability of pipelines" located at Yamalo-Nenets Autonomous Okrug Purovsky district of the Kharampur MESTOROZhDENIYa of this review is to highlight kuznecovskaya mandatory requirements established by municipal legal acts of the Federal law of 26122008 294ФЗ "ON protection of rights of legal entities and individual entrepreneurs when implementing the state control and supervision of the municipal control of the" Federal law of 23122009 384ФЗ "Technical regulations on safety of buildings and structures" town planning code of the Russian Federation government of the Russian Federation from 01022006 54 "On the state construction supervision in the Russian Federation" The regulation on the Northern Ural Federal service for ecological, technological and nuclear supervision approved by order from 28062016 262 Federal service for ecological, technological and nuclear supervision, the Order of the Federal service for ecological, technological and nuclear supervision from 13012015 5 "On approval of the List of normative legal acts and normative documents related to the activities of the Federal service for ecological, technological and nuclear supervision section I "Technological construction, energy supervision" П01012014
# 00160701219811
Unscheduled inspection
Start date: 2016-12-09, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00160701261367
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The legal basis of the audit, the Federal law of 26122008 294ФЗ "ON protection of rights of legal entities and individual entrepreneurs when implementing the state control and supervision of the municipal control of the" Federal law of 23122009 384ФЗ "Technical regulations on safety of buildings and structures" town planning code of the Russian Federation government of the Russian Federation from 01022006 54 "On the state construction supervision in the Russian Federation" provision on the Northern Ural Federal service for ecological, technological and nuclear supervision approved by order from 28062016 262 Federal service for ecological, technological and nuclear supervision, the Order of the Federal service for ecological, technological and nuclear supervision from 13012015 5 "On approval of the List of normative legal acts and normative documents related to the activities of the Federal service for ecological, technological and nuclear supervision section I "Technological construction, energy supervision" П01012014настоящая inspection is conducted with the aim of implementation of the state construction supervision in accordance with the notice of completion of construction, reconstruction of capital construction object from 12122016 10216Задачами of this review are to check the compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulatory legal acts of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources used in the construction of capital construction object "Cluster Playground 75 Komsomolskoye field" located at Yamalo-Nenets Autonomous Okrug Purovsky district Komsomol MESTOROZhDENIYa of this review is to highlight kuznecovskaya mandatory requirements of the municipal legal acts
# 00160701261355
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Legal grounds for conducting an audit Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the exercise of State Control Supervision and Municipal Control" Federal Law of 23122009 384 FZ "Technical Regulations on the Safety of Buildings and Structures" Urban Planning Code of the Russian Federation Decree of the Government of the Russian Federation of 01022006 54 "On State Construction Supervision in the Russian Federation" The Regulation on the North Ural Department of the Federal Service for Environmental Technological and Nuclear Supervision was approved by Order No. 28062016 262 of the Federal Service for Environmental Technological and Nuclear Supervision Order of the Federal Service for Environmental Technological and Nuclear Supervision dated 13012015 5 "On approval of the List of Regulatory Legal Acts and regulatory documents related to the field of activity of the Federal Service for Environmental Technological and Nuclear Supervision Section I "Technological construction energy supervision" P01012014 This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 12122016 10116 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used in the construction of the capital construction facility "Buildings and structures at site 74 of the Komsomolskoye field" located at Yamalonenetsky Autonomous Okrug Purovsky district Komsomolskoye field
# 00160601653853
Unscheduled inspection
Start date: 2016-06-01, end date: 2016-06-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations, norms and rules of other regulatory legal acts of the project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Installation of diesel fuel hydrotreating in the area of the Tarasovsky field 1 stage"
# 00160600822392
Unscheduled inspection
Start date: 2016-06-01, end date: 2016-06-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the verification program. The tasks of this inspection are to verify the compliance of the work performed with the requirements of technical regulations, norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility "Diesel fuel hydrotreating plant in in the area of the Central Control Station of the Tarasovsky field, stage 1"
# 07150601448118
Unscheduled inspection
Start date: 2015-12-17, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po KabardinoBalkarskoi Respublike
Purpose of inspection: verification of the consumer's statement
# 00150601315821
Unscheduled inspection
Start date: 2015-12-02, end date: 2015-12-29, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: supervision of the implementation of regulations
# 00150601309268
Unscheduled inspection
Start date: 2015-11-05, end date: 2015-12-02, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po HantyMansiiskomu avtonomnomu okrugu YUgre
Purpose of inspection: In order to verify the fulfillment by a legal entity of JSC NK Rosneft of the requirements of the previously issued order on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements 306ZK40 dated 09092014, the task of this audit is to monitor the execution of the previously issued order on the elimination of identified violations of legislation in the field of environmental protection and violations of environmental requirements 306ZK40 dated 09092014
# 00150601309267
Unscheduled inspection
Start date: 2015-11-05, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po HantyMansiiskomu avtonomnomu okrugu YUgre
Purpose of inspection:
# 07150601208959
Unscheduled inspection
Start date: 2015-07-17, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po KabardinoBalkarskoi Respublike
Purpose of inspection: Consumer protection
# 862101510171
Unscheduled inspection
Start date: 2021-12-29, end date: —, duration: 2
Authority: Administraciya Surgutskogo raiona Hanty-Mansiiskogo avtonomnogo okruga - YUgry
Purpose of inspection: establishment of the execution of regulation No. 13 of 05/28/2021 on the elimination of violations of the land legislation of the Russian Federation under inspection act No. 14 of 05/28/2021, expressed in the unauthorized occupation of land plots with an area of 0.0524 hectares for the expansion of cluster site No. 62 on the undefined lands of the cadastral quarter 86:03:0053401, with an area of 0.4422 for the expansion of cluster site 153 on the undefined lands of the cadastral quarter 86:03:0053501, unauthorized occupation of a land plot with an area of 0.3618 hectares for the expansion of the cluster site No. 78 on the undefined lands of the cadastral quarter 86:03:0053401, unauthorized occupation of a land plot with an area of 0.0309 hectares for part of a helicopter pad on the undefined cadastral quarter 86:03:0053301, unauthorized occupation of a land plot with an area of 0.0287 hectares for the expansion of the cluster site No. 74 on the undefined lands of the cadastral quarter 86:03:0053401, unauthorized occupation of a land plot with an area of 0.1393 hectares for the expansion of the bush site No. 150 on the undefined lands of the cadastral quarter 86:03:0053501
# 892100290372
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 4
Authority: Departament prirodno-resursnogo regulirovaniya‚ lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the instruction on the elimination of detected violations dated 30.04.2021 No. 3-T (hereinafter referred to as the Instruction), previously issued by PJSC NK Rosneft.
# 722100245684
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to:
- control over the execution by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements dated November 12, 2019 No. 5709/114-19/S on the basis of a notice on the elimination of violations dated May 12, 2021 No. 08/21;
The objectives of this audit are: verification of the elimination by a legal entity of the identified violation specified in paragraphs dated November 12, 2019.
No. 5709/114-19/S.
-the subject of this check is (to mark the necessary):
compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 722100245667
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 722100245657
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to:
- control over the execution by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements dated November 12, 2019 No. 5709/118-19/S on the basis of a notice on the elimination of violations dated May 12, 2021 No. 02/21;
The objectives of this audit are: verification of the elimination by a legal entity of the identified violation specified in paragraphs dated November 12, 2019.
No. 5709/118-19/S.
-the subject of this check is (to mark the necessary):
compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 722100245616
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 722100245595
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to:
- control over the execution by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements dated November 12, 2019 No. 5709/113-19/S on the basis of a notice on the elimination of violations dated May 12, 2021 No. 07/21;
The objectives of this audit are: verification of the elimination by a legal entity of the identified violation specified in paragraphs dated November 12, 2019.
No. 5709/113-19/S.
-the subject of this check is (to mark the necessary):
compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 722100245584
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 722100245566
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722100245557
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 232100215804
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is carried out in order to: verify the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 07/11/2019 No. 05-06-44-P-1.
The objectives of this audit are to monitor compliance with mandatory requirements in the field of: environmental protection: geological exploration, rational use and protection of subsurface resources.
The subject of this review is
compliance with the instructions of the state control (supervision) bodies
# 892100166715
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: 10
Authority: Departament prirodno-resursnogo regulirovaniya‚ lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: The inspection is carried out in order to establish compliance of the legal entity's activities with the requirements of the current legislation of the Russian Federation in the field of environmental protection, based on a reasoned presentation by an official of the state control (supervision) body - the chief specialist of the Tarkosalinsky forestry department of the Forest Relations Department dated 04/16/2021 on the spill of oily liquid in blocks No. 2923, 2924 of the Purpeysky district forestry of Tarkosalinsky forestry.
The purpose of this audit is to ensure compliance by a legal entity, including its officials, with the established procedure for using the forest fund, as well as other requirements established by the forest legislation of the Russian Federation.
The subject of this audit is compliance by a legal entity in the course of carrying out its activities with the mandatory requirements of the legislation of the Russian Federation.
# 272100157150
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-31, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program dated 02/01/2021.
The objectives of this audit are: prevention, detection, suppression of violations of current legislation on urban development and project documentation.
The subject of the audit is to verify the compliance of the work performed and the construction materials used in the process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices for energy resources used.
# 232100202699
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: 20
Authority: Severo-Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of paragraph 1 of the inspection program dated 01/13/2021 in case No. 25-01118-48.1(1.10.2)-R-71.
# 892100060177
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-23, duration: 7
Authority: Departament prirodno-resursnogo regulirovaniya‚ lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: The inspection is carried out in order to monitor the implementation of paragraph No. 1 of the instruction on the elimination of detected violations dated 03/06/2020 No. 03/N previously issued by PJSC NK Rosneft (hereinafter referred to as the Instruction).
The objective of this audit is to verify the elimination of previously identified violations of the forest legislation of the Russian Federation.
The subject of this audit is to verify the fulfillment of the Prescription.
# 112005230303
Unscheduled inspection
Start date: 2020-11-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005294564
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of paragraph 1 of the inspection program from 07082020 in case 25011184811102R71
# 722004324094
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-26, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: The purpose is to monitor the implementation of paragraph 1 of the instruction previously issued by PJSC NK Rosneft on the elimination of identified violations from 10092019 5K, hereinafter referred to as the Instruction, the deadline for which expires on June 15, 2020, the task is to verify the elimination of previously identified violations of the forest legislation of the Russian Federation.
# 722004340686
Unscheduled inspection
Start date: 2020-03-06, end date: —, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:
# 722004283403
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-06, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: Control over the implementation of paragraph 1 of the instruction previously issued by Rosneft NC PJSC on the elimination of identified violations dated 25102019 11H hereinafter referred to as the Instruction
# 672004223324
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Smolenskoi oblasti
Purpose of inspection:
# 722004387706
Unscheduled inspection
Start date: 2020-03-30, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:
# 292004143409
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 292004143485
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001904152278
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-13, duration: —
Authority: SeveroKavkazskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of the execution of a previously issued prescription from 02082018 18962B2
# 001904152265
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-13, duration: —
Authority: SeveroKavkazskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Verification of the execution of a previously issued prescription
# 721903965945
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-11, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of the elimination of previously identified violations
# 001903919467
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-10, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of compliance with previously issued regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 24122018 0526107H1 paragraphs 3 6 7 of the regulation dated 11072019 050644P1 the objectives of this audit are to monitor compliance with mandatory requirements in the field of environmental protection geological exploration rational use and protection of subsoil The subject of this audit is to comply with the requirements of state control supervision bodies
# 721903903224
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-10-25, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: control over the implementation of paragraph 1 of the instruction on the elimination of identified violations of 15052019 issued earlier by PJSC NK Rosneft 3H verification of the elimination of previously identified violations of the forest legislation of the Russian Federation
# 001903018628
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7242 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 001903018697
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7244 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 001903018593
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7245 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 001903018777
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7240 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 001903018676
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2440 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 001903018738
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7246 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 001903018559
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7244 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 001903018491
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7243 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 001903018650
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0321 dated August 12, 2019 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code
# 861903402876
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of regulations dated 09082019 034452019 034462019 034472019 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements ensuring compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut region, compliance with the regulations of state control and supervision bodies Five working days
# 721903353923
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-11, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of the elimination of previously identified violations
# 651902933246
Unscheduled inspection
Start date: 2019-07-16, end date: 2019-07-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: the execution of the inspection program checking the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in a self-regulatory organization as well as the availability of specialists included in the National Register of specialists in the field of construction
# 861902877916
Unscheduled inspection
Start date: 2019-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721902723178
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:
# 001902853994
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901219C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901219C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853989
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901419C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901419C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853982
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901019C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901019C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853976
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901619C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901619C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853968
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901519C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901519C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853961
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901819C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901819C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853921
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901719C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901319C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853954
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901319C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of the identified violations specified in paragraphs of regulation 570901319C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902853945
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements 570901119C dated March 27, 2019. The tasks of this audit are to verify the elimination by a legal entity of identified violations specified in paragraphs of the instruction 570901119C dated March 27, 2019. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies municipal control bodies
# 001902801729
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-07-16, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to verify the facts set out in the reasoned submission of the head of the Department of State Geological Supervision and state Supervision in the field of use and protection of water bodies dated 11062019 agreed by the io head of the Interregional Department of Rosprirodnadzor for the Krasnodar Territory and the Republic of Adygea The objectives of this audit are to monitor compliance with mandatory requirements in the field of geological study rational use and protection of subsurface The subject of this The verification is compliance with mandatory requirements
# 861902784242
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 861902784164
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-06-27, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: the purpose of monitoring the implementation of the regulation dated 26102018 0927820181 on the elimination of violations of forest legislation within the period of 13052019, the objectives of this audit are to ensure compliance with the requirements of forest legislationthe object of this audit is to note the necessary fulfillment of the instructions of state control bodies supervision of municipal control bodies
# 291902725583
Unscheduled inspection
Start date: 2019-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 291902725869
Unscheduled inspection
Start date: 2019-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 291902725726
Unscheduled inspection
Start date: 2019-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 291902725514
Unscheduled inspection
Start date: 2019-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721902709811
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-15, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: The purpose is to monitor the implementation of paragraph 32 of the instruction previously issued by PJSC NK Rosneft on the elimination of identified violations dated 28082018 4H 3T 1H 1K hereinafter the Instruction, the deadline for which expired on March 05, 2019 The task is to verify the elimination of previously identified violations of the forest legislation of the Russian Federation The subject is to verify the fulfillment of the instruction
# 291902717924
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-23, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Arrangement of the Naulskoye oil field Bushes of wells 5 5a Objects of the 2nd stage of construction" as well as the results of such work with the requirements of technical regulations, other normative acts and project documentation Verification of work in accordance with paragraph 1 of the Program of verification of compliance by a legal entity with the requirements of legislation on urban planning activities of environmental protection legislation of sanitary norms and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of the Naulskoye oil field Bushes of wells 5 5a Objects of the 2nd stage of construction" with metering devices for used energy resourcesobservance of mandatory requirements of legislation on urban planning activities Compliance of the applied building materials during the construction of the capital construction facility as well as the results completed works to the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Arrangement of the Naulskoye oil field Bushes of wells 5 5a Objects of the 2nd stage of construction" with metering devices for used energy resourcescompliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 291902717736
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-23, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 1st stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 1 of the Program of verification of compliance by a legal entity with legal requirements on urban planning activities of environmental legislation, sanitary norms and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 1st stage of construction" metering devices for used energy resourcesobservance of mandatory requirements of legislation on urban development activities Compliance of the applied building materials in the process the construction of the capital construction facility as well as the results of the work performed to the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and equipment requirements of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 1st stage of construction" metering devices for energy resources used Compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 291902717871
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 381902651563
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-15, duration: —
Authority: Ministerstvo lesnogo kompleksa Irkutskoi oblasti
Purpose of inspection: Monitoring compliance with mandatory requirements of forest legislation
# 651902923822
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-05-08, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: the execution of the inspection program checking the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in a self-regulatory organization as well as the availability of specialists included in the National Register of specialists in the field of construction
# 001902613384
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-08, duration: —
Authority: Departament lesnogo hozyaistva po YUzhnomu federalnomu okrugu
Purpose of inspection: Purpose Control over the execution of the instruction previously issued by PJSC NK Rosneft on the elimination of identified violations of forest legislation 06102018 dated 24102018 Tasks Prevention detection and suppression of violations by a legal entity, its head and other officials, its authorized representatives of legislative requirements Subject to Compliance with the instructions of the state supervisory authorities
# 291902529459
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 291902444782
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771902613161
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-24, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: assessment of the licensee's compliance with licensing requirements and compliance of information about the licensee contained in the unified state register of Legal Entities and other federal information resources
# 701902589791
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902457847
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7224 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457844
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7219 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established parts 2 3 and 3_1 of Article 52 of this Code
# 001902457841
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2418 dated November 3, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457838
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7218 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457836
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7221 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457834
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7222 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457831
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7223 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457828
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 7220 dated December 12, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001902457825
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0318 dated December 13, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 111802042556
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 3rd stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and design documentation Verification of the completed construction of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 3rd stage of construction" on the basis of the notice of completion of the capital construction facility dated 08102018 05oc1018 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules of fire safety, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" UPN "Labaganskaya" Objects of the 3rd stage of construction" with metering devices for the energy resources used, Compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of the work performed, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 3rd stage of construction" metering devices for energy resources used To meet the requirements of Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 231802189298
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 861801999793
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-10-26, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: the purpose of monitoring the implementation of the regulation dated 10082018 092782018 on the elimination of violations of environmental legislation the objectives of this audit are to ensure compliance with the requirements in the field of forest legislation in the territory of Nefteyugansk district
# 861801999892
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-10-26, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: this audit is carried out in order to monitor the implementation of the regulation dated 10082018 092792018 on the elimination of violations of environmental legislation until 14092018. The objectives of this audit are to ensure compliance with the requirements in the field of forest legislation in the territory of the Nefteyugansk district
# 861801999779
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-26, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: control over the implementation of the regulation dated 11102017 09116012017
# 861801460459
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-18, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: the audit is carried out in order to monitor the implementation of the mandatory regulation dated August 03, 2018 034792018 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by September 03, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the Surgut district
# 651801502721
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-24, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Checking the availability of a construction permit compliance with the requirements of design documentation and other regulatory documents in the production of works, the use of building materials and structures, the design of executive documentation, checking the membership of the person carrying out construction in a self-regulating organization, the availability of specialists included in the National Register of Specialists in the field of construction
# 861801229003
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 861800710440
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 271800619226
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the program of inspections of the Facility dated 08112017 The objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development activities including technical regulations and design documentation The subject of the inspection is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the Facility as well as the results such works meet the requirements of the technical regulations of the project documentation
# 861800603433
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: control over the implementation of the regulation dated 29062018 092122018 on the elimination of violations of forest legislation on 01082018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800603482
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: control over the implementation of the regulation dated 29062018 092162018 on the elimination of violations of forest legislation within the period of 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800603381
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: control over the implementation of the regulation dated 29062017 092182018 on the elimination of violations of forest legislation on 01082018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800595185
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-03, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: the inspection is carried out in order to fully and comprehensively review the fact of violation of the requirements of forest legislation and confirm the fact of violation of forest legislation, namely the absence of fire-fighting mineralized strips in the forest area contained in the message of the Yugansky territorial Department of Forestry, the objectives of this inspection are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district
# 861800559079
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation ensuring compliance with the requirements of forest legislation in the territory of the Khanty-Mansiysk district compliance with mandatory requirements and or requirements established by municipal legal acts
# 651800527825
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-18, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Verification of the availability of a construction permit compliance with the requirements of design documentation technical regulations and other regulatory documents in the production of works, the use of building materials and structures, registration of executive documentation verification of the membership of the person carrying out construction in a self-regulatory organization the availability of specialists included in the National Register of Specialists in the field of construction
# 861800513433
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-06, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: the purpose of monitoring the implementation of the mandatory regulation dated February 15, 2018 03082018 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by May 21, 2018, the objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the instructions of state control bodies supervision of municipal authorities control
# 001800539271
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration: —
Authority: SeveroKavkazskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Execution of the previously issued order dated 06102017
# 651800572008
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection:
# 651800571991
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-08-01, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program compliance with mandatory requirements and or requirements established by municipal legal acts verification of compliance of completed works, including construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices used energy resources verification of the membership of the person carrying out construction in a self-regulating organization as well as the availability of specialists included in the National Register of Specialists in the field verification of the availability of a construction permit
# 861800571977
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 861800451873
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-15, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: control over the implementation of the regulation of 25072017 0922022017 on the elimination of violations of legislation in the field of fire safety in forests on 01062018
# 861800451795
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-15, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation of 25072017 0921922017 on the elimination of violations of legislation in the field of fire safety in forests on 01062018
# 861800498471
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: this audit is conducted in order to monitor the implementation of mandatory regulations dated June 08, 2018 033762018 033782018 033792018 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements the objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district the subject of this audit is the implementation of the regulations of state control supervision bodies of municipal control bodies
# 861800424024
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: this audit is conducted in order to monitor the implementation of mandatory regulations dated December 11, 2017 033872017 033882017 033892017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by May 25, 2018. the objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the Surgut district. the subject of this audit is the implementation of regulations bodies of state control supervision of municipal control bodies
# 861800411806
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: this audit is conducted in order to monitor the implementation of mandatory regulations dated November 2, 2017 033392017 033402017 033412017 033422017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by May 18, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the Surgut district. the subject of this audit is the implementation of regulations of state control bodies supervision of municipal control bodies
# 861800411801
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: this audit is conducted in order to monitor the implementation of mandatory regulations dated November 2, 2017 033432017 033442017 033452017 033462017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by May 18, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the Surgut district. the subject of this audit is the implementation of regulations of state control bodies supervision of municipal control bodies
# 861800410643
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The objectives of monitoring the implementation of the regulations are to ensure compliance with the requirements of forest legislation in the territory of the Khanty-Mansiysk Autonomous Okrug, the subject is compliance with mandatory requirements and or requirements established by municipal legal acts
# 861800489148
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-27, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation ensuring compliance with the requirements of forest legislation in the territory of the Khanty-Mansiysk district compliance with mandatory requirements and or requirements established by municipal legal acts
# 861800485172
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 11102017 0911622017 on the elimination of violations of forest legislation ensuring compliance with the requirements of forest legislation in the territory of Nefteyugansk district
# 861800485101
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 11102017 0911612017 on the elimination of violations of forest legislation ensuring compliance with the requirements of forest legislation in the territory of Nefteyugansk district
# 861800485054
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 11102017 0911602017 on the elimination of violations of forest legislation ensuring compliance with the requirements of forest legislation in the territory of Nefteyugansk district
# 861800484835
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 11102017 09115812017 on the elimination of violations of forest legislation ensuring compliance with the requirements of forest legislation in the territory of Nefteyugansk district
# 861800484746
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The purpose is to monitor the implementation of the regulation dated 11102017 0911582017 on the elimination of violations of forest legislation in the period 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800484925
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 11102017 0911592017 on the elimination of violations of forest legislation ensuring compliance with the requirements of forest legislation in the territory of Nefteyugansk district
# 861800484279
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The purpose is to monitor the implementation of the regulation dated 26092017 0910932017 on the elimination of violations of forest legislation within the period of 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800484126
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The purpose is to monitor the implementation of the regulation dated 26092017 0910952017 on the elimination of violations of forest legislation within the period of 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800484388
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The purpose is to monitor the implementation of the regulation dated 26092017 0910962017 on the elimination of violations of forest legislation within the period of 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800484342
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The purpose is to monitor the implementation of the regulation dated 26092017 0910972017 on the elimination of violations of forest legislation within the period of 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800484202
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: The purpose is to monitor the implementation of the regulation dated 26092017 0910942017 on the elimination of violations of forest legislation in the period 250-52018 The task is to ensure compliance with the requirements of forest legislation in the territory of the Nefteyugansk district The subject is to comply with the instructions of state control and supervision bodies
# 861800366964
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: This audit is conducted in order to monitor the implementation of the mandatory regulation dated October 6, 2017 032652017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by April 26, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the regulations of state bodies control supervision of municipal control bodies
# 861800366952
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: This audit is conducted in order to monitor the implementation of the mandatory regulation dated October 6, 2017 032672017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by April 26, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the regulations of state bodies control supervision of municipal control bodies
# 861800366946
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: This audit is conducted in order to monitor the implementation of the mandatory regulation dated October 6, 2017 032702017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by April 26, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the regulations of state bodies control supervision of municipal control bodies
# 861800366930
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: This audit is conducted in order to monitor the implementation of the mandatory regulation dated October 6, 2017 032692017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by April 26, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the regulations of state bodies control supervision of municipal control bodies
# 861800366918
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: This audit is conducted in order to monitor the implementation of the mandatory regulation dated October 6, 2017 032682017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by April 26, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the regulations of state bodies control supervision of municipal control bodies
# 861800366881
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: This audit is conducted in order to monitor the implementation of the mandatory regulation dated October 6, 2017 032662017 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by April 26, 2018. The objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection in the territory of the Surgut district The subject of this audit is the implementation of the regulations of state bodies control supervision of municipal control bodies
# 861800404251
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-05-31, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: this audit is conducted in order to monitor the implementation of the mandatory regulation dated March 28, 2018 03292018 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements by May 10, 2018 and control the implementation of the mandatory regulation dated March 28, 2018 03302018 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements in until May 10, 2018, the objectives of this audit are to ensure compliance with the requirements of legislation in the field of environmental protection on the territory of the Surgut district. The subject of this audit is to comply with the instructions of state control and supervision bodies
# 651800388071
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-30, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program compliance with mandatory requirements and or requirements established by municipal legal acts verification of compliance of completed works, including construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices used energy resources verification of the membership of the person carrying out construction in a self-regulating organization as well as the availability of specialists included in the National Register of Specialists in the field verification of the availability of a construction permit
# 651800388061
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-30, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program compliance with mandatory requirements and or requirements established by municipal legal acts verification of compliance of completed works, including construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices used energy resources verification of the membership of the person carrying out construction in a self-regulating organization as well as the availability of specialists included in the National Register of Specialists in the field verification of the availability of a construction permit
# 861800265731
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the implementation of the instruction from 11052017 094622017 on the elimination of violations of forest legislation in the period up to 30032018 Ensuring compliance with the requirements of forest legislation in the territory of the Nefteyugansk district Compliance with the instructions of state control and supervision bodies
# 111800299540
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Oil delivery point Head structures Reconstruction of the fire extinguishing system" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 1 of the Inspection Program Verification of compliance by a legal entity with the requirements of legislation on urban development environmental legislation sanitary standards and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Oil delivery point Head structures Reconstruction of the fire extinguishing system" with metering devices for energy resources used Compliance with mandatory requirements of legislation on urban planning activities compliance of the construction materials used during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements for the capital construction facility "Oil delivery point Head structures Reconstruction of the fire extinguishing system" with metering devices for used energy resources compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 231802032258
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v Krasnodarskom krae
Purpose of inspection: protection of the rights and interests of employees in connection with the consideration of the appeal of 27032018 237190218OB supervision of compliance with labor legislation and other regulatory legal acts containing norms of labor law compliance with mandatory requirements or requirements established by municipal legal acts
# 001800267718
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-05-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0318 dated March 23, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 231800222918
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001800169255
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 5710914 dated November 18, 2016 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this code The Code
# 001800169249
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 5710942 dated November 18, 2016 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this code. The Code
# 001800208807
Unscheduled inspection
Start date: 2018-03-29, end date: 2018-04-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0218 dated March 7, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code
# 001800208804
Unscheduled inspection
Start date: 2018-03-29, end date: 2018-04-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 0118 dated March 7, 2018 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established parts 2 3 and 3_1 of Article 52 of this Code
# 831800068147
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 831800068213
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00180802886223
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2317 dated November 13, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts for the object "tvrK51btvrK48 oil collection pipeline with the installation of early preliminary discharge of URPSV water in the area of KNS8 of the Barsukovsky field" The subject of this check is to note the necessary compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy requirements the efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00180802840271
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 1817 dated October 30, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts on the object "Arrangement of the cluster site 7 of the Kharampurskoye field Severnaya Zalezh" Stage 1" The subject of this audit is to note the necessary compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802840239
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the notice of completion of 2017 dated October 30, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts on the project "Crude oil and water metering unit at the Tarasovsky field DNS2" The subject of this audit is to note the necessary compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802840203
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the notice of completion 1917 dated October 30, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts on the project "Arrangement of the cluster site 63 of the Kharampurskoye field Severnaya Zalezh Stage 1" The subject of this audit is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802925548
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-03-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2717 dated November 15, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory the requirements of regulatory documents and legislative acts for the facility "Construction of the bush site 6 of the Gubkinskoye field"stage 1" The subject of this audit is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802925605
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-03-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2517 dated November 15, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility. construction of metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00180802925588
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-03-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2617 dated November 15, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00180802882229
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-26, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 2217 dated November 3, 2017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is to note the necessary compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices. the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 83170802933318
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 11170802932971
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170802918815
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Reception point of the SLUM TSPiTG1 Ustbalyk mr SH0004D66109" on the basis of the notice of completion of the construction of the capital construction facility 1001041487 dated 27102017 in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility prevention detection and suppression of violations mandatory requirements of regulatory documents and legislative acts compliance of work and construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 Articles 52 of the Urban Planning Code of the Russian Federation
# 00170802903789
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-25, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: the inspection is carried out in order to verify the fulfillment of the previously issued instruction on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements from 07032017 059908H1THE tasks of this inspection are supervision of compliance with mandatory requirements in the field of environmental protection geological exploration rational use and protection of subsoil The subject of this inspection is the fulfillment of the instructions of state control supervision bodies
# 86170802810192
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802810191
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802810171
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170802810180
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802810176
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-10, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 23170802978697
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-12-01, duration: —
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: this inspection is carried out in order to fulfill the inspection program notification of Rntuapsinsky Oil Refinery LLC on the completion of the construction of a capital construction facility dated October 24, 2017 16878 the tasks of this inspection are to prevent, identify and suppress violations of the legislation on urban development activities committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer contractor, including among the technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 23170802978760
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-12-01, duration: —
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: this inspection is carried out in order to fulfill the inspection program notification of Rntuapsinsky Oil Refinery LLC on the completion of the construction of the capital construction facility of October 24, 2017 16879the tasks of this inspection are to prevent, identify and suppress violations of the legislation on urban development activities committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer contractor, including among the technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170802925709
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "The support base of the fishery in the area of the exploration well 180P of the Priobskoye field cipher 293914416 1st stage of construction Construction of an additional site for contractors with a size of 120x60m A site for housing a residential town of contractors with an access highway 6 kV PS 356 kV 2042 OBP 2KTPNU630604 kV" on the basis of a notice of completion of the capital construction facility 1001041328 from 21092017 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other normative legal acts of project documentation with the requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility, prevention, identification and suppression of violations of mandatory requirements of regulatory documents and legislative acts, compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 86170802900535
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-23, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 00170802771985
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the inspection program dated 18112016 5710914 Development of the Kharampur gas field Development of the Cenomanian deposit of the Turonian deposit site stage 2 The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is the compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with technical requirements regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00170802772011
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the inspection program dated 18112016 5710942 Development of the Kharampur gas field Development of the Cenomanian deposit of the Turonian deposit section stage 1 The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is the compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with technical requirements regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00170802922244
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-29, duration: 8
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted on the basis of an order from Deputy Prime Minister of the Russian Federation Khloponin AG dated 16052017 AHP93144 letter from the Federal Service for Supervision of Natural Resources Rosprirodnadzor dated 20062017 AC02022212904 The task of this audit is to ensure that the Company complies with the terms of license agreements updated licenses in 2015 in terms of performing work on geological exploration and exploration of subsurface areas following the results of 2016 and to the present time under licenses HMN 03279 NE HMN 03280 NE HMN 03282 NE HMN 03283 NE regarding the fulfillment of hydrocarbon production volumes at the end of 2016 and up to the present time under license SLX 02498 NE The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 86170802714776
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802714787
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802714786
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802692854
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802691675
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802691672
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802692771
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170802670361
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802670356
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802693030
Unscheduled inspection
Start date: 2017-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170802693027
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-06, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802693016
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-06, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802692817
Unscheduled inspection
Start date: 2017-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170802691679
Unscheduled inspection
Start date: 2017-10-05, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170802686512
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-06, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802796231
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-26, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802774118
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-26, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 65170802790632
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-26, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: inspections of an object completed by construction
# 83170802448699
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-06, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the implementation of the previously issued instruction of the Pechora Department of Rostechnadzor on the elimination of violations during the construction of the reconstruction of the capital construction facility from 16062017 250313N158153 PP Verification of the elimination by a legal entity of the violations identified in the instruction of the Pechora Department of Rostechnadzor on the elimination of violations during the construction of the reconstruction of the capital construction facility from 16062017 250313N158153 PP Fulfillment by a legal entity of the instruction of the Pechora Department of Rostechnadzor on the elimination of violations during the construction of the reconstruction of the capital construction facility from 16062017 250313H158153 P
# 00170802742636
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated September 29, 2017 of the BN for the facility "Arrangement of the cluster site 16 of the Severotarasovsky field" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the applied construction materials in the process of construction reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 86170802731426
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-17, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 83170802797782
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 65170802767057
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Inspection of the capital construction facility, verification of executive documentation, verification of the quality of work
# 65170802767019
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Inspection of the capital construction facility, verification of executive documentation, verification of the quality of work
# 65170802767174
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection:
# 86170802536917
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-20, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802536913
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-20, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802533086
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170802533083
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-20, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 00170802512430
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-10-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility on the basis of the completion notice dated 01092017 1417 for the object "Oil collection pipeline tvrK51btvrK48 with the installation of early preliminary discharge of URPSV water in the area of KNS8 of the Barsukovsky field"the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is to note the necessary ۷ compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 23170802631000
Unscheduled inspection
Start date: 2017-09-14, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Krasnodarskomu krayu
Purpose of inspection:
# 00170802412733
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-10-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program 5711819 dated 13122016 for the facility "Construction of the Tarasovsky field cluster site 5". The objectives of this inspection are to prevent, identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this inspection is to note the necessary compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and also, the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170802412463
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-10-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to fulfill the program of inspections 575778 of 09062017 for the object "Construction of the bush site 25 of the Tarasovsky deposit" stage 1" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in the construction of the reconstruction of the capital facility construction, as well as the results of such work, the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 86170802734641
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802734651
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802624632
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802604503
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802604502
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802604493
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802604492
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170802570165
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802570164
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170802570161
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802570160
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170802570159
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802567498
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802567479
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802567473
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802567467
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170802567460
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701851668
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701851666
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801951171
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-01, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801951140
Unscheduled inspection
Start date: 2017-08-31, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170801951136
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-01, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801951135
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-01, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801951117
Unscheduled inspection
Start date: 2017-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701864668
Unscheduled inspection
Start date: 2017-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701864764
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701864646
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701864619
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701864729
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701864640
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801930296
Unscheduled inspection
Start date: 2017-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 65170701825648
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Sahalinskoi oblasti
Purpose of inspection: supervision of compliance by PJSC Rosneft Oil Company with mandatory requirements for geological exploration rational use and protection of subsurface resources in the Ustevai and Mongi subsurface areas
# 65170802262604
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Inspection of the capital construction facility, verification of executive documentation, verification of the quality of work
# 65170802262593
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170801913536
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-08-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program 573493 of 15042016 for the facility "Construction of the bush site 36 of the Gubkinskoye field" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170801913485
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-08-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program 5711817 dated 13122016 for the object "Construction of the bush site 9 of the Gubkinskoye field stage 2" the objectives of this inspection are to prevent, identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 00170801913563
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-08-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to fulfill the program of inspections 5711818 dated 13122016 for the object "Arrangement of the cluster site 57 of the Kharampurskoye deposit Southern deposit Expansion" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in the construction process of the reconstruction of the capital facility construction, as well as the results of such work, the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 86170701843263
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701843261
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701843257
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784612
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784610
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701784599
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784592
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784585
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784584
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784583
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784580
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784578
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784574
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701784570
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170701790926
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-11, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701790925
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170801928023
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801928022
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801928021
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801928020
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170801928018
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701769399
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749629
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170701749627
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749626
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170701749625
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749644
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170701749624
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749633
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749623
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749632
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749614
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701749631
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749613
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749630
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-13, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701749612
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701833859
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-08-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 11072017 1217 for the facility "Construction of the bush site 9 of the Gubkinskoye field stage 1" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in in the process of construction reconstruction of the capital construction facility as well as the results of such work, the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code
# 86170701744250
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701741568
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701741567
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701741566
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701741569
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-19, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 83170701698043
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-16, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 1st stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 2 of the Inspection Program Verification of compliance by a legal entity with the requirements legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 1st stage of construction" metering devices for used energy resourcesconformity of the applied building materials during the construction of the capital construction facility and also, the results of the work performed meet the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Facilities of the 1st stage of construction"Compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 83170701698120
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-16, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied construction materials at the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 2nd stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 2 of the Inspection Program Verification of compliance by a legal entity with the requirements legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 2nd stage of construction" with metering devices for used energy resourcesconformity of the applied building materials during the construction of the capital construction facility and also, the results of the work performed meet the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Facilities of the 2nd stage of construction"Compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 83170701698175
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-16, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 3rd stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 2 of the Inspection Program Verification of compliance by a legal entity with the requirements legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Objects of the 3rd stage of construction" metering devices for used energy resourcesconformity of the applied building materials during the construction of the capital construction facility and also, the results of the work performed meet the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Pressure oil pipeline from MFNS "Naulskaya" to UPN "Labaganskaya" Facilities of the 3rd stage of construction"Compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 83170701635518
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701807105
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701768964
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744529
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744528
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744527
Unscheduled inspection
Start date: 2017-06-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701744526
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744525
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744524
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744515
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744514
Unscheduled inspection
Start date: 2017-06-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701744513
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744512
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744511
Unscheduled inspection
Start date: 2017-06-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701744510
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744509
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744492
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744490
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744489
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744488
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744486
Unscheduled inspection
Start date: 2017-06-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701744485
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744484
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701744483
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 00170701694740
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility on the basis of the completion notice dated 26052017 1117 for the capital construction facility "Arrangement of the cluster site 17 of the Kharampurskoye deposit Southern deposit" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671723
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 23052017 1017 for the capital construction facility "Arrangement of the cluster site 23 of the Kharampurskoye deposit Southern deposit" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671686
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated 22052017 0917 for the facility "Construction of the cluster site 12 of the Severotarasovsky field" stage 2" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671672
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated 22052017 0817 for the facility "Construction of the Ustharampurskoye field cluster site 101" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701671655
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility on the basis of the completion notice dated 12052017 0717 for the capital construction facility "Construction of the SIKNS DNS1 DNS19 Yuzhnokharampurskoye field" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 86170701603031
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-17, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701651387
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701651386
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701651385
Unscheduled inspection
Start date: 2017-05-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701651383
Unscheduled inspection
Start date: 2017-05-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86170701651381
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701651377
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701649245
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701649238
Unscheduled inspection
Start date: 2017-05-30, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170701654023
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-01, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701654015
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-01, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86170701654006
Unscheduled inspection
Start date: 2017-05-31, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86170701651380
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 00170701557267
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-05-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 11042017 0217 for the CAP construction facility "Pressure oil pipeline DNC 3P zdv 6 pc ABZ zdv 4 ZapadnoPurpeyskoye field"the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements requirements and or requirements established by municipal legal acts
# 00170701557233
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-05-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of a notice of completion dated 03042017 0117 for the construction cap facility "Arrangement of the cluster site 41 of the Severokharampurskoye field" the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 00170701678401
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the completed capital construction facility Meter verification and calibration station code 19806110366D" on the basis of the notice of completion of the capital construction facility 1001020621 dated 20032017 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701604990
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-04-06, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to fulfill by a legal entity, an individual entrepreneur, an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements from 17062016 570903616R for the object "Diesel fuel hydrotreating plant in the area of the Tarasovsky field 1 stage"the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is compliance with the instructions of the state control bodies supervision of municipal control bodies
# 65170701443523
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-07, duration: —
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to carry out inspections according to the program approved by the head of the Sakhalin Department of Rostechnadzor D. Y. Yakovlev 23052016. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer
# 00170701561375
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Pipelines of the Mamontovsky region of construction 20112012 code 9494 Pipelines of the Mamontovsky region of construction 20112012 High-pressure water pipeline t20t6" on the basis of the notice of completion of the construction of the capital construction facility 10010205650 from 14022017 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701561508
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Pipelines of the Mamontovsky region of construction 20112012 code 9494 Pipelines of the Mamontovsky region of construction 20112012 High-pressure water pipeline k13k51" on the basis of the notice of completion of the construction of the capital construction facility 10010205649 of 14022017 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701561454
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Pipelines of the Mamontovsky region of construction 20112012 code 9494 Pipelines of the Mamontovsky region of construction 20112012 High-pressure water pipeline t6k13t" on the basis of the notice of completion of the construction of the capital construction facility 10010205651 dated 14022017 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 11170701454112
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 11170701454197
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701349001
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-03-07, duration: —
Authority: YUzhnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: the audit is carried out in order to prevent the threat of harm to the environment specified in the reasoned submission of an official of the state supervisory authority dated 20012017 0570the objectives of this audit are to ensure that a legal entity complies with legislation in the field of environmental protection and environmental safety in terms of waste management with the exception of radioactive waste geological study rational use and protection of subsurface land relations The subject of this audit is compliance with mandatory requirements carrying out measures to prevent harm to the life and health of citizens harm to animals plants and the environment
# 00170701423491
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-21, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program 573516 from 15042016 of the capital construction facility KNS3 of the Petelinsky field cipher 314214415 2nd stage of construction KNS3 Linear pipelines consisting of a Low-pressure water pipeline kust VS 10a tvr2 PTVO Low-pressure water pipeline tvr1 PTVO KNS3 High-pressure water pipeline KNS3 tvr2 K54 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 00170701423376
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-21, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program 576826 from 08082016 of the capital construction facility KNS3 of the Petelinsky deposit cipher 314214415 1st stage of construction of the VS 10a bush reconstruction of the 359 kV substation in the area of KNS3 35 kV overhead line on PS 356 kV KNS3 6 kV overhead line on the VS 10a bush Reconstruction of the 6kV overhead line f111 f 118 Highway on the VS 10a bush Fiber optic communication line Linear pipelines as part of the High-pressure water pipeline Kust vz skv 10atvr prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal legal acts
# 83170701295821
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-20, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the completed works and the construction materials used at the capital construction facility "Objects of the 2nd stage of construction under the project "Expansion of cluster sites 2 3 4 6 Cherpayu oil field" as well as the results of such work with the requirements of technical regulations other regulations and project documentation Verification of work in accordance with paragraph 1 of the Program of inspections Verification tasks verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Objects of the 2nd stage of construction under the project "Expansion of cluster sites 2 3 4 6 Cherpayu oil field" with metering devices for energy resources used to verify compliance with the applied construction materials during the construction of the capital construction facility as well as the results of the work performed to the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and equipment requirements of the capital construction facility "Objects of the 2nd stage of construction under the project "Expansion of cluster sites 2 3 4 6 Cherpayu oil field" metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation
# 83170701295908
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-20, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the completed works and the construction materials used at the capital construction facility "Objects of the 3rd stage of construction under the project "Expansion of cluster sites 2 3 4 6 Cherpayu oil field" as well as the results of such work with the requirements of technical regulations other regulations and project documentation Verification of the work in accordance with paragraph 1 of the Inspection Program Verification tasks verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Objects of the 3rd stage of construction under the project "Expansion of cluster sites 2 3 4 6 Cherpayusky oil field" with metering devices for energy resources used to verify compliance with the applied construction materials during the construction of the capital construction facility as well as the results of the work performed to the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and equipment requirements of the capital construction facility "Objects of the 3rd stage of construction under the project "Expansion of cluster sites 2 3 4 6 Cherpayusky oil field" metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation
# 83170701295936
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 83170701295087
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 83170701294666
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701423082
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed capital construction facility Arrangement of well bushes 504 508 Malobalykskoye field cipher 19806140107D Arrangement of a well bush 504 2nd stage of construction of a 6 kV overhead line on a bush 504 on the basis of a notice of completion of the capital construction facility 100202091445 dated 02122016 prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 00170701419702
Unscheduled inspection
Start date: 2017-01-09, end date: 2017-02-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of the notice of completion of the capital construction facility dated 16122016 10616the tasks of this inspection are to verify the compliance of the completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy resources during the construction of the facility capital construction "Arrangement of the cluster site 28A of the Komsomolskoye field Expansion" located at Yamalonenetsky Autonomous Okrug Purovsky district Komsomolskoye field, the subject of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701430937
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated 30122016 11116 "Arrangement of the cluster site 76 of the Komsomolsk field" of PJSC NK Rosneft. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170701419809
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 13122016 10316 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction the capital construction project "Arrangement of the bush site 35 of the Gubkinskoye field" located at Yamalonenetsky Autonomous Okrug Purovsky District, the purpose of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701419749
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 14122016 10516 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction the capital construction project "Arrangement of the bush site 23 of the Kharampurskoye deposit Yuzhnaya Zalezh" located at Yamalonenetsky Autonomous Okrug Purovsky District Krasnoselkupsky District, the purpose of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701419785
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 14122016 10416 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction the capital construction project "Development of the cluster site 17 of the Kharampurskoye deposit Yuzhnaya Zalezh" located at Yamalonenetsky Autonomous Okrug, Purovsky District, Krasnoselkupsky District, the purpose of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701419724
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 26122016 10816 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used during construction The capital construction facility "Construction of the SIKNS DNC1 DNC19 Yuzhnoharampurskoye field" located at Yamalonenetsky Autonomous Okrug Purovsky district Yuzhnoharampurskoye field, the subject of this inspection is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 11170701296682
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-27, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the completed works and the construction materials used at the capital construction facility "Inter-field oil pipeline DNC "Salyukinskaya PNS at GS "Usa"Reconstruction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 1 of the Inspection Program Verification tasks verification of compliance by a legal entity with the requirements legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Inter-field oil pipeline DNS "Salyukinskaya PNS at GS "Usa" Reconstruction" with metering devices for energy resources used to verify the compliance of the applied building materials during the construction of the capital construction facility as well as the results completed works to the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Inter-field oil pipeline DNS "Salyukinskaya PNS at GS "Usa"Reconstruction" with metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 11170701294155
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-27, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the work performed and the construction materials used at the capital construction facility "Development of the South Balkan field 1st stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 2 of the Inspection Program Verification tasks verification of compliance by a legal entity with the requirements of legislation on urban planning and environmental legislation sanitary norms and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of the Yuzhnobagan field 1st stage of construction" with metering devices for energy resources used to verify compliance of the applied building materials during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of project documentation, including energy requirements efficiency and equipment requirements of the capital construction facility "Development of the Yuzhnobagan field 1st stage of construction" with metering devices for used energy resources availability of a construction permit compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 00160701219880
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is carried out with the aim of implementation of the state construction supervision in accordance with the notice of completion of construction of capital construction object from 25112016 sadatomi of this review are to check the compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulatory legal acts of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources used in the construction of capital construction object "Construction of pipelines 2015 kharampur under the program for improving the reliability of pipelines" located at Yamalo-Nenets Autonomous Okrug Purovsky district of the Kharampur MESTOROZhDENIYa of this review is to highlight kuznecovskaya mandatory requirements established by municipal legal acts of the Federal law of 26122008 294ФЗ "ON protection of rights of legal entities and individual entrepreneurs when implementing the state control and supervision of the municipal control of the" Federal law of 23122009 384ФЗ "Technical regulations on safety of buildings and structures" town planning code of the Russian Federation government of the Russian Federation from 01022006 54 "On the state construction supervision in the Russian Federation" The regulation on the Northern Ural Federal service for ecological, technological and nuclear supervision approved by order from 28062016 262 Federal service for ecological, technological and nuclear supervision, the Order of the Federal service for ecological, technological and nuclear supervision from 13012015 5 "On approval of the List of normative legal acts and normative documents related to the activities of the Federal service for ecological, technological and nuclear supervision section I "Technological construction, energy supervision" П01012014
# 00160701219811
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Federal law of 26122008 294ФЗ "ON protection of rights of legal entities and individual entrepreneurs when implementing the state control and supervision of the municipal control of the" Federal law of 23122009 384ФЗ "Technical regulations on safety of buildings and structures" town planning code of the Russian Federation government of the Russian Federation from 01022006 54 "On the state construction supervision in the Russian Federation" provision on the Northern Ural Federal service for ecological, technological and nuclear supervision approved by order from 28062016 262 Federal service for ecological, technological and nuclear supervision, the Order of the Federal service for ecological, technological and nuclear supervision from 13012015 5 "On approval of the List of normative legal acts and normative documents related to the activities of the Federal service for ecological, technological and nuclear supervision section I "Technological construction, energy supervision" П01012014настоящая inspection is conducted with the aim of implementation of the state construction supervision in accordance with the notice of completion of construction of capital construction object from 28112016 sadatomi of this review are to check the compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulatory legal acts of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources used in the construction of capital construction object "construction of a spray pad 5 Severokommunarskoe field" located at Yamalo-Nenets Autonomous Okrug nadymskiy rayon Severokommunarskoe the field is the Subject of this review is to highlight kuznecovskaya mandatory requirements of the municipal legal acts
# 65160701285299
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-28, duration: —
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of a notice dated 20122016 from PJSC NK Rosneft on the completion of the construction of the capital construction facility "Development of the Katangli and Uyglekuty fields 2 launch complex" Stage 2 of the construction of the power transmission line 35kV one pass substation PS356kV Katangliz The purpose of this inspection is to verify the completed construction of the capital construction facility and evaluate the work performed to make a decision on issuing an opinion on compliance or refusal to issue such an opinion
# 83160701201572
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-09, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the work performed and the construction materials used at the capital construction facility "Construction of exploratory well 2 at the Naulskoye field" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of the work performed in accordance with paragraph 2 of the Inspection Program Verification tasks verification of compliance by a legal entity with the requirements of legislation on urban planning and environmental protection legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Construction of exploratory well 2 at the Naulskoye field" with metering devices for energy resources used to verify compliance of the applied building materials during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Construction of exploratory well 2 at the Naulskoye field" with metering devices for energy resources used availability of a construction permit compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 11160701201510
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-09, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the completed works and the construction materials used at the capital construction facility "Objects of the 6th stage of construction under the project "Arrangement of the Srednemakarikhinsky oil field Correction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 1 of the Program of inspections Verification tasks verification of compliance by a legal entity with the requirements legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Objects of the 6th stage of construction under the project "Arrangement of the Srednemakarikhinsky oil field Adjustment" with metering devices for energy resources used to verify the compliance of the applied building materials during the construction of the capital construction facility as well as the results completed works to the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Objects of the 6th stage of construction under the project "Arrangement of the Srednemakarikhinsky oil field Adjustment" with metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 11160701201425
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-09, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the compliance of the completed works and the construction materials used at the capital construction facility "Arrangement of the Srednemakarikhinsky oil field Correction stage 1 of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of the work in accordance with paragraph 1 of the Inspection Program Verification tasks verification of compliance by a legal entity with the requirements of legislation on urban development environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of the Srednemakarikhinsky oil field Correction of the 1st stage of construction" with metering devices for energy resources used to verify compliance of the applied building materials during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for the equipment of the capital construction facility "Arrangement of the Srednemakarikhinsky oil field Adjustment of the 1st stage of construction" with metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 24160701198543
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-30, duration: —
Authority: Eniseiskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of compliance with regulations
# 00160701261367
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The legal basis of the audit, the Federal law of 26122008 294ФЗ "ON protection of rights of legal entities and individual entrepreneurs when implementing the state control and supervision of the municipal control of the" Federal law of 23122009 384ФЗ "Technical regulations on safety of buildings and structures" town planning code of the Russian Federation government of the Russian Federation from 01022006 54 "On the state construction supervision in the Russian Federation" provision on the Northern Ural Federal service for ecological, technological and nuclear supervision approved by order from 28062016 262 Federal service for ecological, technological and nuclear supervision, the Order of the Federal service for ecological, technological and nuclear supervision from 13012015 5 "On approval of the List of normative legal acts and normative documents related to the activities of the Federal service for ecological, technological and nuclear supervision section I "Technological construction, energy supervision" П01012014настоящая inspection is conducted with the aim of implementation of the state construction supervision in accordance with the notice of completion of construction, reconstruction of capital construction object from 12122016 10216Задачами of this review are to check the compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulatory legal acts of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources used in the construction of capital construction object "Cluster Playground 75 Komsomolskoye field" located at Yamalo-Nenets Autonomous Okrug Purovsky district Komsomol MESTOROZhDENIYa of this review is to highlight kuznecovskaya mandatory requirements of the municipal legal acts
# 00160701261355
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Legal grounds for conducting an audit Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the exercise of State Control Supervision and Municipal Control" Federal Law of 23122009 384 FZ "Technical Regulations on the Safety of Buildings and Structures" Urban Planning Code of the Russian Federation Decree of the Government of the Russian Federation of 01022006 54 "On State Construction Supervision in the Russian Federation" The Regulation on the North Ural Department of the Federal Service for Environmental Technological and Nuclear Supervision was approved by Order No. 28062016 262 of the Federal Service for Environmental Technological and Nuclear Supervision Order of the Federal Service for Environmental Technological and Nuclear Supervision dated 13012015 5 "On approval of the List of Regulatory Legal Acts and regulatory documents related to the field of activity of the Federal Service for Environmental Technological and Nuclear Supervision Section I "Technological construction energy supervision" P01012014 This inspection is carried out in order to carry out state construction supervision on the basis of a notice of completion of construction reconstruction of a capital construction facility dated 12122016 10116 The tasks of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used in the construction of the capital construction facility "Buildings and structures at site 74 of the Komsomolskoye field" located at Yamalonenetsky Autonomous Okrug Purovsky district Komsomolskoye field
# 86160701209782
Unscheduled inspection
Start date: 2016-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24160701098442
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-12-09, duration: —
Authority: Eniseiskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of compliance with regulations
# 86160701156313
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-25, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701156308
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-25, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701156301
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-25, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701156296
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-25, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 27160701125519
Unscheduled inspection
Start date: 2016-11-24, end date: 2016-12-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program dated 27092016. The purpose of this inspection is to monitor compliance by construction participants with legislation on urban development activities. The purpose of this inspection is to verify compliance of the work and the construction materials used during the construction of the Facility as well as the results of such work with the requirements of technical regulations of project documentation
# 11160700581407
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Arrangement of the Srednemakarikhinsky oil field Correction stage 1 of construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of work in accordance with paragraph 1 of the program of verification of compliance by a legal entity with the requirements of legislation on urban development environmental legislation sanitary standards and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of the Srednemakarikhinsky oil field Adjustment of the 1st stage of construction"Compliance of the applied building materials during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of the project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Srednemakarikhinsky oil field Correction stage 1 of construction" with metering devices for energy resources used, the need for construction permits to comply with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation regulations identified during the implementation of federal state construction supervision and construction control
# 86160701025861
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025857
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160701025852
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025849
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025842
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025827
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025822
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160701025813
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025808
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025803
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025799
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025794
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025771
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160701025759
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025385
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026046
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025784
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025705
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025083
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160701025076
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025575
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025778
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701025774
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026066
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026062
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026059
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026052
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026049
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026041
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160701026038
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026034
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026031
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026028
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026024
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026021
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026016
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026012
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701026006
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160701025983
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 65160701067842
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-19, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations
# 65160701067827
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-20, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations
# 65160701068221
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-27, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations
# 86160701070010
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-10-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701069999
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-10-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160701070020
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-10-28, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700835743
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-23, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700835748
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-23, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700835746
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-23, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160700048669
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048614
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048663
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048602
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86160700048650
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048595
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048643
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048587
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048632
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048621
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 65160700972226
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 65160700972186
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700902318
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection:
# 86160700048817
Unscheduled inspection
Start date: 2016-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160700048806
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048801
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048792
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048779
Unscheduled inspection
Start date: 2016-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160700048772
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048762
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048756
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048738
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160700048727
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048714
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048704
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160700048702
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048688
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160700048678
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-09, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160700695667
Unscheduled inspection
Start date: 2016-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160700695696
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700695687
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700695679
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-16, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700695703
Unscheduled inspection
Start date: 2016-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 86160700064851
Unscheduled inspection
Start date: 2016-08-24, end date: 2016-08-25, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160601746438
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection:
# 86160601746434
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160601746424
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700064855
Unscheduled inspection
Start date: 2016-08-26, end date: 2016-08-29, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Control over the execution of a mandatory prescription
# 86160601746458
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-04, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160601746454
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-04, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160601746446
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-04, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 86160700048823
Unscheduled inspection
Start date: 2016-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 65160601750671
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-21, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations
# 65160601750437
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-21, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations
# 65160601750516
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-21, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations
# 86160601736361
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-14, duration: —
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Monitoring the implementation of a mandatory prescription
# 00160601653853
Unscheduled inspection
Start date: 2016-06-01, end date: 2016-06-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations, norms and rules of other regulatory legal acts of the project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Installation of diesel fuel hydrotreating in the area of the Tarasovsky field 1 stage"
# 00160600822392
Unscheduled inspection
Start date: 2016-06-01, end date: 2016-06-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision on the verification program. The tasks of this inspection are to verify the compliance of the work performed with the requirements of technical regulations, norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility "Diesel fuel hydrotreating plant in in the area of the Central Control Station of the Tarasovsky field, stage 1"
# 65160601577064
Unscheduled inspection
Start date: 2016-04-04, end date: 2016-04-08, duration: —
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: On the implementation of the regulation P310 of 20112015
# 65160601589681
Unscheduled inspection
Start date: 2016-04-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 65160601555147
Unscheduled inspection
Start date: 2016-02-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24160601462576
Unscheduled inspection
Start date: 2016-01-25, end date: 2016-02-19, duration: —
Authority: Eniseiskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Checking the fulfillment of the prescription
# 07150601448118
Unscheduled inspection
Start date: 2015-12-17, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po KabardinoBalkarskoi Respublike
Purpose of inspection: verification of the consumer's statement
# 65150601442482
Unscheduled inspection
Start date: 2015-12-25, end date: 2016-01-29, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Sahalinskoi oblasti
Purpose of inspection: execution of the previously issued prescription dated 23072015 01H15VI
# 00150601315821
Unscheduled inspection
Start date: 2015-12-02, end date: 2015-12-29, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: supervision of the implementation of regulations
# 00150601309268
Unscheduled inspection
Start date: 2015-11-05, end date: 2015-12-02, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po HantyMansiiskomu avtonomnomu okrugu YUgre
Purpose of inspection: In order to verify the fulfillment by a legal entity of JSC NK Rosneft of the requirements of the previously issued order on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements 306ZK40 dated 09092014, the task of this audit is to monitor the execution of the previously issued order on the elimination of identified violations of legislation in the field of environmental protection and violations of environmental requirements 306ZK40 dated 09092014
# 00150601309267
Unscheduled inspection
Start date: 2015-11-05, end date: 2015-12-02, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po HantyMansiiskomu avtonomnomu okrugu YUgre
Purpose of inspection: In order to verify the fulfillment by a legal entity of JSC NK Rosneft of the requirements of the previously issued order on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements 305ZK40 dated 09092014, the task of this audit is to monitor the implementation of the previously issued order on the elimination of identified violations of legislation in the field of environmental protection and violations of environmental requirements 305ZK40 dated 09092014
# 70150600065045
Unscheduled inspection
Start date: 2015-07-20, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Tomskoi oblasti
Purpose of inspection: control over the implementation of the regulations issued by Rosneft on the elimination of identified violations of mandatory requirements for measures to ensure the prevention of harm to plants, animals, the environment, state security, property of individuals and legal entities, state or municipal property, prevention of natural and man-made emergencies dated 23122013 32662013ROS under license VOLUME 01183 HP to perform 3D seismic surveys in accordance with the established license agreement in volumes from 23122013 32672013ROS under license VOLUME 01183 HP to enter the Danenbergovskoye and Kulyeganskoye fields into pilot development from 23122013 32692013ROS under license VOLUME 01183 HP to perform 3D seismic exploration in volumes established by the license agreement from 23122013 32722013ROS under license VOLUME 01184 HP to enter into pilot development the Severokalinovoye field in accordance with the terms of the license agreement from 23122013 32732013 SOFTWARE SURVEY licenses VOLUME 01184 HP to complete the construction of 1 exploration well, subject to the right to geological exploration of the subsoil, the term of which expired on 16062015 inclusive
# 07150601208959
Unscheduled inspection
Start date: 2015-07-17, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po KabardinoBalkarskoi Respublike
Purpose of inspection: Consumer protection
# 24150600011555
Unscheduled inspection
Start date: 2015-06-29, end date: 2015-07-24, duration: —
Authority: Eniseiskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Verification of compliance with the requirements of 23122013 32762013ROS 32792013ROS 32812013ROS 32842013ROS 32862013ROS 32872013ROS