Found 186 inspections:

# 662101438368
Unscheduled inspection
Start date: 2021-12-10, end date: 2021-12-24, duration: 11
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 53429 dated 03.12.2021, in accordance with the inspection program dated No. the task of this inspection is to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Construction and reconstruction of the street and road network with the construction of a tram line within the boundaries of the Verkhnyaya Pyshma urban district and the Yekaterinburg City municipality. Stage 1. Construction and reconstruction of the street and road network with the construction of a tram line", located at the address: Sverdlovsk region, Verkhnyaya Pyshma, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662101407793
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-24, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the reconstruction of the capital construction facility. No. 29-01-41/52113 dated 11/26/2021, in accordance with the inspection program dated no. The task of this inspection is to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility "Verkhnyaya Pyshma Road and Transport Infrastructure. Highway on Feofanova St.", located at the address: Sverdlovsk region, Verkhnyaya Pyshma, Feofanova St., as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662101444869
Unscheduled inspection
Start date: 2021-12-13, end date: 2022-01-14, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the reconstruction of the capital construction facility. No. 53857 dated 07.12.2021, in accordance with the inspection program dated 17.07.2020 No. 29-17-17/176-20, the task of this inspection is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the building materials used during the reconstruction of the capital construction facility "Reconstruction of the MAOU DO DDT building" branch "Center for Creativity on Uspenskoye", located at 111b Uspenskiy Ave., letter A, Verkhnyaya Pyshma, located at: Sverdlovsk region, Verkhnyaya Pyshma, prospekt. Uspensky, 111b, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in the case of, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; meeting the requirements, established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662101382269
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 662101340811
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662101137098
Unscheduled inspection
Start date: 2021-10-08, end date: 2021-11-08, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out on the basis of a notice of completion of the reconstruction of the capital construction facility. No. 29-01-41/42032 dated 09/28/2021, the purpose of this audit is to carry out regional state construction supervision. 7. The subject of this audit is to verify the compliance of the work performed and the construction materials used in the reconstruction of the capital construction facility "Reconstruction of the municipal Autonomous Educational institution Secondary General Education School No. 1 with in-depth study of individual subjects named after B.S. Suvorov." Stage 2", located at the address: Sverdlovsk region, Verkhnyaya Pyshma, st. Krasnoarmeyskaya, 6, as well as the results of such work according to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements a capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100931635
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-22, duration: 19
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program no. ot; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: The road transport infrastructure of Verkhnyaya Pyshma. The Uspensky Avenue highway from Petrov Street to the overpass located at the address: Sverdlovsk region, Verkhnyaya Pyshma, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are met efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100930559
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-22, duration: 19
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program no. ot; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Stage No. 4 is a section of Mashinostroiteley Street, north of Gorokhovaya Street in alignment with the boundaries of the land plot developed by CJSC YIT Uralstroy and a section of a local street (presumably Sapozhnikova Street) west of Mashinostroiteley Street in alignment with the boundaries of the land plot developed by CJSC YIT Uralstroy from the object: Street sections Mashinostroiteley, Maltsev and Zelenaya within the boundaries of the Severny district of Verkhnyaya Pyshma, located at the address: Sverdlovsk Region, Verkhnyaya Pyshma, in the area of Mashinostroiteley St., the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100888783
Unscheduled inspection
Start date: 2021-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 662100433030
Unscheduled inspection
Start date: 2021-08-11, end date: 2021-08-25, duration: 11
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-01/382-19 dated 2021-07-12; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Universal sports and recreation complex at 53 Krivousova St. in Verkhnyaya Pyshma, located at 53 Krivousova St., Verkhnyaya Pyshma, Sverdlovsk region, in the area of house 53, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100396507
Unscheduled inspection
Start date: 2021-08-03, end date: 2021-08-16, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-24/122-21 dated 2021-05-21; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Construction of a highway along Sapozhnikova St. from Uralskikh Rabochy St. to Maltsev St., located at the address: Sverdlovsk region, Verkhnyaya Pyshma, Sapozhnikova St., the results of such work meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (except for capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100396398
Unscheduled inspection
Start date: 2021-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 662100396337
Unscheduled inspection
Start date: 2021-08-03, end date: 2021-08-16, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/128-20 dated 2020-06-03; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: The road transport infrastructure of Verkhnyaya Pyshma. The highway from the industrial site of JSC Uralsky Chemical Plant to the industrial site of JSC Uralelectromed, located at the address: Sverdlovsk region, Verkhnyaya Pyshma, Chkalova St., city Park district, the results of such work meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100328244
Unscheduled inspection
Start date: 2021-07-05, end date: 2021-07-16, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662100312243
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 662100328221
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 662100278709
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-23, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 29-01-41/23199 dated 06/07/2021 (subparagraph "a" of paragraph 2 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation), the purpose of this audit is to carry out regional state construction supervision. 7. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Designing a sports complex with a ski-roller track" located at the address: Sverdlovsk region, Verkhnyaya Pyshma, Chkalova St., City Park district, as well as the results of such work with the requirements approved in accordance with Parts 15, 15.2 and 15.3 of Articles 48 of the Urban Planning Code of the Russian Federation of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model ( if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation


# 662100310279
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-12, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-01/108-19 dated 2019-04-18; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: The road transport infrastructure of Verkhnyaya Pyshma. The Uspensky Avenue highway from Petrova St. to the overpass located at the address: Sverdlovsk region, Verkhnyaya Pyshma, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are met efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100310226
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-12, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-01/107-19 dated 2019-04-18; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Construction and reconstruction of the street and road network with the construction of a tram line within the boundaries of the Verkhnyaya Pyshma urban district and the Yekaterinburg City municipality. Stage 1. Construction and reconstruction of the street and road network with the construction of a tram line located at the address: Sverdlovsk region, Verkhnyaya Pyshma, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for used energy resources; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100217612
Unscheduled inspection
Start date: 2021-06-01, end date: 2021-06-10, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-01/415-18 dated 2019-08-27; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Reconstruction of the municipal autonomous educational institution Secondary General Education School No. 1 with in-depth study of individual subjects named after B.S. Suvorov. Stage 2, located at the address: Sverdlovsk region, Verkhnyaya Pyshma, st. Krasnoarmeyskaya, 6, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100215542
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program no. ot; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: The SAMBO Palace in Verkhnyaya Pyshma, located at 1B Gornyakov St., Verkhnyaya Pyshma, Sverdlovsk Region, meets the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, on energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100207256
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-17/176-20 dated 2020-07-17; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Reconstruction of the building of the MAOU DO DDT branch of the Center for Creativity on Uspensky, located at 111b Uspensky Ave., letter A, Verkhnyaya Pyshma, located at 111b Verkhnyaya Pyshma Ave., Sverdlovsk Region. Uspensky, 111b, the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100207290
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662100207066
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-31, duration: 11
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-15/121-20 dated 2021-01-11; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Reconstruction of the store building for a sports and recreation complex located at 73 40 let Oktyabrya str., Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for the energy resources used; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100207072
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-31, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-01/382-19 dated 2021-03-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Universal sports and recreation complex at 53 Krivousova St. in Verkhnyaya Pyshma, located at 53 Krivousova St., Verkhnyaya Pyshma, Sverdlovsk region, in the area of house 53, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100145720
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-18, duration: 30
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 14061 dated 04/09/2021 in accordance with subparagraph "a" of paragraph 2 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation, the task of this audit is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the building materials used in the construction of the capital construction facility "Administration Building of the Verkhnyaya Pyshma city district of the Sverdlovsk region in Verkhnyaya Pyshma, Uspensky Ave., 115", located at: Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Ave., 115, as well as the results of such work the requirements of the design documentation specified in paragraph 1 of Part 5 of Article 49 of the Urban Planning Code of the Russian Federation (including design documentation that takes into account the changes made in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 662100132639
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-15/121-20 dated 2021-01-11; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Reconstruction of the store building for a sports and recreation complex located at 73 40 let Oktyabrya str., Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for the energy resources used; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100143348
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-07, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-01/525-18 dated 2021-01-15; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: The SAMBO Palace in Verkhnyaya Pyshma, located at 1B Gornyakov St., Verkhnyaya Pyshma, Sverdlovsk Region, meets the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, on energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100128438
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-01/382-19 dated 2021-03-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Universal sports and recreation complex at 53 Krivousova St. in Verkhnyaya Pyshma, located at 53 Krivousova St., Verkhnyaya Pyshma, Sverdlovsk region, in the area of house 53, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100072297
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-02, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-15-22/343 dated 01/22/2021, issued by the MBU "Capital Construction Department of the Verkhnyaya Pyshma City District", the purpose of this inspection is to carry out regional state construction supervision. 7. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 01/22/2021 No. 29-15-22/343, issued by the MBU "Capital Construction Department of the Verkhnyaya Pyshma City District"


# 662105344349
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662105301038
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-15/121-20 dated 2021-01-11; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Reconstruction of the store building for a sports and recreation complex located at 73 40 let Oktyabrya str., Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for the energy resources used; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662005269970
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005246514
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005246518
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-18, duration: 14
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose the inspection is carried out on the basis of the notice of completion of the reconstruction of the capital construction facility vh 29018243592 dated 23112020 implementation of the inspection program 29151912520 dated 20200601 Tasks implementation of regional state construction supervision Subject verification of compliance with the work and applicable building materials during the construction of the capital construction facility Road transport infrastructure Verkhnyaya Pyshma Highway on Lesnaya Street located in the Sverdlovsk region Verkhnyaya Pyshma Lesnaya Street results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation


# 662005219146
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29171512120 dated 25052020 the task is to carry out regional state construction supervision. The purpose is to verify the compliance of the work and the construction materials used during the reconstruction of the capital construction facility "Reconstruction of the store building for a sports and recreation complex" located at 73 40 let Oktyabrya str., Sverdlovsk region, Verkhnyaya Pyshma, as well as the results of such work specified in paragraph 1 of Part 5 article 49 of the Urban Planning Code of the Russian Federation to the requirements of the project documentation, including the project documentation that takes into account the changes made in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used


# 662005244049
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 662005140413
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-30, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is being carried out in order to implement the inspection program 29170138219 dated 03072020. The purpose of this inspection is to carry out regional state construction supervision.7 The subject of this inspection is to verify the compliance of work performed and building materials used during the construction of the capital construction facility "Universal Sports and Recreation Complex at 53 Krivousova St. in Verkhnyaya Pyshma" located in the Sverdlovsk region Verkhnyaya Pyshma, Krivousova St., in the area of house 53, as well as the results of such work to the requirements of project documentation specified in paragraph 1 of part 5 of Article 49 of the Urban Planning Code of the Russian Federation, including project documentation that takes into account the changes made in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements and equipment requirements for the capital construction facility construction of metering devices for used energy resources


# 662005172035
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-11-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170115019 dated 11092020the tasks are to carry out regional state construction supervision. The purpose is to verify the compliance of work performed and construction materials used during the reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Articles 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used the availability of a building permit and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662005172026
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration:
Authority:
Purpose of inspection:


# 662005177815
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 662004471412
Unscheduled inspection
Start date: 2020-08-04, end date: 2020-08-18, duration: 11
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170141518 dated 20190827 Tasks implementation of regional state construction supervision Subject verification of compliance with the performance of work and applicable building materials during the construction of a capital construction facility Reconstruction of the municipal autonomous educational institution Secondary General Education School 1 with in-depth study of individual subjects named after BS Suvorov stage 2 located at the address Sverdlovsk region Verkhnyaya Pyshma street Krasnoarmeyskaya d 6 results such works meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004476563
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170141218 dated 17122019 Tasks implementation of regional state construction supervision The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility Reconstruction of the building of the municipal autonomous educational institution Secondary School 3 and the construction of an annex at the address Verkhnyaya Pyshma Mashinostroiteley str 6 2nd stage located at the address Sverdlovsk region Verkhnyaya Pyshma ul 6 of the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004471464
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 662004486591
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-09-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2917-0148118 dated 20181113 Tasks implementation of regional state construction supervision Subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Reconstruction of MAOU Secondary Educational School 25 at 43a Petrova Street in Verkhnyaya Pyshma, Sverdlovsk region, located at 43 Petrova Street, Sverdlovsk region, Verkhnyaya Pyshma, the results of such work with the requirements of the approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code. the Code of the Russian Federation


# 662004437121
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004457377
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 662004458044
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-08-14, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29151912520 dated 20200601 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Road transport infrastructure Verkhnyaya Pyshma Highway on Lesnaya Street located at the address Sverdlovsk region Verkhnyaya Pyshma Lesnaya Street the results of such work with the requirements approved in accordance with parts 15 152 and 153 article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004457996
Unscheduled inspection
Start date: 2020-07-22, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004458021
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-08-14, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29151513320 dated 20200605 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Road infrastructure Verkhnyaya Pyshma Highway on Ordzhonikidze Street located at the address Sverdlovsk region Verkhnyaya Pyshma Ordzhonikidze Street the results of such work with the requirements approved in accordance with parts 15 152 and 153 article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004457989
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-08-14, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29151511420 dated 20200525 Tasks implementation of regional state construction supervision Subject verification of compliance of the work and applicable building materials during the construction of a capital construction facility Design of a sports complex with a ski roller track located at the address Sverdlovsk region Verkhnyaya Pyshma ul. Chkalova district city park results of such work requirements approved in accordance with parts 15 152 and 153 article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004436838
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004436893
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-17, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29150110819 dated 20190418 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Road infrastructure Verkhnyaya Pyshma Prospekt Uspensky highway from Petrov Street to the overpass located at the Sverdlovsk region Verkhnyaya Pyshma Prospekt Uspensky the results of such work with the requirements approved in accordance with parts 15 152 and 153 Articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004430144
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration:
Authority:
Purpose of inspection:


# 662004420545
Unscheduled inspection
Start date: 2020-06-04, end date: 2020-06-19, duration: 11
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29171512120 dated 20200525 Tasks implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility Reconstruction of a store building for a sports and recreation complex located at the address Sverdlovsk region Verkhnyaya Pyshma ul. 40 let Oktyabrya d 73 the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004419789
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004428236
Unscheduled inspection
Start date: 2020-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 662004418481
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-11, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the notice of the beginning of construction dated 18052020 29018217763 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility The design of a sports complex with a ski roller track located at the address Sverdlovsk region Verkhnyaya Pyshma ul. Chkalova district city park of the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004418182
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-11, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 291701412182 from the Task is to carry out regional state construction supervision The subject is to verify the conformity of work and applicable building materials during the construction of a capital construction facility Reconstruction of the building of the municipal autonomous educational institution Secondary School 3 and the construction of an annex at the address Verkhnyaya Pyshma Mashinostroiteley Str 6 Stage 2 located at the address Verkhnyaya Pyshma Mashinostroiteley Str Sverdlovsk region e 6 of the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation


# 662004416996
Unscheduled inspection
Start date: 2020-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 662004403606
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-06-15, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170138219 dated 20191105 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Universal Sports and Recreation Complex at 53 Krivousova St. in Verkhnyaya Pyshma located at the address Sverdlovsk region Verkhnyaya Pyshma Krivousova St. in the area of house 53 of the results of such work with the requirements approved in accordance with with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federations


# 662004403602
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-05, duration: 19
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170122519 dated 20190724 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility The construction of the emergency rescue unit MCU UGZ GO Verkhnyaya Pyshma located at the address Sverdlovsk region Verkhnyaya Pyshma ul Baltymskaya d 2 bldg And the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004403600
Unscheduled inspection
Start date: 2020-05-12, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004382219
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-17, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2917-0148118 dated 20181113 Tasks implementation of regional state construction supervision Subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Reconstruction of MAOU Secondary Educational School 25 at 43a Petrova Street in Verkhnyaya Pyshma, Sverdlovsk region, located at 43 Petrova Street, Sverdlovsk region, Verkhnyaya Pyshma, the results of such work with the requirements of the approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code. the Code of the Russian Federation


# 662004381370
Unscheduled inspection
Start date: 2020-04-14, end date: 2020-04-24, duration: 9
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170141518 dated 20190827 Tasks implementation of regional state construction supervision Subject verification of compliance with the performance of work and applicable building materials during the construction of a capital construction facility Reconstruction of the municipal autonomous educational institution Secondary General Education School 1 with in-depth study of individual subjects named after BS Suvorov stage 2 located at the address Sverdlovsk region Verkhnyaya Pyshma street Krasnoarmeyskaya d 6 results such works meet the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004359456
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-04-10, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to implement the inspection program 291719169 dated March 10, 2020. The objectives of this audit are to carry out regional state construction supervision.7 The subject of this audit is to verify the compliance of work performed and applicable building materials during the construction of the capital construction facility "Administration Building of the Verkhnyaya Pyshma City District of the Sverdlovsk Region in Verkhnyaya Pyshma, Uspensky Ave. 115" located at 115 Uspensky Ave., Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004246339
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-28, duration: 19
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170122519 dated 20190724 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility The construction of the emergency rescue unit MCU UGZ GO Verkhnyaya Pyshma located at the address Sverdlovsk region Verkhnyaya Pyshma ul Baltymskaya d 2 bldg And the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004246199
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 662004276389
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 662004271449
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-13, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170138219 dated 20191105 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Universal Sports and Recreation Complex at 53 Krivousova St. in Verkhnyaya Pyshma located at the address Sverdlovsk region Verkhnyaya Pyshma Krivousova St. in the area of house 53 of the results of such work with the requirements approved in accordance with with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federations


# 662004197122
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority:
Purpose of inspection:


# 662004193112
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-02-14, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29170152518 dated 2018/1212 Tasks implementation of regional state construction supervision Subject is to verify the compliance of the work and applicable building materials during the construction of the SAMBO Palace capital construction facility in Verkhnyaya Pyshma located at the address Verkhnyaya Pyshma Sverdlovsk region of the results of such work with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation Russian Federation design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661904033779
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the execution of a previously issued order to eliminate a detected violation of mandatory requirements 291707719P2 dated 281019the tasks are to carry out regional state construction supervision and to implement a previously issued order to eliminate a detected violation of mandatory requirements 291707719P2 dated 281019


# 661904063174
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: inspection carried out on the basis of notice of completion of construction of capital construction object 29018254947 from 27112019 in accordance with the program of inspections subparagraph "a" of paragraph 2 of part 5 of article 54 of the town planning code of the Russian Federation objectives of this review are the implementation of the regional state building надзора6 the Subject of this test is to verify compliance of work and construction materials used in the construction process of the object of capital construction "Phase 3 Phase Green street project to the West of the street machine Builders in alignment with the boundaries of the land reclaimed JSC "YIT Uralstroy" from the parts of the streets of mechanical Engineers Maltsev and Green within the boundaries of the district "Northern" g Verkhnyaya Pyshma" located at Sverdlovsk oblast g Verkhnyaya Pyshma in the RNE St Mashinostroiteley as well as the results of such work approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 661904063034
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the notice of completion of the construction of the capital construction facility bx 29018254950 dated 27112019. The objectives of this inspection are to carry out regional state construction supervision.6 The subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "Construction of Shady Design street from Pervomaiskaya Street to the border of the land plot with cadastral number 663632010011389 with Balty Verkhnyaya Pyshma, Sverdlovsk Region" located at Verkhnyaya Pyshma with Balty, Sverdlovsk Region, as well as the results of such work approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661904063007
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the notice of completion of the reconstruction of the capital construction facility bx 29018254949 dated 27112019. The objectives of this inspection are to carry out regional state construction supervision.6 The subject of this inspection is to verify the compliance of the work and construction materials used in the reconstruction of the capital construction facility "Road Transport Infrastructure Verkhnyaya Pyshma Highway on Maltseva St." located in the Sverdlovsk region of Verkhnyaya Pyshma, Maltseva St., as well as the results of such work approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903945269
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to implement the inspection program 29170138219 dated November 05, 2019. The objectives of this audit are to carry out regional state construction supervision.7 The subject of this audit is to verify the compliance of work performed and building materials used during the construction of the capital construction facility "Universal Sports and Recreation Complex at 53 Krivousova Street in Verkhnyaya Pyshma" located at the address Verkhnyaya Pyshma, Sverdlovsk region, Krivousova St., in the area of 53, as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements set out in parts 2, 3, and 31 of Article 52 Urban Planning Code of the Russian Federation


# 661903913221
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 661903699339
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170122519 dated July 24, 2019. The tasks are to carry out regional state construction supervision. The purpose is to verify the compliance of work performed and construction materials used during the reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices the energy resources used, the availability of a building permit, and the fulfillment of the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903698808
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170115019 dated May 29, 2019. Tasks are to carry out regional state construction supervision. The purpose is to verify the compliance of work performed and construction materials used during the reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices the energy resources used, the availability of a building permit, and the fulfillment of the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903698548
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170152518 dated December 12, 2018The tasks of the regional state construction supervision are to verify the compliance of the work and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices the energy resources used, the availability of a building permit, and the fulfillment of the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903804019
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-11-01, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29150152618 dated December 14, 2018 for the capital construction facility. The objectives of this inspection are to carry out regional state construction supervision.7 The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Verkhnyaya Pyshma Highway Infrastructure on Feofanova St." located in the Sverdlovsk region Verkhnyaya Pyshma, Feofanova St., the results of such work, project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903804117
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-11-01, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the test is aimed at the implementation of the programme of inspections 29150123019 30 July 2019 objectives of this review are the implementation of the regional state building надзора7 the Subject of this test is to verify compliance of work and construction materials used in the construction process of the object of capital construction "Phase 3 Phase Green street project to the West of the street machine Builders in alignment with the boundaries of the land reclaimed JSC "YIT Uralstroy" from the parts of the streets of mechanical Engineers Maltsev and Green within the boundaries of the district "Northern" g Verkhnyaya Pyshma" located at Sverdlovsk oblast g Verkhnyaya Pyshma in the RNE St Mashinostroiteley as well as the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of equipment capital the construction of the metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 661903804092
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-11-01, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to implement the inspection program 29150121919 dated July 24, 2019. The objectives of this audit are to carry out regional state construction supervision.[7] The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility "Construction of Shady Designnaya Street from Pervomaiskaya Street to the border of the land plot with cadastral number 663632010011389 with Balty GO Verkhnyaya Pyshma, Sverdlovsk Region" located at Verkhnyaya Pyshma, Sverdlovsk Region, with Balty, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903804000
Unscheduled inspection
Start date: 2019-10-08, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661903861597
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-11-14, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 291701202164 dated August 19, 2019. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Reconstruction of the building of the municipal autonomous educational institution Secondary School 3 and the construction of an annex at Verkhnyaya Pyshma st. Mashinostroiteley 6 1st stage" located at Sverdlovskaya the region of Verkhnyaya Pyshma, Mashinostroiteley str., house 6, the results of such work are consistent with building codes and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661903804382
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 661903408227
Unscheduled inspection
Start date: 2019-09-11, end date: —, duration:
Authority:
Purpose of inspection:


# 661903066403
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program dated December 12, 2018 29170152518 The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 The Urban Planning Code of the Russian Federation, project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities on The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation.


# 661903065603
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 661902925915
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 661902913392
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of the reconstruction of the capital construction facility 29018234534 dated 26072019 in accordance with subparagraph "a" of paragraph 2 of part 5 of Article 54 of the Urban Planning Code of the Russian Federation. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and the construction materials used in the reconstruction of the capital construction facility "Reconstruction of municipal the autonomous educational institution "Secondary General Education School 1 with in-depth study of individual subjects named after BS Suvorov " Stage 1" located at the address Sverdlovsk region Verkhnyaya Pyshma, Krasnoarmeyskaya St., house 6, the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of facility equipment capital construction with metering devices for used energy resources , as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902918046
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707457p dated July 12, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291707457p dated July 12, 2019


# 661902850219
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 661902883589
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707229p dated April 16, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291707229p dated April 16, 2019.


# 661902870819
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program 29170125718 dated July 02, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of work performed and applicable building materials during the construction of the capital construction facility "Administration Building of the Verkhnyaya Pyshma City District of the Sverdlovsk Region in Verkhnyaya Pyshma, 115 Uspensky Ave." located at 115 Uspensky Ave., Sverdlovsk region, Verkhnyaya Pyshma, the results of such work meet the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation


# 661902847789
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170148118 dated November 13, 2018. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Reconstruction of MAOU Secondary Educational School 25 at 43a Petrova Street in Verkhnyaya Pyshma, Sverdlovsk region, located at 43 Petrova Street, Sverdlovsk region. the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902780561
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29150152618 dated December 14, 2018 for the capital construction facility. The objectives of this inspection are to carry out regional state construction supervision.7 The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Verkhnyaya Pyshma Highway Infrastructure on Feofanova St." located in the Sverdlovsk region Verkhnyaya Pyshma, Feofanova St., the results of such work, project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902780381
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to implement the inspection program 29150110719 dated April 18, 2019. The objectives of this audit are to carry out regional state construction supervision.[7] The subject of this audit is to verify the compliance of the work performed and the building materials used in the construction of the capital construction facility "Construction and Reconstruction of a street road network with the construction of a tram line within the boundaries of the Verkhnyaya Pyshma urban District and the municipality"the city of Yekaterinburg" Stage 1 Construction and reconstruction of a street-road network with the construction of a tram line" located at Verkhnyaya Pyshma, Sverdlovsk region, the results of such work, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of building permits and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902780522
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration:
Authority:
Purpose of inspection:


# 661902758724
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170152518 dated December 12, 2018application of the regional state construction supervision. The purpose is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility with the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902587942
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-17, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170125718 dated July 02, 2018. The task is to carry out regional state construction supervision. The subject is to verify the conformity of work and applicable building materials during the construction of the capital construction facility "Administration Building of the Verkhnyaya Pyshma city district of the Sverdlovsk region in Verkhnyaya Pyshma, Uspensky Ave. 115" located at the address Sverdlovsk region Verkhnyaya Pyshma, Uspensky Ave. the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902610467
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 661902666500
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-05-24, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29150152618 dated December 14, 2018. The objectives of this inspection are to carry out regional state construction supervision. 7 The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "Verkhnyaya Pyshma Highway on Feofanova Street" located in the Sverdlovsk region of Verkhnyaya Pyshma Feofanova St. the results of such work, project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902666553
Unscheduled inspection
Start date: 2019-04-25, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661902621379
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170148118 dated November 13, 2018. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility Reconstruction of MAOU Secondary Educational School 25 at 43a Petrova Street in Verkhnyaya Pyshma, Sverdlovsk region, located at 43 Petrova Street, Sverdlovsk region. the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902607455
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration:
Authority:
Purpose of inspection:


# 661902607336
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-04-23, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707815p dated December 05, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707815p dated December 05, 2018.


# 661902558518
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661902495752
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-07, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170152518 dated December 12, 2018. Tasks are to carry out regional state construction supervision. The subject is to verify the compliance of the work performed and the construction materials used in the construction of an investment facility with the results of such work with the requirements of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902480322
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-11, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of the reconstruction of the capital construction facility 2901822653 dated 18012019 in accordance with subparagraph "a" of paragraph 2 of part 5 of Article 54 of the Urban Planning Code of the Russian Federation. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used in the reconstruction of the capital construction facility "Reconstruction the building of the Olympic Reserve School at 43 Verkhnyaya Pyshma Petrova St. for the building of an elementary school with 25 seats for 600" located at 43 Verkhnyaya Pyshma Petrova St., Sverdlovsk region, results of such work to meet the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and equipment requirements a capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902436085
Unscheduled inspection
Start date: 2019-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 661902435998
Unscheduled inspection
Start date: 2019-01-31, end date: 2019-02-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707817 P1 dated December 05, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707817 P1 dated December 05, 2018.


# 661902440545
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority:
Purpose of inspection:


# 661902432218
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661902455033
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-02-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed facility Tasks implementation of regional state construction supervision Subject verification of compliance of the work and the construction materials used in the construction of the capital construction facility results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility metering devices used energy resources as well as the availability of a construction permit and compliance with the requirements of Parts 2 to 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902310611
Unscheduled inspection
Start date: 2019-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 661802199785
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170130418 dated July 20, 2018. Tasks are to carry out regional state construction supervision. The subject is to verify the compliance of work performed and construction materials used in the construction of an investment facility with the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping an investment facility with metering devices for energy resources used, as well as the availability of a construction permit and meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661802129686
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 661802052863
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-23, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 291701202163 dated September 06, 2017. The task is to carry out state construction supervision. The subject is to verify the conformity of work and construction materials used in the construction of a capital construction facility "Reconstruction of the building of the municipal autonomous educational institution Secondary School 3 and the construction of an annex 1 stage" located at the address Verkhnyaya Pyshma, ul. Mashinostroiteley, Sverdlovsk region 6 the results of such work are subject to building codes and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661802129861
Unscheduled inspection
Start date: 2018-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 661802129737
Unscheduled inspection
Start date: 2018-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 661802127508
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated August 28, 2018 291307187 p The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated August 28, 2018 291307187 p


# 661802094176
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 661801944291
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 661801683432
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 661801929521
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 661801565814
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800648760
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 661800681141
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800616793
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 661800606105
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800664943
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 661800616556
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-08-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of paragraphs 15 of the previously issued order to eliminate the identified violation of mandatory requirements dated May 25, 2018 291307257 p The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of paragraphs 15 of the previously issued order to eliminate the identified violation of mandatory requirements dated May 25, 2018 291307257 p


# 661800658906
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800582368
Unscheduled inspection
Start date: 2018-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 661800545915
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170114418 dated April 25, 2018. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility, the attached building of the small ice arena, with the Sports and Recreation Complex at 53 Krivousova Street in Verkhnyaya Pyshma, Stage II of construction located at the address Verkhnyaya Pyshma, Sverdlovsk region. compliance of the results of such work with building codes and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661800545403
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170130417 amendment 1 dated July 05, 2018. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility at 53 Krivousova Street in Verkhnyaya Pyshma located at 53 Verkhnyaya Pyshma Street in the Sverdlovsk region. standards and regulations safety regulations and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661800524097
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800521333
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated April 04, 2018 29130739 p The objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated April 04, 2018 29130739 p


# 661800521915
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 661800521810
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 661800429328
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-07-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to notify the developer of the start of construction of the capital construction facility. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Construction of Zelenaya Street from Kalinina Street to Ordzhonikidze Street in Verkhnyaya Pyshma, Sverdlovsk region" located at Sverdlovskaya the area of Verkhnyaya Pyshma, Zelenaya St., results of such work according to the requirements of the technical regulations of the project documentation


# 661800452581
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-07-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated February 26, 2018 29170796 the objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated February 26, 2018 29170796


# 661800323872
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 2917015917 dated 07032017. The objectives of this inspection are to carry out regional state construction supervision. 7 The subject of this inspection is to verify the compliance of work performed and applicable building materials during the reconstruction of the capital construction facility "Reconstruction of the municipal Autonomous Educational Institution Secondary General Education School 1 with in-depth study of individual subjects named after BS Suvorov"" located at 6 Krasnoarmeyskaya Street, Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800323917
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-05, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program 2917015318 dated 14022018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and construction materials used in the reconstruction of the capital construction facility "Reconstruction of the building of the Olympic Reserve School at the address Verkhnyaya Pyshma Petrova St. 43 for the building of elementary school 25 for 600 places" located at 43 Petrova St., Verkhnyaya Pyshma, Sverdlovsk Region, the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800343925
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated November 21, 2017 291705R6823 The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated November 21, 2017 291705R6823


# 661800325779
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-11, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170130417 dated September 06, 2017. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility at 53 Krivousova St. in Verkhnyaya Pyshma located at 53 Verkhnyaya Pyshma St., Sverdlovsk region, in the area of house 53, the results of such work with building regulations and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661800342628
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-05-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 291701202163 dated 06092017 The task is to carry out state construction supervision The subject is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Reconstruction of the building of the municipal autonomous educational institution "Secondary School 3" and the construction of an annex located at the address Sverdlovsk region Verkhnyaya Pyshma st. Mashinostroiteley 6 the results of such work with building regulations and rules safety regulations and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661800235871
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29170796 dated February 26, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29170796 dated February 26, 2018.


# 661800235905
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707125 dated March 14, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707125 dated March 14, 2018.


# 661800208720
Unscheduled inspection
Start date: 2018-03-16, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800090817
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 66180803052082
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration:
Authority:
Purpose of inspection:


# 661800083474
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-03-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170130417 dated September 06, 2017. The task is to carry out state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility at 53 Krivousova St. in Verkhnyaya Pyshma located at 53 Verkhnyaya Pyshma St., Sverdlovsk region, in the area of house 53, the results of such work with building regulations and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661800033190
Unscheduled inspection
Start date: 2018-02-02, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800033074
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-01, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291705R6823 dated 2111-2017 The task is to carry out state construction supervision The subject is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291705R6823 dated 2111017


# 66180803059694
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-23, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement a program of inspections based on a notice of completion of the capital construction facility. The task is to carry out regional state construction supervision. The subject is to verify the compliance of work and applicable building materials during the construction of the capital construction facility "Construction Sections of Mashinostroiteley Maltseva and Zelenaya Projektnaya streets within the boundaries of the Severny district of Verkhnyaya Pyshma, Stage 2" located at the address Sverdlovsk region Verkhnyaya Pyshma of the results of such work meets the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170802982677
Unscheduled inspection
Start date: 2017-12-18, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170802965530
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-29, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 2917015917 dated 07032017. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and construction materials used in the reconstruction of the capital construction facility "Reconstruction of the municipal Autonomous educational institution "Secondary General Education School 1 with in-depth study of individual subjects named after BS Suvorov" located at 6, Verkhnyaya Pyshma, Sverdlovsk region, the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170802818852
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802786972
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802680886
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802631389
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 2917015917 dated 07032017. The objectives of this inspection are to carry out regional state construction supervision


# 66170802167035
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the notice of the beginning of construction 29018235082 dated 01092017, the objectives of which are to carry out state construction supervision. The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility, the Sports and Recreation complex at 53 Krivousova Street in Verkhnyaya Pyshma located at 53 Verkhnyaya Pyshma Street in the Sverdlovsk region, in the area of house 53, with the results of such work. standards and regulations safety regulations and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66170701876096
Unscheduled inspection
Start date: 2017-08-08, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701850775
Unscheduled inspection
Start date: 2017-08-08, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701857940
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701774716
Unscheduled inspection
Start date: 2017-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701669508
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 30110414917 dated May 26, 2017. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential building in the area of Mira Street 10 in the village of Verkhnyaya Pyshma, Sverdlovsk region" located at the address Sverdlovskaya Verkhnyaya Pyshma region, 10 Mira Street, Iset of the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170701725650
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-07-05, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violations of mandatory requirements 291605163 P1 dated May 19, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violations of mandatory requirements 291605163P2 dated May 19, 2017


# 66170701736212
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701646311
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-09, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291705r5211p1 dated April 12, 2017. The objectives of this inspection are the implementation of regional state construction supervision


# 66170701646345
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-09, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 2917015917 dated 07032017. The objectives of this inspection are to carry out regional state construction supervision


# 66170701619452
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-06-05, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 291701202162 dated 24042017, the objectives of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Reconstruction of the building of the municipal autonomous educational institution "Secondary School 3" located at the address Sverdlovsk region Verkhnyaya Pyshma, Mashinostroiteley str. 6, the results of such work with the construction standards and regulations safety regulations and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66170701648138
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701576657
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701575464
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701518686
Unscheduled inspection
Start date: 2017-04-10, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701465862
Unscheduled inspection
Start date: 2017-04-04, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701329290
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 29170120216 dated 22062016, the objectives of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Reconstruction of the building of the municipal autonomous educational institution "Secondary School 3" and the construction of an annex" located at 6 Mashinostroiteley Street, Verkhnyaya Pyshma, Sverdlovsk region The results of such work are subject to building codes and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66160701266887
Unscheduled inspection
Start date: 2016-12-27, end date: 2017-01-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: inspection of the completed capital construction facility "Second stage of construction Two-section nine-storey residential building in Verkhnyaya Pyshma ul. Sapozhnikova 3" located at the address Sverdlovsk region Verkhnyaya Pyshma ul. Sapozhnikova 3conformity of the work and the construction materials used during the construction of the results of such work to the requirements of the technical regulations of the project documentation, including energy efficiency requirements and equipment requirements a capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66160701266780
Unscheduled inspection
Start date: 2016-12-23, end date: —, duration:
Authority:
Purpose of inspection:


# 66160701028336
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-14, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Implementation of the inspection program 292101 33615 dated September 01, 2015


# 66160701070088
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 66160601767206
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-08-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 29170120916 dated 24062016, the objectives of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Reconstruction of the building of the municipal Autonomous educational institution "Secondary School 3" and the construction of an annex" located at 6 Mashinostroiteley Street, Verkhnyaya Pyshma, Sverdlovsk region The results of such work are subject to building codes and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


Information about inspections