# 002004389725
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-31, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the information contained in the documents of a legal entity establishing its rights and obligations and documents used in the implementation of activities and related to the fulfillment and observance of mandatory requirements for reliability and safety in the operation of electric power facilities, namely violations of the established procedure for commissioning and connecting the electrical installation of the object "Residential building with built-in administrative premises and underground parking on Ulgalitsky in Kaliningrad" as well as the supply of voltage to the electrical installations of the object "Residential building with built-in administrative premises and underground parking on Ulgalitsky in Kaliningrad" without obtaining permission from the state energy supervision authorities without notification of readiness for commissioning sent by the consumer applicant to the state energy supervision authorities in a way that allows you to set the date of sending and receiving notification of readiness for commissioning operation of the facility


# 002004384510
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-13, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is carried out to control the information contained in the documents defining the rights and obligations and instruments used when performing activities associated with the execution and compliance with the mandatory safety requirements in the implementation of the actions which may violate the safe operation of power grid facilities in connection with the receipt in the Northwestern Department of Rostekhnadzor, the application of the citizen gr Sukhareva AL BX 2482128 from 19022020 on the issue of violation of JSC Yantarenergo requirements in connection with the presence in the buffer zone of the electric grid facilities of the transformer substation TP 26106 VL 1526 2ВЛ 04кВ from TP KL 26106 04кВ from TP 26106 at Kaliningrad oblast Guryevsky district POS Cornflower close proximity of the apartment house 37 ul Kaliningrad cabins trailer which creates prerequisites threats of harm to life, health of citizens, property of individuals and legal entities Objectives of this review are the adoption laws of the Russian Federation measures to prevent and remedy violations of the mandatory requirements in the case of their detection and prosecution of persons who committed violations of Federal laws and other normative legal acts, the Subject of this review is the information contained in the documents of the legal entity the individual entrepreneur establishes their organizational and legal form, the rights and obligations of the documents used in the implementation of their activities and associated with the performance of their mandatory requirements of the municipal legal acts of the implementation of the requirements and regulations of government authorities oversight bodies, municipal control


# 002004238884
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-22, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of 30122019 of the deadline for the fulfillment of paragraphs 15 1316 of the regulation dated 28082019 6146182245pr The tasks of this audit are the adoption of measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice those who committed violations requirements of Federal laws and other regulatory legal acts


# 002004245330
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 001904154537
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-23, duration: 6
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the 13122019 deadline for the fulfillment of points 111 1218 36 3964 67 7178 81 82 93 9799 104180 182198 199205 207 208 210217 219221 223 225 226 228230 232234 236 238241 243 244 246251 253 255258 260 261 270 272279 281288 302311 312326 327330 331335 336349 350367 368 369 370377 378386 387395 396398 399407 408413 414428 429440 460461 501515 518 526 529 534537 539542 545549 550553 554558 559560 564570 571573 574575 576579 580582 595598 609610 612613 615618 627631 633 637641 643644 646662 663672 674675 677 678690 the previously issued regulation dated 13092019 6146572440pr Tasks of this audit are the adoption of those provided for by the legislation of the Russian Federation measures to prevent and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts The purpose of this audit is to comply with the instructions of state control and supervision bodies


# 001903994901
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration: 5
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the 13102019 deadline for the fulfillment of points 1935 3738 6566 6870 7980 8387 8892 9496 100102 103 181 206 209 218 222 224 227 231 235 237 242 245 252 254 259 262269 271 280 289292 293296 297301 441458 459 462465 466476 477489 490500 516517 527 528 530533 538 543544 561563 583586 587594 599608 611 614 619626 632 634636 642 645 673 676 previously issued regulation No. 13092019 6146572440PR, the objectives of this audit are to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are detected and to bring to justice persons who have committed violations of Federal requirements laws and other regulatory legal acts The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001904149446
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902990094
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902990118
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment by the branch of JSC Yantarenergo "Urban Electric Networks" of paragraphs 1316 350 373 395 435 492 558561 of the previously issued Rostechnadzor regulation dated June 14, 2019 235rpP2019 The task of this audit is to establish the facts of non-fulfillment by the branch of JSC Yantarenergo "Urban Electric Networks" of the above-mentioned paragraphs of the Rostechnadzor regulation dated June 14, 2019 235RPP2019THE subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001902990056
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 001903465951
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001904000821
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 001903683902
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902728792
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-05-17, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the order


# 001902718565
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718529
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718354
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718134
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902504888
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-01-24, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulation 810513bnA02072018 of 28092018, the deadline for which expired on 28/122018, the objectives of this audit are to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements if they are detected and to bring to justice responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts The subject of this audit is to note the necessary fulfillment of the instructions of the state control and supervision bodies


# 001802326823
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-11-15, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: verification of the execution of JSC Yantarenergo of the OGKiN regulations in the Kaliningrad Region of the Federal State Standard Service 526c dated 17072018 with a deadline of 17102018


# 001800777523
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated August 01, 2018 329 "On monitoring the progress of preparation of electric power and Heat supply facilities for operation in the autumn-winter period 20182019" issued on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation DN Kozak dated June 19, 2018 DKP94467


# 00170803029348
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-29, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Assessment of product compliance with the requirements of technical regulations and state standards for the quality of electric energy GOST 321442013


# 00170803029165
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-29, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Assessment of the conformity of products with the quality of electric energy to the requirements of technical regulations and state standards GOST 321442013


# 00170802695755
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-11-01, duration:
Authority: SeveroZapadnoe Upravlenie Gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance p1 p2 with the Requirements of CLO162410 from 07092016


# 00170802708614
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection:


# 00170802296082
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-07, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of product compliance with the requirements of technical regulations and state standards


# 00170801929248
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-08, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of technical regulations, norms and rules of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with devices and accounting for used energy resources and other normative legal acts during the construction of the capital construction facility "Scheme of power supply to the electric networks of JSC Yantarenergo of the Pregolskaya TPP Construction of 330 kV overhead line O1 Central Sovetsk330 L415 inv 5321358 for the Pregolskaya TPP construction of the 330 kV Pregolskaya TPP Severnaya 330 with the construction of cells for connection to the 330 kV ORU of the PS Severnaya 330" Kaliningrad region in accordance with the Program of inspections of the organization of construction works for 2017-2018 approved by the deputy head of the Central Department of Rostechnadzor AN Gorlov 14032017


# 00170701314398
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-03-06, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kaliningradskoi oblasti
Purpose of inspection: this audit is conducted in order to determine the fact of elimination by January 15, 2017 of violations of land legislation established by the order of September 7, 2016 in the case 4352016the objectives of this audit are to study and assess the compliance of the subject of the audit on the use of land plots with the requirements of land legislation


# 00160601695705
Unscheduled inspection
Start date: 2016-07-04, end date: 2016-07-15, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period 2016-2017


# 00150601410929
Unscheduled inspection
Start date: 2015-11-17, end date: 2015-12-14, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the information contained in the documents of a legal entity establishing its rights and obligations and documents used in the implementation of activities and related to the fulfillment and compliance with mandatory reliability and safety requirements during operation of a 250 kVA power transformer of the KTP374 electric grid facility at Kaliningrad Portovaya Street 43 in connection with the receipt by the Central Department of Rostechnadzor of the appeal of LLC Askar 0815296 dated 29102015 with information about a faulty power transformer installed in KTP374 at Kaliningrad Portovaya Street 34, which is on the balance sheet of JSC Yantarenergo branch of HPP, which may lead to a threat of harm to the life and health of citizens


# 00150601265154
Unscheduled inspection
Start date: 2015-10-06, end date: 2015-10-09, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the fulfillment of the prescription


# 00150601253974
Unscheduled inspection
Start date: 2015-09-28, end date: 2015-10-07, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: report on the elimination of inconsistencies based on the results of the PC


# 00150600094689
Unscheduled inspection
Start date: 2015-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 982100327225
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 20
Authority: Severo-Zapadnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: implementation of the previously issued regulation No. 8/437 dated 06/17/2021.


# 782100259959
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 5
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to: monitoring the measures taken by a legal entity (individual entrepreneur) to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulations dated 02/26/2021 No. 47-628-393/PR. The objectives of this audit are: to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements (if they are detected) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies


# 782100199382
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 6
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: monitor the measures taken by a legal entity (individual entrepreneur) to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the order dated 08/28/2019 No. 61-4618-2245 on 30.06.2020/pr; The objectives of this audit are: to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements (if they are detected) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies


# 782100196272
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 5
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: monitor the measures taken by a legal entity (individual entrepreneur) to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the regulation dated 01/21/2020 No. 47-223-43/pr; The objectives of this audit are: to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements (if they are detected) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies


# 782100196254
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 5
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: monitor the measures taken by a legal entity (individual entrepreneur) to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the regulation dated 03/13/2020 No. 47-1700-693/PR; The objectives of this audit are: to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements (if they are detected) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies


# 782100081007
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-22, duration: 4
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to: monitoring the measures taken by a legal entity (individual entrepreneur) to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the order dated 03/31/2020 No. 47-1445-886 on 30.06.2020/pr; The objectives of this audit are: to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements (if they are detected) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies


# 772100105810
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: 10
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the implementation by the branch of JSC Yantarenergo – Eastern Electric Networks of paragraphs 1-6, 12, 13 of the previously issued Rostechnadzor regulation No. 234-rp/P-2019 dated June 14, 2019. The purpose of this audit is to establish the facts of the fulfillment (non–fulfillment) by the branch of JSC Yantarenergo - Eastern Electric Networks of the above-mentioned points of Rostechnadzor regulation No. 234-rp/P-2019 dated June 14, 2019. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 772100106662
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: 10
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by the branch of JSC Yantarenergo – Energoremont 5, 11-16, 25-33, 38-40, 49, 74, 81, 83, 87, 99 previously issued Rostechnadzor Regulation No. 233-rp/P-2019 dated June 14, 2019. The purpose of this audit is to establish the facts of the fulfillment (non–fulfillment) by the branch of JSC Yantarenergo - Energoremont of the above-mentioned points of Rostechnadzor regulation No. 233-rp/P-2019 dated June 14, 2019. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies


# 772100106593
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: 10
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by the branch of JSC Yantarenergo – Western Electric Networks 1-10, 16-18, 20, 28, 29, 34, 36-38, 40, 42, 47, 51, 52, 54, 57, 64-66, 70, 74, 88, 89, 94, 107, 111-113, 118, 124, 128, 131-133, 148, 151, 158, 173, 174, 190-192, 195, 199, 200, 234-236, 240, 251, 253, 255, 256, 258, 259, 264, 265, 267-269, 271, 275, 276, 280, 282, 302-305, 311-313, 320, 333, 341, 344-346, 357-359, 387-389, 403-409, 415, 420-422, 424, 425, 431-434, 438, 443, 445-447, 455, 461, 468, 478, 480-482, 493, 499, 506, 516, 518-520, 524, 525, 527-532, 542, 552, 554, 556, 557, 560-562, 566, 571, 572, 574, 579, 580, 584, 589, 590, 595, 604, 605, 608, 613, 614, 619, 624, 625 previously issued Rostechnadzor Regulation No. 232 dated June 14, 2019-rp/P-2019. The purpose of this audit is to establish the facts of fulfillment (non–fulfillment) by the branch of JSC Yantarenergo - Western Electric Networks of the above-mentioned points of Rostechnadzor regulation No. 232-rp/P-2019 dated June 14, 2019. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 772100120100
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by JSC Yantarenergo 5, 8, 14-17, 19-21, 25, 27, 29-132, 156, 162, 168, 169, 174-180, 184-200 previously issued Rostechnadzor Regulation No. 254-rp/P-2019 dated June 14, 2019. The purpose of this audit is to establish the facts of the fulfillment (non-fulfillment) of JSC Yantarenergo of the above points of Rostechnadzor regulation No. 254-rp/P-2019 dated June 14, 2019. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies


# 772100106391
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: 10
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by the branch of JSC Yantarenergo – Urban Electric Networks 1-12, 17-349, 351-372, 374-394, 396-434, 436-491, 493-557 previously issued Rostechnadzor Regulation No. 235-rp/P-2019 dated June 14, 2019. The purpose of this audit is to establish the facts of the fulfillment (non–fulfillment) by the branch of JSC Yantarenergo - Urban Electric Networks of the above-mentioned points of Rostechnadzor regulation No. 235-rp/P-2019 dated June 14, 2019. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 392000072828
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-04-01, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the regulation on the elimination of violations of mandatory fire safety requirements dated 01/31/2020 No. 17/1/1, the deadline for which expired on 10/01/2020; The objectives of this audit are: identification, suppression and prevention of possible violations of fire safety requirements; systematic monitoring of compliance with fire safety requirements. The subject of this audit is: the fulfillment of the prescription for the elimination of violations of mandatory fire safety requirements.


# 392000072858
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-04-01, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the regulation on the elimination of violations of mandatory fire safety requirements dated 01/31/2020 No. 18/1/1, the deadline for which expired on 03/01/2021; The objectives of this audit are: identification, suppression and prevention of possible violations of fire safety requirements; systematic monitoring of compliance with fire safety requirements. The subject of this audit is: the fulfillment of the prescription for the elimination of violations of mandatory fire safety requirements.


# 782100002860
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 002004389725
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-31, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the information contained in the documents of a legal entity establishing its rights and obligations and documents used in the implementation of activities and related to the fulfillment and observance of mandatory requirements for reliability and safety in the operation of electric power facilities, namely violations of the established procedure for commissioning and connecting the electrical installation of the object "Residential building with built-in administrative premises and underground parking on Ulgalitsky in Kaliningrad" as well as the supply of voltage to the electrical installations of the object "Residential building with built-in administrative premises and underground parking on Ulgalitsky in Kaliningrad" without obtaining permission from the state energy supervision authorities without notification of readiness for commissioning sent by the consumer applicant to the state energy supervision authorities in a way that allows you to set the date of sending and receiving notification of readiness for commissioning operation of the facility


# 002004384510
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-13, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is carried out to control the information contained in the documents defining the rights and obligations and instruments used when performing activities associated with the execution and compliance with the mandatory safety requirements in the implementation of the actions which may violate the safe operation of power grid facilities in connection with the receipt in the Northwestern Department of Rostekhnadzor, the application of the citizen gr Sukhareva AL BX 2482128 from 19022020 on the issue of violation of JSC Yantarenergo requirements in connection with the presence in the buffer zone of the electric grid facilities of the transformer substation TP 26106 VL 1526 2ВЛ 04кВ from TP KL 26106 04кВ from TP 26106 at Kaliningrad oblast Guryevsky district POS Cornflower close proximity of the apartment house 37 ul Kaliningrad cabins trailer which creates prerequisites threats of harm to life, health of citizens, property of individuals and legal entities Objectives of this review are the adoption laws of the Russian Federation measures to prevent and remedy violations of the mandatory requirements in the case of their detection and prosecution of persons who committed violations of Federal laws and other normative legal acts, the Subject of this review is the information contained in the documents of the legal entity the individual entrepreneur establishes their organizational and legal form, the rights and obligations of the documents used in the implementation of their activities and associated with the performance of their mandatory requirements of the municipal legal acts of the implementation of the requirements and regulations of government authorities oversight bodies, municipal control


# 392004193070
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-01-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the instruction to eliminate violations of mandatory fire safety requirements dated 01112018 9811, the deadline for which expired on 21102019, the objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements. The subject of this audit is the fulfillment of the instruction to eliminate violations of mandatory fire safety requirements


# 002004238884
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-22, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of 30122019 of the deadline for the fulfillment of paragraphs 15 1316 of the regulation dated 28082019 6146182245pr The tasks of this audit are the adoption of measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice those who committed violations requirements of Federal laws and other regulatory legal acts


# 392004193137
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the instruction to eliminate violations of mandatory fire safety requirements dated 01112018 9711, the deadline for which expired on 21102019, the objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements. The purpose of this audit is to comply with the instruction to eliminate violations of mandatory fire safety requirements


# 002004245330
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-01-21, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the 24122019 deadline for the execution of the order dated 24092019 6146862565pr The objectives of this audit are to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of Federal requirements laws and other regulatory legal acts the subject of this audit is to note the necessary fulfillment of the instructions of the state control and supervision bodies


# 001904154537
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-23, duration: 6
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the 13122019 deadline for the fulfillment of points 111 1218 36 3964 67 7178 81 82 93 9799 104180 182198 199205 207 208 210217 219221 223 225 226 228230 232234 236 238241 243 244 246251 253 255258 260 261 270 272279 281288 302311 312326 327330 331335 336349 350367 368 369 370377 378386 387395 396398 399407 408413 414428 429440 460461 501515 518 526 529 534537 539542 545549 550553 554558 559560 564570 571573 574575 576579 580582 595598 609610 612613 615618 627631 633 637641 643644 646662 663672 674675 677 678690 the previously issued regulation dated 13092019 6146572440pr Tasks of this audit are the adoption of those provided for by the legislation of the Russian Federation measures to prevent and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts The purpose of this audit is to comply with the instructions of state control and supervision bodies


# 391904016028
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 391904016105
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out activities in accordance with the inspection program 01SN122019 the objectives of this inspection are to verify the compliance of the work performed with the requirements of the design documentation, including energy efficiency requirements and the requirements of equipping the facility with metering devices for energy resources used


# 391904016080
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out activities in accordance with the inspection program 01SN122019 the objectives of this inspection are to verify the compliance of the work performed with the requirements of the design documentation, including energy efficiency requirements and the requirements of equipping the facility with metering devices for energy resources used


# 391904016144
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection:


# 391904016058
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 391904015996
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out activities in accordance with the inspection program 01SN122019 the objectives of this inspection are to verify the compliance of the work performed with the requirements of the design documentation, including energy efficiency requirements and the requirements of equipping the facility with metering devices for energy resources used


# 391904007467
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out activities in accordance with the inspection program 01SN122019 the objectives of this inspection are to verify the compliance of the work performed with the requirements of the design documentation, including energy efficiency requirements and the requirements of equipping the facility with metering devices for energy resources used


# 001903994901
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration: 5
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the 13102019 deadline for the fulfillment of points 1935 3738 6566 6870 7980 8387 8892 9496 100102 103 181 206 209 218 222 224 227 231 235 237 242 245 252 254 259 262269 271 280 289292 293296 297301 441458 459 462465 466476 477489 490500 516517 527 528 530533 538 543544 561563 583586 587594 599608 611 614 619626 632 634636 642 645 673 676 previously issued regulation No. 13092019 6146572440PR, the objectives of this audit are to take measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are detected and to bring to justice persons who have committed violations of Federal requirements laws and other regulatory legal acts The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 391903858277
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-11-01, duration:
Authority: SeveroZapadnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: determination of the possibility for the licensor's applicant to fulfill the licensing requirements for assessing the compliance of the information in the application of the licensor's applicant and in the documents attached to it with the provisions of parts 1 and 3 of Article 13 for the application for licensure and 18 for the application for renewal of the license of the Federal Law of 040511 99 FZ "On licensing of certain types of activities" as well as information about the licensor's applicant contained in a single the State register of individual entrepreneurs in the unified State register of legal entities


# 001904149446
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-13, duration: 10
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the preparation of electric power facilities for operation in complex technological modes in accordance with the order of Rostechnadzor "On monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period 2019 2020" dated 04072019 262 issued in accordance with the instruction of Deputy Chairman of the Government of the Russian Federation DN Kozak dated 18062019 DKP94982 bx 01170778 dated 05072019 tasks of this inspection these are the implementation of control over the measures taken by a legal entity, an individual entrepreneur, to comply with heating grid and heat supply organizations with safety requirements in the field of heat supply that affect the fulfillment of mandatory requirements for readiness for the heating period, the adoption of measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory legal acts, the subject of this audit is compliance with a set of mandatory requirements in the course of carrying out activities for the operation of electric and thermal installations and energy facilities


# 001903870438
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-24, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the information contained in the documents of a legal entity establishing its rights and obligations and documents used in the implementation of activities and related to the fulfillment and compliance with mandatory requirements for reliability and safety in the operation of an electric grid facility VL15kV L 1547 otpaika to TP 474 support spans 8910 JSC "Yantarenergo" at the address Kaliningrad region Guryevsky district Maloe Isakovo territory of the SNT "Vasilek" in connection with the receipt to the Northwestern Department of Rostechnadzor of the appeal of citizen Agaev Pavel Nadirovich vh 27Kd76776 dated 23072019 on the issue of violation of legal requirements when placing an individual two-storey residential building at the address Kaliningrad, Bolshaya Okruzhnaya territory, SET "Vasilek", Polev Street d2 cadastral number of the land plot 3961561322036121 in the security zone of an electric grid facility farms of JSC Yantarenergo VL15kV L 1547 soldering to TP 474 spans of supports 8910 without the approval of the network organization, which may lead to the threat of harm to the life and health of citizens, property of individuals and legal entities, the objectives of this audit are the adoption of measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements in case of their detection and to bring to justice those who committed violations of the requirements of Federal laws and other regulatory legal acts


# 001902990094
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment by the branch of JSC Yantarenergo "Eastern Electric Networks" of paragraphs 711-14549 of the previously issued Rostechnadzor regulation dated June 14, 2019 234rpP2019 The task of this audit is to establish the facts of non-fulfillment by the branch of JSC Yantarenergo "Eastern Electric Networks" of the above-mentioned paragraphs of the Rostechnadzor regulation dated June 14, 2019 234RPP2019 The subject of this audit is the fulfillment regulations of the state control and supervision bodies


# 001902990147
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment of the points by the branch of JSC Yantarenergo "Western Electric Networks" 1115 19 2127 3033 35 39 41 4346 4850 53 55 56 5863 6769 7173 7587 9093 95106 108110 114117 119123 125127 129 130 134147 149 150 152157 159172 175189 193 194 196198 201233 237239 241250 252 254 257 260263 266 270 272274 277279 281 283301 306310 314319 321332 334340 342 343 347356 360386 390402 410414 416419 423 426430 435437 439442 444 448454 456460 462467 469477 479 483492 494498 500505 507515 517 521523 526 533541 543551 553 555 558 559 563565 567570 573 575578 581583 585588 591594 596603 606 607 609612 615618 620623 626633 previously issued Rostechnadzor regulation dated June 14, 2019 232rpP2019 The purpose of this audit is to establish the facts of non-compliance by the branch of JSC Yantarenergo "Western Electric Networks" with the above-mentioned points of Rostechnadzor regulation dated June 14, 2019 232RPP2019THE subject of this audit is to comply with the instructions of the state control and supervision bodies


# 001902990118
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment by the branch of JSC Yantarenergo "Urban Electric Networks" of paragraphs 1316 350 373 395 435 492 558561 of the previously issued Rostechnadzor regulation dated June 14, 2019 235rpP2019 The task of this audit is to establish the facts of non-fulfillment by the branch of JSC Yantarenergo "Urban Electric Networks" of the above-mentioned paragraphs of the Rostechnadzor regulation dated June 14, 2019 235RPP2019THE subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001902990002
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment of the points by JSC Yantarenergo 14 6 7 913 18 2224 26 28 133155 157161 163167 170173 181183 previously issued Rostechnadzor regulation dated June 14, 2019 254rpP2019 The purpose of this audit is to establish the facts of non-fulfillment by JSC Yantarenergo of the above points of Rostechnadzor regulation dated June 14, 2019 254RPP2019THE subject of this audit is the fulfillment of the regulations state control and supervision bodies


# 001902990056
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment of the points by the branch of JSC Yantarenergo Energoremont 14 610 1724 3437 4148 5073 7580 82 8486 8898 100131 The previously issued Rostechnadzor regulation dated June 14, 2019 233rpP2019 The task of this audit is to establish the facts of non-compliance by the branch of JSC Yantarenergo Energoremont with the above-mentioned points of the Rostechnadzor regulation dated June 14, 2019 233RPP2019THE subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001903465951
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration: 101
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the order dated 14062019 235rpP2019, the deadline for which expired on 14082019


# 001904000821
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-28, duration: 7
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of 01082019 of the deadline for the execution of regulation 612154955PR of 18042019. The objectives of this audit are to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of Federal requirements The purpose of this audit is to monitor compliance with the instructions of the state control and supervision bodies


# 391902923588
Unscheduled inspection
Start date: 2019-08-07, end date: —, duration:
Authority:
Purpose of inspection:


# 001903683902
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-06-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulation 6127671204PR of 17052018, the deadline for the execution of which expired on 17062019 the objectives of this audit are to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements if they are detected and to bring to justice the responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001902728792
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-05-17, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the order


# 001902722471
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718565
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718529
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718354
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric Power Industry Entities, heat Supply organizations, heating grid organizations and Consumers of electric Energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 the task of this inspection is to establish the fact of fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902718134
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 "On conducting inspections of compliance with mandatory requirements by subjects of the electric power industry, heat supply organizations, heating grid organizations and consumers of electric energy in 2019" issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274THE task of this inspection is to establish the fact fulfillment of non-fulfillment of legal requirements in the established field of activity The subject of this audit is compliance with mandatory requirements


# 001902702966
Unscheduled inspection
Start date: 2019-04-05, end date: 2019-04-18, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the 28032019 deadline for the execution of the order dated 24012019 6121569PR the objectives of this audit are to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of requirements Federal laws and other regulatory legal acts The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 391902643785
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-05-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Kaliningradskoi oblasti
Purpose of inspection: Verification of compliance with labor legislation


# 391902582821
Unscheduled inspection
Start date: 2019-03-18, end date: —, duration:
Authority:
Purpose of inspection:


# 001902613282
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state energy supervision over compliance in the process of carrying out activities for the operation of power plants and energy facilities with a set of mandatory safety requirements in the field of electric power and or safety requirements in the field of heat supply control of information contained in documents of a legal entity establishing its rights and obligations and documents used in the implementation of activities and related to the execution and compliance with mandatory reliability requirements and safety during the operation of electric power facilities in connection with the receipt by the Northwestern Department of Rostechnadzor of Notifications on readiness for commissioning of facilities "Reconstruction of PS 15 kV PS B20 p Lesnoye Kurshskaya spit Zelenograd district of the Kaliningrad region" vhKd13591 from 12022019 "Construction of RTPB 15 kV10 kV PS1 B75 p Rybachy Kurshskaya spit Zelenograd district of the Kaliningrad region" vhKd10777 from 05022019 "Construction of RTPB 10 kV PS3 B76 Parking height Efa Curonian spit Zelenograd district of Kaliningrad region" vhKd10786 from 05022019 "Construction of RTPB 10 kV PS2 B77 p Morskoye Curonian spit Zelenograd district of Kaliningrad region" vhKd10781 from 05022019


# 39190803383015
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-19, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the appeal of a tenant living in an apartment building 24A on Alley of the Bold Street in Kaliningrad on the installation of a general household electricity metering device vh 4848vh from 27022019 Consideration of the applicant's appeal living at the above address Compliance with the instructions of state control bodies supervision of municipal control bodies


# 39190803341403
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-03-05, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of compliance with Federal Law No. 23112009 261 FZ On Energy Saving and Energy Efficiency Improvement and on Amendments to Certain Legislative Acts of the Russian Federation regarding the equipment of an apartment building 2a2b on Knizhnaya Street in Kaliningrad with a common household electricity metering device 957vx dated 16012019 Consideration of the applicant's application residing at the above address Compliance with mandatory requirements for ensuring energy efficiency of apartment buildings and residential buildings, their equipment with metering devices for the energy resources used and the operation of such devices


# 39190803323177
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-04, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: At the request of the applicant residing at Bagrationovsk, Ishimskaya str., 1 A kv bx 24069xx dated 24122018, Consideration of the applicant's appeal on the issue of improper provision of utility services for electricity supply at the above address Compliance with mandatory requirements for the provision of utilities to owners and users of premises in apartment buildings and residential buildings


# 39190803313197
Unscheduled inspection
Start date: 2019-01-11, end date: 2019-01-25, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of compliance with Federal Law No. 23112009 261 FZ On Energy Saving and Energy Efficiency Improvement and on Amendments to Certain Legislative Acts of the Russian Federation regarding the equipment of an apartment building 4652 Komsomolskaya Street in Kaliningrad with a common household electricity metering device 5317o dated 13122018 Consideration of the applicant's application Compliance with a set of mandatory requirements and requirements established by municipal legal acts


# 001902504888
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-01-24, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulation 810513bnA02072018 of 28092018, the deadline for which expired on 28/122018, the objectives of this audit are to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements if they are detected and to bring to justice responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts The subject of this audit is to note the necessary fulfillment of the instructions of the state control and supervision bodies


# 39190803317759
Unscheduled inspection
Start date: 2019-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 001802214299
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-29, duration:
Authority: SeveroZapadnoe Upravlenie Gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance with the Requirements of CLO172108 of 12102017


# 39180803270987
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-27, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the appeal of residents living in an apartment building 99 on Ugromova Street in Kaliningrad 17137xx dated 04102018 on the issue of the execution of Federal Law No. 23112009 261 FZ On Energy Conservation and Energy Efficiency Improvement and on amendments to certain legislative acts of the Russian Federation regarding the equipment of an apartment building with a common household electricity metering device commissioning Verification of the arguments of the appeal of residents Compliance a set of mandatory requirements and requirements established by municipal legal acts


# 39180803291158
Unscheduled inspection
Start date: 2018-11-29, end date: —, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection:


# 391802048842
Unscheduled inspection
Start date: 2018-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 001802326823
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-11-15, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: verification of the execution of JSC Yantarenergo of the OGKiN regulations in the Kaliningrad Region of the Federal State Standard Service 526c dated 17072018 with a deadline of 17102018


# 39180803229775
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection:


# 39180803229975
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-26, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of compliance with Federal Law No. 23112009 261F3 On Energy Saving and Energy Efficiency Improvement and on Amendments to Certain Legislative Acts of the Russian Federation regarding the equipment of an apartment building 1012 on Gen Butkov Street in Kaliningrad with a general household electricity metering device 15431vx from 04092018 Consideration of the application of the applicant living at the above address Compliance with mandatory requirements for ensuring energy efficiency of apartment buildings houses and residential buildings are equipped with metering devices for the energy resources used and the operation of such devices


# 001800777523
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated August 01, 2018 329 "On monitoring the progress of preparation of electric power and Heat supply facilities for operation in the autumn-winter period 20182019" issued on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation DN Kozak dated June 19, 2018 DKP94467


# 39180803199482
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-24, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the applicant's appeal residing at Kaliningrad Bagration str. d 9 kv vh 12041vh dated 13072018 on the issue of not taking measures to install a general household electricity metering device to comply with legislation on energy conservation Consideration of the applicant's appeal residing at the above address Compliance with mandatory requirements for ensuring energy efficiency of apartment buildings and residential buildings their equipment with metering devices for used energy resources and the operation of such devices


# 39180803187418
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-08-14, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the applicant's appeal residing at the address Kaliningrad Lesoparkovaya street d 38 vx 10580xx from 21062018 on the issue of not taking measures to install a common apartment electricity metering device hereinafter referred to as the IPU for the implementation of legislation on energy conservation Consideration of the applicant's appeal residing at the above address Compliance with mandatory requirements for ensuring energy efficiency of apartment buildings and residential buildings their equipment with metering devices used energy resources and operation of such devices


# 39180803180931
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-27, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the appeal of the director of ZHEU18 vx 9903vx LLC dated 13062018 on the issue of commissioning of household electricity metering devices Consideration of the applicant's appeal living at the above address Compliance with mandatory requirements for ensuring energy efficiency of apartment buildings and residential buildings, their equipment with metering devices for used energy resources and operation of such devices


# 39180803167139
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-07-03, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: At the request of a resident of vh2314o from 08062018 living at gKaliningrad Moskovsky Prospekt d 125 kv on the issue of installing a general household electricity metering device Consideration of the applicant's application living at the above address Compliance with mandatory requirements for ensuring energy efficiency of apartment buildings and residential buildings, their equipment with metering devices for used energy resources and operation of such devices


# 001802105823
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-07-17, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Checking the consumer's complaint about the low quality of electrical energy


# 39180803178844
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-05-31, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the appeal of a citizen of vx 7666xx from 07052018 on the issue of not providing the consumer with utilities of adequate quality electricity supply Consideration of the applicant's appeal living at the above address Compliance with mandatory requirements for the provision of utilities to owners and users of premises in apartment buildings and residential buildings


# 001800471430
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-06-09, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the licensee's compliance with licensing requirements when conducting an industrial safety examination based on the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 28, 2018 86 The purpose of this audit is to verify the licensee's compliance with mandatory requirements The subject of this audit is compliance with mandatory requirements


# 001800449485
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-05-18, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Verification of the execution of previously issued regulation 876c dated 21122018


# 39180803123845
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-05-11, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the appeal of residents living in an apartment building 2A on Lomonosov Street in Sovetsk 2316xx from 14022018 on the issue of the execution of Federal Law No. 23112009 261 FZ On Energy Conservation and Energy Efficiency Improvement and on amendments to certain legislative acts of the Russian Federation regarding the equipment of an apartment building with a communal thermal energy metering device Verification of the arguments of the residents at the above address Compliance with mandatory requirements for ensuring the energy efficiency of apartment buildings and residential buildings, their equipment with metering devices for used energy resources and the operation of such devices


# 391800300922
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-15, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: in order to verify the fulfillment of the prescription for the elimination of violations of mandatory fire safety requirements dated 14122017 10811, the deadline for which expired on 01042018


# 39180803114638
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-04, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: At the request of the applicant residing at the address Kaliningrad region Guryevsky district Pnovgorodskoye d 1 vx3963vx from 14032018 Consideration of the applicant's appeal on the issue of non-compliance of the voltage of the electric network with the requirements of GOST 321442013 Electric energyconompatibility of technical means electromagnetic Standards of quality of electric energy in general purpose power supply systems at the above address Compliance with other mandatory requirements for the use and safety of housing stock regardless of its forms of ownership established by housing legislation and legislation on energy conservation and energy efficiency improvement


# 001800184011
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-02, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: criteria for accreditation of IL


# 391800189321
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection:


# 391800555905
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-25, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the regulation on the elimination of violations of fire safety requirements dated 03102016 123183, the deadline for which expires on 02102017


# 391800555880
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-25, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the regulation on the elimination of violations of fire safety requirements dated 03102016 122182, the deadline for which expires on 02102017


# 391800555733
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-25, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Kaliningradskoi oblasti
Purpose of inspection: verification of compliance with the regulation on the elimination of violations of fire safety requirements dated 03102016 119184, the deadline for which expires on 02102017


# 00170803029348
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-29, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Assessment of product compliance with the requirements of technical regulations and state standards for the quality of electric energy GOST 321442013


# 00170803029165
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-29, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Assessment of the conformity of products with the quality of electric energy to the requirements of technical regulations and state standards GOST 321442013


# 39170802856995
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-12-03, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: The purpose is to verify the arguments of the applicants living in apartment building 2 on Perkoltsevy in Gneman on the issue of the absence of a communal electricity metering device and the absence of lighting in public areas 9339p from 05102017 Tasks consideration of the applicant's appeal living at the above address, Subject to verification, compliance with mandatory requirements for ensuring energy efficiency of apartment buildings and residential buildings, their equipment with metering devices for used energy resources and operation such devices


# 00170802695755
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-11-01, duration:
Authority: SeveroZapadnoe Upravlenie Gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance p1 p2 with the Requirements of CLO162410 from 07092016


# 39170802510206
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-10-27, duration:
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po Kaliningradskoi oblasti
Purpose of inspection: verification of the execution of the regulation from 15032017 21AMZ2017


# 00170802708614
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-10-04, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of compliance of electric energy products with the requirements of technical regulations and state standards


# 39170802491161
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-09-28, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of arguments on the appeal of citizens of vh 5318r from 31072017 on the procedure for limiting electricity in kV of an apartment building 71 Kalina Street in Kaliningrad in 2017 consideration of the applicant's appeal living at the specified address Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 39170701874237
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-17, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of arguments on the appeal of citizens of vh 4775r from 21072017 on the procedure for limiting electricity consumption in kV of an apartment building hereinafter MKD 2 Sotdatskaya St. in Primorsk in July 2017 consideration of the applicant's appeal residing at the specified address Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 39170701848667
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection:


# 00170802296082
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-07, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of product compliance with the requirements of technical regulations and state standards


# 39170701797235
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection:


# 39170701839178
Unscheduled inspection
Start date: 2017-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 00170801929248
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-08, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of technical regulations, norms and rules of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with devices and accounting for used energy resources and other normative legal acts during the construction of the capital construction facility "Scheme of power supply to the electric networks of JSC Yantarenergo of the Pregolskaya TPP Construction of 330 kV overhead line O1 Central Sovetsk330 L415 inv 5321358 for the Pregolskaya TPP construction of the 330 kV Pregolskaya TPP Severnaya 330 with the construction of cells for connection to the 330 kV ORU of the PS Severnaya 330" Kaliningrad region in accordance with the Program of inspections of the organization of construction works for 2017-2018 approved by the deputy head of the Central Department of Rostechnadzor AN Gorlov 14032017


# 39170701836960
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-08-18, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Verification of the arguments of the applicant's appeal residing in the KV apartment building 13 Ulbauman Street in Gsovetsk on the issue of failure of the general household electricity metering device vh174659 from 04072017 Consideration of the applicant's appeal Compliance with other mandatory requirements for the use and preservation of housing stock regardless of its ownership forms established by housing legislation and legislation on energy conservation and energy efficiency improvement


# 00170701752663
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-22, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: verification of consumer complaints about the low quality of electric energy in the village of Livenskoye of the Red Banner district of the Kaliningrad region


# 00170701314398
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-03-06, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kaliningradskoi oblasti
Purpose of inspection: this audit is conducted in order to determine the fact of elimination by January 15, 2017 of violations of land legislation established by the order of September 7, 2016 in the case 4352016the objectives of this audit are to study and assess the compliance of the subject of the audit on the use of land plots with the requirements of land legislation


# 39160701250260
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-15, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Purpose verification of the arguments of the appeal of the tenant living at Bagrationovsk st. Central d 1 on the issue of non-fulfillment by JSC Yantarenergo of its obligation regarding the commissioning of the ODPU Electric power task verification of the arguments of the appeal of the tenant living at Bagrationovsk st. Central d 1 to ensure compliance with mandatory requirements established by regulatory legal acts of licensing requirements for violation of consumer rights


# 39160701267559
Unscheduled inspection
Start date: 2016-12-22, end date: —, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection:


# 39160701121370
Unscheduled inspection
Start date: 2016-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 00160700640370
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-28, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control execution of the prescription


# 39160700830012
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-26, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Objectives verification of the validity of the appeal of a resident living in KV at Kurortny ave d3 in Gzelenogradsk received 06092016 vh H5276 containing information about the failure to take measures to replace and install in MKD 3 at Kurortny Ave in Gzelenogradsk a general household electricity metering device not complying with legislation on energy saving tasks the legality of JSC Yantarenergo's failure to take measures to replace and install in MKD 3 at prt Kurortny in Gzelenogradsk of the general household electricity metering device non-compliance with legislation on energy saving, compliance with mandatory requirements established by normative legal acts compliance with licensing requirements carrying out measures to identify the fact of violation of consumer rights


# 39160601762665
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-02, duration:
Authority: Ministerstvo regionalnogo kontrolya nadzora Kaliningradskoi oblasti
Purpose of inspection: Objectives verification of the arguments of the appeal of the tenant living at the address Pravdinsky rn posDomnovo d1 on the legality of the power outage verification of the arguments of the appeal of the tenant living at the address Pravdinsky rn posDomnovo D1 Subject to compliance with mandatory requirements established by normative legal acts carrying out measures to identify the fact of violation of consumer rights


# 00160601695705
Unscheduled inspection
Start date: 2016-07-04, end date: 2016-07-15, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period 2016-2017


# 39160601735393
Unscheduled inspection
Start date: 2016-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 39160601721314
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-22, duration:
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po Kaliningradskoi oblasti
Purpose of inspection: Verification of the execution of the prescription


# 39160601721302
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-22, duration:
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po Kaliningradskoi oblasti
Purpose of inspection: Verification of the execution of the prescription


# 00160601533726
Unscheduled inspection
Start date: 2016-03-17, end date: 2016-03-23, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring compliance with the requirements of the previously issued instruction on the elimination of identified violations dated 14122015 810878vnP02082015, the deadline for which expired 14032016


# 00150601410929
Unscheduled inspection
Start date: 2015-11-17, end date: 2015-12-14, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the information contained in the documents of a legal entity establishing its rights and obligations and documents used in the implementation of activities and related to the fulfillment and compliance with mandatory reliability and safety requirements during operation of a 250 kVA power transformer of the KTP374 electric grid facility at Kaliningrad Portovaya Street 43 in connection with the receipt by the Central Department of Rostechnadzor of the appeal of LLC Askar 0815296 dated 29102015 with information about a faulty power transformer installed in KTP374 at Kaliningrad Portovaya Street 34, which is on the balance sheet of JSC Yantarenergo branch of HPP, which may lead to a threat of harm to the life and health of citizens


# 00150601265154
Unscheduled inspection
Start date: 2015-10-06, end date: 2015-10-09, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the fulfillment of the prescription


# 00150601253974
Unscheduled inspection
Start date: 2015-09-28, end date: 2015-10-07, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: report on the elimination of inconsistencies based on the results of the PC


# 00150600094689
Unscheduled inspection
Start date: 2015-07-31, end date: 2015-08-06, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the activities of legal entities to comply with mandatory safety requirements for electrical installations and networks when monitoring the progress of preparation for the 20152016


Information about inspections