# 00170802821523
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 18092017 501G3327B22
# 00170802821520
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 18092017 501G3327B22
# 00170801963974
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-18, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 23052017 g 249G3327B22
# 772105322888
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004448373
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004321830
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004162918
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-01-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004239691
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904150423
Unscheduled inspection
Start date: 2019-12-25, end date: 2020-01-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904051387
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771904074553
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 771903993276
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-11-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904019787
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 771903947373
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903821607
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903878031
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-11-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771903691477
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration: —
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection:
# 771903645962
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903643155
Unscheduled inspection
Start date: 2019-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803481571
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803470177
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803465614
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803434653
Unscheduled inspection
Start date: 2019-06-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803418620
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803419490
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803418847
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803408828
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources the presence of a construction permit
# 77190803382951
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803389803
Unscheduled inspection
Start date: 2019-04-05, end date: 2019-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803405530
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-05-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803365204
Unscheduled inspection
Start date: 2019-03-07, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803330940
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803313346
Unscheduled inspection
Start date: 2019-01-11, end date: 2019-02-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803318165
Unscheduled inspection
Start date: 2019-01-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803294350
Unscheduled inspection
Start date: 2018-12-06, end date: 2018-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803258136
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803223123
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803199042
Unscheduled inspection
Start date: 2018-08-10, end date: 2018-08-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803206690
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-09-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803208684
Unscheduled inspection
Start date: 2018-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803172744
Unscheduled inspection
Start date: 2018-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803169417
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803155123
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803142425
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803137729
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803148277
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803127993
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803127992
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 661800319386
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-11, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of monitoring the implementation of the previously issued regulation on the elimination of identified violations of mandatory requirements 291907302 dated February 20, 2018. The objectives of this audit are the implementation of regional state construction supervision. The subject of this audit is the implementation of the previously issued regulation on the elimination of identified violations of mandatory requirements 291907302 dated February 20, 2018.
# 77180803104712
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803097592
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803112364
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803113046
Unscheduled inspection
Start date: 2018-03-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803085622
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803085613
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-02-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803079529
Unscheduled inspection
Start date: 2018-01-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803066405
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-02-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170803038868
Unscheduled inspection
Start date: 2017-12-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170803022996
Unscheduled inspection
Start date: 2017-12-22, end date: 2017-12-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802995793
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802830562
Unscheduled inspection
Start date: 2017-11-09, end date: 2017-11-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802847375
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170802821523
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 18092017 501G3327B22
# 00170802821520
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 18092017 501G3327B22
# 77170802708082
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802709730
Unscheduled inspection
Start date: 2017-10-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802225362
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 77170802806997
Unscheduled inspection
Start date: 2017-10-31, end date: 2017-11-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170801963974
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-18, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 23052017 g 249G3327B22
# 77170802616322
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-10-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801945187
Unscheduled inspection
Start date: 2017-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701861140
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801934564
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-09-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701791342
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701840669
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701694389
Unscheduled inspection
Start date: 2017-06-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701694392
Unscheduled inspection
Start date: 2017-06-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701637083
Unscheduled inspection
Start date: 2017-05-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701637101
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701509146
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701493301
Unscheduled inspection
Start date: 2017-03-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701483553
Unscheduled inspection
Start date: 2017-03-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701371278
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701322792
Unscheduled inspection
Start date: 2017-02-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701315299
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 50160701283586
Unscheduled inspection
Start date: 2016-12-01, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 77160701112972
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701144763
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700922962
Unscheduled inspection
Start date: 2016-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700715418
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-10-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 878916 from 17082016
# 77160700062699
Unscheduled inspection
Start date: 2016-08-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700040393
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used