Found 14 inspections:

# 002005246956
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 262100394661
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 262100260081
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:


# 612100209235
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 8
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to comply with paragraph 3 of the inspection program: The construction of lightning rods, fire-fighting water storage tanks, a cesspool, a pumping station building, a 35 kV substation building combined with a wind farm. The construction of engineering networks. Installation of 35 kV cable lines. The device of the backbone network of the VOLS. Installation of KTP 1-16. Installation of wind turbines 1-16. Installation of an external fence. Landscaping.


# 612100243303
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to comply with paragraph 3 of the inspection program: Installation of 35 kV cable lines. The arrangement of the main networks of the VOLS. Installation of KTP 17-48. Mntage wind turbine 17-48. Landscaping.


# 262100166289
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-19, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of: inspection program No. 15/11-2020 dated 11/22/2020, notice of completion of construction stages 1 and 2 No.347-11/654 dated 04/14/2021. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. The subject of this audit is: compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks. - compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources - compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 262105292656
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:


# 002005246956
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-09, duration: 7
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of verification of NovaVind JSC's compliance with mandatory requirements of legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Kochubeevskaya WPP Stage 5 330 kV Barsuki substation with the construction of two 330 kV Nevinnomyssk Barsuki power lines I and II chain" located at Russia Stavropol Territory Kochubeevsky district Task Prevention detection and suppression of violations legislation on urban development, including technical regulations and design documentation for the reconstruction of the capital construction facility "Kochubeevskaya WPP Stage 5 330 kV Badgers substation with the construction of two 330 kV Nevinnomyssk Barsuki power lines I and II chain" located at Russia Stavropol Territory Kochubeevsky district Subject to mandatory requirements


# 262005265794
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority:
Purpose of inspection:


# 262005250449
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-25, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notification of completion of construction the objectives of this inspection are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation, committed by the developer, technical customer, and the person carrying out construction, compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, and drawing up certificates of inspection of structures, sections of engineering and technical support networks, and compliance with other requirements when performing works established by the project documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources, compliance with mandatory requirements and or requirements established by municipal legal acts


# 262005250443
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:


# 262005196005
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-11-18, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Inspection program dated 12092019 12162019 the objectives of this inspection are to prevent identify and suppress violations of the law on urban development by the developer, technical customer, and person carrying out construction, including technical regulations and design documentation, compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drawing up certificates of work inspection of structures, sections of engineering support networks, and compliance with other requirements when performance of works established by the project documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for the energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 002004417272
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-16, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is the compliance of NovaVind JSC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility Kochubeevskaya WPP Stage 5 330 kV Barsuki substation with the construction of two 330 kV Nevinnomyssk Barsuki power lines I and II chain located at Russia Stavropol Territory Kochubeevsky district on the basis of clause 1 2 3 4 5 21 22 24 25 28 36 44 48 52 83 89 The program's objectives are to prevent the detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility "Kochubeevskaya WPP Stage 5 330 kV Barsuki substation with the construction of two 330 kV Nevinnomyssk Barsuki power lines I and II chain" located at Russia Stavropol Territory, Kochubeevsky district, Subject to mandatory requirements


# 261903574859
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-10-16, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: NovaVind JSC's notification dated 12092019 on the start of construction of a capital construction facility. The objectives of this audit are to prevent, identify and prevent violations of urban planning legislation by the developer, technical customer, or person carrying out construction, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.