Found 10 inspections:

# 001802722621
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-24, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the execution by JSC "DKBA" of the previously issued instruction on the elimination of identified violations dated 19042018 510657plP00962018


# 772100240450
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 772100089215
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-26, duration: 2
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution by a legal entity of a previously issued prescription. The purpose of this check is to eliminate the facts of fulfillment /non-fulfillment of a previously issued prescription. The subject of this audit is the execution of the order to eliminate the identified violations


# 002004488753
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-25, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of conformity with the mandatory requirements of project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources and other regulatory legal acts in the reconstruction of capital construction object "Elling with huts" located at the address Moscow oblast Dolgoprudny g ul Flight d 1 the purpose of this check is to prevent detection and suppression approved developer technical customer and the person performing the reconstruction on the basis of an agreement with the developer or technical customer violations of the legislation on town-planning activities including technical regulations and project documentation requirements on energy saving and improving energy effektivnostpukola this check alleycatallies works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 St 48 of the town planning Code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 St 49 town planning Code of the Russian Federation or the information model, including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used with permission for the construction of the implementation of the requirements provided for by parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 001903931266
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 001904015634
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-10, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902853136
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-31, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility. The purpose of this audit is to prevent identify and prevent the technical customer, as well as the person carrying out reconstruction on the basis of a contract with the developer or technical The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. availability of a building permit compliance with the requirements set out in Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Subclause "a", paragraph 3, Paragraph 5 of Article 54 of the Urban Planning Code of the Russian Federation


# 001802722621
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-24, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the execution by JSC "DKBA" of the previously issued instruction on the elimination of identified violations dated 19042018 510657plP00962018


# 501800469055
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Moskovskoi oblasti
Purpose of inspection: The objectives of this audit are to monitor and supervise the compliance of the subject of supervision with measures to comply with mandatory requirements and measures in the field of civil defense


# 501802149868
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: To request from the employer the necessary documents to check their compliance with the requirements of labor legislation and other normative legal acts containing norms of labor law To check the compliance of the operated equipment vehicles tools and devices the condition of the territory of buildings structures facilities used means of collective and individual protection with safety requirements To draw up and issue to the employer an Act on the results of verification of compliance with labor legislation and other normative legal acts containing norms of labor law, Draw up and issue to the employer mandatory instructions To draw up a protocol on an administrative offense, make a determination on the appointment of the time and place of consideration of an administrative offense case Note the consideration of an administrative offense case is carried out in accordance with the procedure and within the time limits determined by the Administrative Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.