# 001903890709
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated May 28, 2019 353G3320H09THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body
# 001903691389
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-04, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated June 24, 2019 434G3320H09THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body
# 001902832355
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-02, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated February 26, 2019 147G3320H09THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. laws and other regulatory legal acts7 The subject of the audit is the fulfillment of the instructions of the state control body.
# 001902672383
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-28, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated February 21, 2019 130G3320H09. The objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who violations of the requirements of Federal laws and other regulatory legal acts 7 The subject of verification is the fulfillment of the instructions of the state control and supervision body
# 001902484409
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001800501377
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 14032018 g 158G3327X09
# 772101462553
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration: 3
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of Regulation No. 01-31-142600-05-16 dated August 31, 2021. with a deadline of 12/9/2021.
# 772101447035
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of Regulation No. 01-31-144800-05-05 dated September 16, 2021 with a deadline of 11/30/2021.
# 772101247477
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations No. P001-1789538898-50723804 dated 11.10.2021.
# 522101228426
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of a notification from JSC "Politekhstroy" on the elimination of violations during the construction of a capital construction facility (ex.no.519-01/01-21/688-21 dated 09/29/2021), in order to verify compliance with the requirements of the regulation dated 08/18/2021 No.519-03/03-06-04/07 ), the approved program of inspections for the capital construction facility, including during the implementation of the stages construction (load-bearing partitions, external and internal engineering networks, interior decoration; landscaping, complete completion of work), in order to assess compliance:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) the requirements established by Parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation;
3) requirements for the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.
# 772101222956
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration: 4
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of Regulation No. 01-31-144700-05-02 dated 05/12/2021 with a deadline until 08/30/2021
# 522101216910
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101216746
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of elimination of violations notification of elimination of violations No. P001-1789538898-50415709 dated 01.10.2021
# 772101223128
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 522100448123
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of a notification from JSC "Politekhstroy" on the elimination of violations during the construction of a capital construction facility (ex.no.519-01/01-21/334-21 dated 07/09/2021), in order to verify compliance with the requirements of the regulation dated 06/10/2021 No.519-03/03-06-04/07 ), in order to assess compliance:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation;
3) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility;
4) requirements for the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.
# 522100441460
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:
# 772100435995
Unscheduled inspection
Start date: 2021-08-11, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of Regulation No. 01-31-149900-05-06 dated 04/16/2021 with a deadline of execution until 07/30/2021
# 772100518525
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works with the requirements of the project documentation
# 522100419379
Unscheduled inspection
Start date: 2021-08-06, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out in order to: verify compliance with the requirements of the regulation dated 02/18/2021 No. 519-03/03-06-04/02 issued to the person carrying out the construction, JSC Politekhstroy, in order to assess compliance:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation;
3) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility;
4) requirements for the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.
# 522100267292
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of a notice on the elimination of violations during the construction of a capital construction facility received from the person carrying out the construction, JSC Politekhstroy (order No. 519-186196/21 dated 04/30/2021), in order to verify compliance with the requirements of the regulation dated 04/05/2021 No. 519-03/03-06-04/04 issued by JSC "Politekhstroy" in order to evaluate compliance of the work performed and the construction materials used during the reconstruction process, as well as the results of such work, with the requirements of the approved design documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 522100267200
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:
# 772100192082
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 4
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification in accordance with the notice of elimination of violations
# 772100199279
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: This inspection is carried out for the purpose of: monitoring compliance with the working conditions of foreign citizens involved in the implementation of major investment projects, taking into account the restrictive measures taken during the spread of coronavirus infection, based on Order No. 131 of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 "On inspections of working conditions of foreign citizens Federal Service for Supervision of Consumer Rights Protection and Human Welfare No. 147 dated 04/06/2021 "On Amendments to Rospotrebnadzor Order No. 131 dated 04/02/2021 "On Inspections of Working Conditions of Foreign Citizens Involved in the implementation of major Investment Projects", issued in order to implement paragraph 5.2 Minutes of the operational meeting of the Security Council of the Russian Federation dated 02/23/2021, approved by the President of the Russian Federation V.V.Putin on 03/05/2021 № Pr-356. The objectives of this audit are: monitoring compliance with mandatory requirements in the field of sanitary and epidemiological well-being of a person. The subject of this audit is: compliance with mandatory requirements, holding events: to prevent harm to the life and health of citizens.
# 772100239373
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 522100237628
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:
# 782100188055
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: 7
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Sankt-Peterburgu
Purpose of inspection: The inspection is carried out in order to monitor compliance with the mandatory requirements of legislation on the sanitary and epidemiological welfare of the population in order to comply with the Order of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated April 02, 2021 No. 131 DSP "On conducting inspections of working conditions of foreign citizens involved in the implementation of major investment projects", dated 04/06/2021 " 147 DSP " On Amendments to Rospotrebnadzor Order No. 131 dated 04/02/2021 "On inspections of working conditions of Foreign Citizens involved in the implementation of large Investment projects" The objectives of this audit are to monitor compliance with mandatory requirements of legislation on the sanitary and epidemiological welfare of the population. The subject of this audit is compliance by a legal entity or individual entrepreneur in the course of carrying out activities with mandatory requirements, carrying out measures to prevent harm to the life, health of citizens, harm to animals, plants or the environment.
# 772100071126
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-12, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the regulation 01-31-149900-5-03 dated 11.01.2021
# 772100056801
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-19, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the regulation 01-31-147900-5-05 dated 11/25/2020
# 772100097035
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-02, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order, assessment of the conformity of the work performed, verification of the execution of the order
# 772100015468
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-20, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works with the requirements of technical regulations and design documentation at the capital construction facility "Residential complex at the address: Moscow region, Odintsovo district, Laikovo village. Residential building No. 63" at the address: Russian Federation, Moscow region, Odintsovo district, Laikovo village
# 772105307748
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-19, duration: 1
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 502005229186
Unscheduled inspection
Start date: 2020-11-19, end date: 2020-11-25, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001141350108940244685 dated 06112020 within the framework of regulation 0131144600504 dated 22102020 with a deadline of 22122020
# 772005228806
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502005195531
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-09, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the elimination of violations as prescribed by the notification of the capital construction facility Residential building 18 Laikovo residential complex at the address of the Russian Federation Odintsovo district with Laikovo 18
# 502005195351
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-09, duration: 1
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of compliance with the regulation 0131148400502
# 502004478635
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502004478643
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-14, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001402702812736638998 dated 23072020 within the framework of regulation 0131142600510 dated 15072020 with a deadline of 31082020
# 502005200326
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-24, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of notification of elimination of violations
# 772004434140
Unscheduled inspection
Start date: 2020-06-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004293391
Unscheduled inspection
Start date: 2020-03-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502004391204
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-03-27, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001690594600334441432 dated 16032020 within the framework of regulation 0131144400506 dated 04032020 with a deadline of 12052020
# 772004287906
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001904012659
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulations dated May 28, 2019 353G3320H09 dated July 2, 2019 421G3320H09THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and bringing to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts7 The subject of the audit is the fulfillment of the instructions of the state control supervision body
# 501904143792
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 771904013644
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001903890709
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated May 28, 2019 353G3320H09THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body
# 501904276309
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-15, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001682718785530594609 dated 07112019 within the framework of regulation 0131142600509 dated 25102019 with a deadline of 21012020
# 771903987414
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501903902519
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the execution of the prescription
# 501903902518
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the execution of the prescription
# 501903902611
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903691389
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-04, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated June 24, 2019 434G3320H09THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body
# 771903921360
Unscheduled inspection
Start date: 2019-10-29, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:
# 501903902647
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-17, duration: 8
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of regulation 0131146100503 of 18092019
# 501903857796
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-16, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001463740514829193144 dated 28092019 within the framework of regulation 0131144500508 dated 21082019 with a deadline of 21102019
# 001902988869
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-08-30, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated May 28, 2019 353G3320H09THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body
# 001902832355
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-02, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated February 26, 2019 147G3320H09THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. laws and other regulatory legal acts7 The subject of the audit is the fulfillment of the instructions of the state control body.
# 77190803463676
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902672383
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-28, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated February 21, 2019 130G3320H09. The objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who violations of the requirements of Federal laws and other regulatory legal acts 7 The subject of verification is the fulfillment of the instructions of the state control and supervision body
# 77190803391215
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902484409
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-02-26, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 08112018 g 818G3320H09 Execution of the regulation from 20112018 g 849G3320H09
# 77180803302297
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001802294203
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-17, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the order from 19092018 705G3320H09
# 001802023013
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-08, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 11072018 506G3320H09
# 77180803222200
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001800501377
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 14032018 g 158G3327X09
# 001800345372
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-21, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 26032018 195G3327X09 Execution of the regulation from 30022018 214G3327X09
# 001800206146
Unscheduled inspection
Start date: 2018-03-13, end date: 2018-03-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 14112017 672G3327X09 Execution of the regulation dated 23112017 708G3327X09
# 00170802829508
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 31082017 468G3327X09
# 77170802567900
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of appeals from 23062017 72565217OB from 22062017 72543117OB on issues of remuneration of the employment contract
# 77170701854867
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's request dated 24072017 73007117OB regarding an employment contract
# 77170701637129
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701352644
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-02-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160601747185
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700059172
Unscheduled inspection
Start date: 2016-08-26, end date: 2016-09-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used