# 002004280977
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-02-20, duration: 6
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the execution by a legal entity of a previously issued instruction on the elimination of violations hereinafter the Instruction during the construction reconstruction of a capital construction facility the deadline for which has expired the task of this audit is to establish the facts of the legal entity's fulfillment of the Prescription the subject of this audit is the execution by a legal entity of the Prescription
# 001904030983
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-04, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notification of the elimination of violations of the reconstruction of the capital construction facility. The purpose of this inspection is to establish the facts of non-fulfillment of the above-mentioned requirement. The subject of this inspection is the execution of the Instruction to eliminate the identified violations.
# 001904030948
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-04, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notification of the elimination of violations of the reconstruction of the capital construction facility. The purpose of this inspection is to establish the facts of non-fulfillment of the above-mentioned requirement. The subject of this inspection is the execution of the Instruction to eliminate the identified violations.
# 001903915034
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-08, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notification of the elimination of violations of the reconstruction of the capital construction facility. The purpose of this inspection is to establish the facts of non-fulfillment of the above-mentioned requirement. The subject of this inspection is the execution of the Instruction to eliminate the identified violations.
# 001903899036
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya v sootvetstvii s izvescheniem ob ustranenii narushenii rekonstrukcii obekta kapitalnogo stroitelstva ot 26092019 1 vh 01 40897 ot 27092019 ranee vydannogo predpisaniya ot 03072019 541539prplP02602019 ob ustranenii narushenii pri stroitelstve obekta kapitalnogo stroitelstva s celyu kontrolya sootvetstviya vypolnennyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii trebovaniyam po energosberezheniyu i povysheniyu energeticheskoi effektivnosti i inyh normativno pravovyh aktov pri rekonstrukcii obekta kapitalnogo stroitelstva
# 001902923145
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-07, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction and reconstruction of a capital construction facility the task of this audit is to establish the facts of the legal entity's failure to comply with the instruction. The subject of the audit is the legal entity's execution of the Instruction on the elimination of identified violations
# 001902845135
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 001902845160
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 001902728130
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-24, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 001902591765
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-12, duration: —
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: proverka predpisaniya ob ustranenii vyyavlennogo narusheniya ot 13092018 15361720146
# 001902631719
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-04-16, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: Ocenka sootvetstviya soiskatelya licenzii licenzionnym trebovaniyam po porucheniyu 1 ot 28022019g Glavnogo upravleniya MCHS Rossii po Moskovskoi oblasti Provedenie proverki vypolneniya soiskatelem licenzii licenzionnyh trebovanii i prinyatie mer po rezultatam etoi proverki v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federacii Sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah
# 001902624652
Unscheduled inspection
Start date: 2019-03-21, end date: 2019-03-26, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The task is to establish the facts of the fulfillment of the instruction on the elimination of violations The subject is the fulfillment of the Instruction on the elimination of violations
# 001802056293
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-29, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 2091134 ot 01122016 861194 ot 14052018 zadachami nastoyaschei proverki yavlyayutsya proveryaetsya soblyudenie trebovanii pozharnoi bezopasnosti ispolnenie kotoryh bylo predpisano ranee vydannym predpisaniem ob ustranenii narushenii i prinyatie mer po rezultatam etoi proverki v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federaciipredmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 001801609286
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-13, duration: —
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki predpisaniya ob ustranenii vyyavlennogo narusheniya ot 30032018 153626715
# 00170802819726
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-12-04, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: proverki vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 2091134 ot 01122016g
# 00170802751580
Unscheduled inspection
Start date: 2017-10-18, end date: 2017-10-31, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the compliance of the work performed and the building materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 and 3 of Articles 52 of the Urban Planning Code of the Russian Federation
# 00150601307834
Unscheduled inspection
Start date: 2015-11-02, end date: —, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: proverka vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 581195 ot 25042014 g
# 00150601259939
Unscheduled inspection
Start date: 2015-04-21, end date: 2015-05-18, duration: —
Authority: Mezhregionalnoe upravlenie 170 Federalnogo medikobiologicheskogo agentstva
Purpose of inspection: Soblyudenie obyazatelnyh trebovanii provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan zhivotnym okruzhayuschei srede
# 772100289410
Unscheduled inspection
Start date: 2021-06-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502100136365
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-05, duration: —
Authority: Glavnoe upravlenie Moskovskoi oblasti «Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti»
Purpose of inspection: Compliance with mandatory requirements or requirements established by municipal legal acts; Execution of an order (order) GJI in accordance with the instructions of the President; Verification of compliance with mandatory information disclosure requirements in accordance with the standard of information disclosure approved by the Government of the Russian Federation by organizations operating in the field of management of apartment buildings; Verification of compliance with the requirements of housing legislation of the Russian Federation; Verification of completeness, reliability, relevance of information posted by management organizations in the GIS housing and communal services system
# 772100074958
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-03-25, duration: 6
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya yuridicheskim licom vydannogo predpisaniya, zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniya/nevypolneniya yuridicheskim licom predpisaniya, predmetom nastoyaschei proverki yavlyaetsya ispolnenie yuridicheskim licom predpisaniya ob ustranenii vyyavlennyh narushenii
# 772100053881
Unscheduled inspection
Start date: 2021-03-23, end date: 2021-03-31, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution of a previously issued prescription by a legal entity. The purpose of this check is to eliminate the facts of fulfillment /non-fulfillment of a previously issued prescription. The subject of this audit is the execution of the order to eliminate the identified violations.
# 772100053911
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100053859
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502005259110
Unscheduled inspection
Start date: 2020-12-02, end date: 2020-12-29, duration: 20
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: Proverka vypolneniya punktov 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 71 74 75 76 79 80 82 84 85 86 87 88 ranee vydannogo predpisaniya ot 22112018g 2301188 o prinyatii mer napravlennyh na ustranenie narushenii trebovanii pozharnoi bezopasnosti vlekuschih neposredstvennuyu ugrozu prichineniya vreda zhizni i zdorovyu grazhdan Provedenie proverki po soblyudeniyu organizaciyami trebovanii pozharnoi bezopasnosti i prinyatie mer po rezultatam etoi proverki v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federacii Vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 002005216237
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri stroitelstve obekta kapitalnogo stroitelstva Zadachei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnostiPredmetom proverki yavlyaetsyasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 st 48 Gradostroitelnogo Kodeksa Rossiiskoi Federacii proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 st 49 Gradostroitelnogo Kodeksa Rossiiskoi Federacii i ili informacionnoi modeli v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvovypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 002005212417
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: s celyu kontrolya sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri rekonstrukcii obekta kapitalnogo stroitelstvaZadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 st 48 Gradostroitelnogo Kodeksa Rossiiskoi Federacii proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 st 49 Gradostroitelnogo Kodeksa Rossiiskoi Federacii i ili informacionnoi modeli v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovnalichie razresheniya na stroitelstvovypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 002004488835
Unscheduled inspection
Start date: 2020-08-25, end date: 2020-09-07, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Cel kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri rekonstrukcii obekta kapitalnogo stroitelstva Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 st 48 Gradostroitelnogo Kodeksa Rossiiskoi Federacii proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 st 49 Gradostroitelnogo Kodeksa Rossiiskoi Federacii i ili informacionnoi modeli v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvo vypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 002004431343
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-29, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri rekonstrukcii obekta kapitalnogo stroitelstva zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 st 48 Gradostroitelnogo Kodeksa Rossiiskoi Federacii proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 st 49 Gradostroitelnogo Kodeksa Rossiiskoi Federacii i ili informacionnoi modeli v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovnalichie razresheniya na stroitelstvovypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 002004463749
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-06-15, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of completed works with the mandatory requirements of the design documentation, requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction and reconstruction of a capital construction facility. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer, including The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the equipment requirements of the capital construction facility metering devices for used energy resources
# 002004324560
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-02-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya yuridicheskim licom ranee vydannogo predpisaniya ot 25112019 542882prplP052512019 ob ustranenii narushenii pri rekonstrukcii obekta kapitalnogo stroitelstva «CHast zdaniya nezhiloe proizvodstvennoe pomeschenie pom I lit A 76A» raspolozhennogo po adresu Moskovskaya oblast g Korolev ul Ilicha d 7 srok dlya ispolneniya kotorogo istek
# 002004324634
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-11, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Celyu proverki yavlyaetsya kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvo vypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 002004293979
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-02-14, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 002004280977
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-02-20, duration: 6
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the execution by a legal entity of a previously issued instruction on the elimination of violations hereinafter the Instruction during the construction reconstruction of a capital construction facility the deadline for which has expired the task of this audit is to establish the facts of the legal entity's fulfillment of the Prescription the subject of this audit is the execution by a legal entity of the Prescription
# 002004223728
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-07, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004223657
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-07, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004223628
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-07, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004219830
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-22, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 001904030983
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-04, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notification of the elimination of violations of the reconstruction of the capital construction facility. The purpose of this inspection is to establish the facts of non-fulfillment of the above-mentioned requirement. The subject of this inspection is the execution of the Instruction to eliminate the identified violations.
# 001904030948
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-04, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notification of the elimination of violations of the reconstruction of the capital construction facility. The purpose of this inspection is to establish the facts of non-fulfillment of the above-mentioned requirement. The subject of this inspection is the execution of the Instruction to eliminate the identified violations.
# 501904151088
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-12-03, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: Proverka vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 2301188 ot 22112018g Provedenie proverki po soblyudeniyu organizaciyami i grazhdanami trebovanii pozharnoi bezopasnosti i prinyatie mer po rezultatam etoi proverki v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federacii Vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 001903915034
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-08, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notification of the elimination of violations of the reconstruction of the capital construction facility. The purpose of this inspection is to establish the facts of non-fulfillment of the above-mentioned requirement. The subject of this inspection is the execution of the Instruction to eliminate the identified violations.
# 001903864797
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-30, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 001903899036
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya v sootvetstvii s izvescheniem ob ustranenii narushenii rekonstrukcii obekta kapitalnogo stroitelstva ot 26092019 1 vh 01 40897 ot 27092019 ranee vydannogo predpisaniya ot 03072019 541539prplP02602019 ob ustranenii narushenii pri stroitelstve obekta kapitalnogo stroitelstva s celyu kontrolya sootvetstviya vypolnennyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii trebovaniyam po energosberezheniyu i povysheniyu energeticheskoi effektivnosti i inyh normativno pravovyh aktov pri rekonstrukcii obekta kapitalnogo stroitelstva
# 001903883676
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001903821310
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001903821287
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 001902926414
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-20, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902926310
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-06, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902923145
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-07, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction and reconstruction of a capital construction facility the task of this audit is to establish the facts of the legal entity's failure to comply with the instruction. The subject of the audit is the legal entity's execution of the Instruction on the elimination of identified violations
# 001902853125
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-24, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility. The purpose of this audit is to prevent identify and prevent the technical customer, as well as the person carrying out reconstruction on the basis of a contract with the developer or technical The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. availability of a building permit compliance with the requirements set out in Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Subclause "a", paragraph 3, Paragraph 5 of Article 54 of the Urban Planning Code of the Russian Federation
# 001902845135
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 001902845160
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-02, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 001902885062
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-05, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction and reconstruction of a capital construction facility the task of this audit is to establish the facts of the legal entity's failure to comply with the instruction. The subject of the audit is the legal entity's execution of the Instruction on the elimination of identified violations
# 001902855955
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-08, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902803359
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this audit is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of a contract with the developer or the technical customer. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902802504
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-07-03, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Celyu proverki yavlyaetsya kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvo vypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001902802500
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-07-03, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Celyu proverki yavlyaetsya kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvo vypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001902713044
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Celyu proverki yavlyaetsya kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvo vypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001902728130
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-24, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the instruction on the elimination of violations The subject of this audit is the execution of the Instruction on the elimination of violations
# 001902591765
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-12, duration: —
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: proverka predpisaniya ob ustranenii vyyavlennogo narusheniya ot 13092018 15361720146
# 001902644656
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-04-19, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902619737
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this check is to prevent, identify and suppress violations of the legislation on urban planning committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used the availability of a construction permit requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902631719
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-04-16, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: Ocenka sootvetstviya soiskatelya licenzii licenzionnym trebovaniyam po porucheniyu 1 ot 28022019g Glavnogo upravleniya MCHS Rossii po Moskovskoi oblasti Provedenie proverki vypolneniya soiskatelem licenzii licenzionnyh trebovanii i prinyatie mer po rezultatam etoi proverki v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federacii Sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah
# 001902624652
Unscheduled inspection
Start date: 2019-03-21, end date: 2019-03-26, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The task is to establish the facts of the fulfillment of the instruction on the elimination of violations The subject is the fulfillment of the Instruction on the elimination of violations
# 001902541767
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-07, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts. The purpose of this audit is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of a contract with the developer or the technical customer. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 501902545771
Unscheduled inspection
Start date: 2019-02-28, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 001902507035
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-08, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov pri rekonstrukcii obekta zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnosti sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 001802056293
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-29, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 2091134 ot 01122016 861194 ot 14052018 zadachami nastoyaschei proverki yavlyayutsya proveryaetsya soblyudenie trebovanii pozharnoi bezopasnosti ispolnenie kotoryh bylo predpisano ranee vydannym predpisaniem ob ustranenii narushenii i prinyatie mer po rezultatam etoi proverki v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federaciipredmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 501802149230
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001801609286
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-13, duration: —
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki predpisaniya ob ustranenii vyyavlennogo narusheniya ot 30032018 153626715
# 001800463153
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-18, duration: —
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki predpisaniya ob ustranenii vyyavlennogo narusheniya ot 30032018 153626614
# 00170802819726
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-12-04, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: proverki vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 2091134 ot 01122016g
# 00170802751580
Unscheduled inspection
Start date: 2017-10-18, end date: 2017-10-31, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the compliance of the work performed and the building materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 and 3 of Articles 52 of the Urban Planning Code of the Russian Federation
# 50170701538227
Unscheduled inspection
Start date: 2017-04-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160701096775
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-12-02, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: proverki vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 2531147 ot 30112015g
# 00150601307834
Unscheduled inspection
Start date: 2015-11-02, end date: —, duration: —
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: proverka vypolneniya ranee vydannogo predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti 581195 ot 25042014 g
# 00150601339476
Unscheduled inspection
Start date: 2015-10-12, end date: 2015-10-12, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: obespechenie vypolneniya yuridicheskim licom punktov 2433 predpisaniya ot 26 iyunya 2015 g 521798plP01962015 ob ustranenii vyyavlennyh narushenii srok dlya vypolneniya kotoryh istek
# 00150601259939
Unscheduled inspection
Start date: 2015-04-21, end date: 2015-05-18, duration: —
Authority: Mezhregionalnoe upravlenie 170 Federalnogo medikobiologicheskogo agentstva
Purpose of inspection: Soblyudenie obyazatelnyh trebovanii provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan zhivotnym okruzhayuschei srede