Found 100 inspections:

# 002105314487
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-5018-rp-25 dated 04.10.2019.


# 002105314457
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-3141-28 dated 07.12.2020.


# 002105314470
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-2037-14 dated 08/21/2020.


# 002105314477
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-691-11 dated 03/13/2020.


# 002005269249
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005269224
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005232315
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-11, duration: 9
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 10 of the program for conducting inspections of the capital construction facility of JSC Gaisky GOK "Opening and development of mountains 8301310m underground mine" 19 this is a verification of compliance of completed works and applied building materials during the construction of the capital construction facility of JSC Gaisky GOK "Opening and development of mountains 8301310m underground mine" stage 19 as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005237019
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005237009
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-12-07, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005236997
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005236978
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005237088
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-12-07, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005201546
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the performance of the works specified in paragraph 2 of the Program for conducting inspections of the capital Construction facility of PJSC Gaisky GOK


# 002005201522
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the performance of the works specified in paragraph 2 of the Program for conducting inspections of the capital Construction facility of PJSC Gaisky GOK


# 002004471400
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004479258
Unscheduled inspection
Start date: 2020-07-28, end date: 2020-08-03, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK Capital mine workings of the horizon 1150 m Central trenches 1 2 chambers, etc. without the complex of workings "VM Warehouse go1150m" Mountains 1150 m Hanging side drift Eastern Mountains 1150m Recumbent side drift Western Mountains 1150m Central ort Mountains 1150m to the shaft of the mine "Severnaya Ventilation2" as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002004479240
Unscheduled inspection
Start date: 2020-07-28, end date: 2020-08-03, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK Horizon 1310 m of Workings of the trunk yards of the central yards of the central group of trunks the central UPC chamber and other chamber workings Horizon 1310 m of Workings of the pumping station of the main drainage of the Underground mine Mining Capital construction and commissioning works on capital construction facilities as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002004372803
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-17, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, the complex for the production of condensed dump tailings of the concentrating plant for mining reclamation of quarries 1 3" Stage 1, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy used resources verification of the availability of a construction permit verification of compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002004372768
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-08, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of violations of compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations verification of compliance with the instruction of the West Ural Department of Rostechnadzor 355018rp25 dated 04102019


# 002004298523
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-13, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the performed works and applied building materials during the construction of the capital construction facility of JSC Gaisky GOK "Opening and development of the 8301310m underground mine" stage 19, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002004383202
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-20, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the performed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK installation of technological equipment as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 23 and 3_1 of Article 52 of the Federal Law dated 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002004209640
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001904114522
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-30, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of paragraphs 3235 3739 41 with a deadline of 20112019 paragraphs 4547 with a deadline of 29112019 paragraphs 48 49 52 with a deadline of 01102019 paragraph 51 with a deadline of 01122019 previously issued regulation 33GN4219rp153 of 16092019


# 001903924555
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-29, duration:
Authority: Uralskoe upravlenie gosudarstvennogo zheleznodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: 1


# 001903891896
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-29, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, a complex for the production of condensed dump tailings of an enrichment plant for mining reclamation of quarries 1 3" Stage 1, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy used verification of the availability of a construction permit verification of compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 001903810257
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903014138
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-18, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Control of the execution of the regulation from 22042019 6OR07AV19 with a deadline of 20092019


# 001902920198
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the performed works and applied building materials during the construction of the capital construction facility of JSC Gaisky GOK "Opening and development of the 8301310m underground mine" stage 19, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 001902749956
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-17, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the performed works and applied building materials during the construction of the capital construction facility of JSC Gaisky GOK "Opening and development of the 8301310m underground mine" stage 19, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 001902772072
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-19, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of compliance of the activities or actions inaction carried out by a legal entity with the requirements established by federal laws and regulatory legal acts adopted in accordance with them in the field of safety of hydraulic structures


# 001902797004
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902690642
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-29, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to monitor the implementation of the measures prescribed


# 001902543503
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-22, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Control of the execution of the regulation dated 29062018 6OR16AV18 with a deadline of up to 25032019


# 001902504465
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po akkreditacii po Privolzhskomu federalnomu okrugu
Purpose of inspection:


# 001801774119
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-12-10, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Control of the execution of the regulation dated 29062018 6OR15AV18 with a deadline of up to 12112018


# 001802115449
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the compliance of the cylinder inspection point with the requirements of Federal Norms and Rules in the field of industrial safety "Rules for industrial safety of hazardous production facilities where pressure equipment is used" approved by order of the Federal Service for Environmental Technological and Nuclear Supervision dated 28032014 116 and verifying the completeness and reliability of the information contained in the application of PJSC Gaisky GOK 096225 dated 30102018 0724119 dated 01112018 and the materials submitted for the assignment of the cylinder branding cipher


# 001800664536
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-07, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Opening and development of the 8301310m underground mine" stage 17, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800643885
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800201276
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-02, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Constant supervision of the OPO of the 1st class of danger


# 001800201105
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-02, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Constant supervision of the OPO of the 1st class of danger


# 00180803054455
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-30, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of the previously issued instruction of the West Ural Department of Rostechnadzor 33GN955rpo080 dated 28072017 the deadline for the execution of paragraph 119 of which expired on 25102017


# 00170802922839
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802822870
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-11-30, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the fulfillment of a previously issued prescription


# 00170802449204
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701886233
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-08, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of paragraph 22707175 of regulation 33GN1739 rpo134 of 28102016


# 00170701845397
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-26, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: conducting an on-site unscheduled inspection


# 00170701567139
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-18, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the prescription


# 00170701528320
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-04-21, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the fulfillment of a previously issued prescription


# 00170701448338
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-14, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00170701448337
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-14, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00170701418340
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-22, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of a previously issued prescription


# 00160700867821
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-06, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160700676827
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-14, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160700867573
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-19, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the progress of preparation of electric power and heat supply facilities for operation in the 2016-2017 OZP


# 00160601679548
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-14, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160601650929
Unscheduled inspection
Start date: 2016-06-06, end date: 2016-06-10, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160601595345
Unscheduled inspection
Start date: 2016-05-26, end date: 2016-05-30, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160601561665
Unscheduled inspection
Start date: 2016-04-25, end date: 2016-04-27, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160601532503
Unscheduled inspection
Start date: 2016-03-14, end date: 2016-03-18, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00160601460250
Unscheduled inspection
Start date: 2016-01-20, end date: 2016-01-22, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00150601318626
Unscheduled inspection
Start date: 2015-11-09, end date: 2015-11-12, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: Verification of the Report of the Gaisky Mining and Processing Plant Joint Stock Company on the elimination of identified inconsistencies dated 08102015 367291 PFOvx912 dated 15102015 and documents attached to the report on the elimination of identified inconsistencies with the accreditation criteria specified in the Notification of the Federal Accreditation Service dated 26082015 3011103CN


# 00150600633838
Unscheduled inspection
Start date: 2015-09-14, end date: 2015-09-17, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 00150600627997
Unscheduled inspection
Start date: 2015-09-14, end date: 2015-09-17, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development


# 562101209006
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration:
Authority:
Purpose of inspection:


# 562100369021
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 592100257409
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, inclined exit in int. 1230-1310 m with serifs on the sub-floors of mountains. 1257 m, 1285 m (underground transport mining - for descent/ascent of self-propelled and drilling equipment, fresh air supply and emergency exit). The horizon is 1310 m. Workings of the ore zone (the western field drift in the volume of the entrance to the bunker of the DK No. 12, a complex of unloading chambers for the bunker of unbroken ore of the crushing complex No. 12 "Rudny-2" tract to the shaft of the mine "Operational")


# 592100257362
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, Inclined flank exit in the range of 1310-1390 m of the Underground mine, horizon of 1390 m.


# 562100267361
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration:
Authority:
Purpose of inspection:


# 592100198264
Unscheduled inspection
Start date: 2021-05-13, end date: —, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the performed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, installation of technological equipment, including individual and complex tests, NDT, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy used resources; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".


# 592100198228
Unscheduled inspection
Start date: 2021-05-13, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and the applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, crushing and conveyor complex "Rock-2" tract installation of plate feeder No. 2 (heavy type) in the DZK mountain.1260 m of the Skipovaya mine shaft, check-in to the conveyor reloading chamber No.17/17a from the central turnout, arrivals to the bunkers of the unbroken rock mass of complexes No. 22 and No. 23 along the mountains of 1310 m. - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 592100174679
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the compliance of the completed works and the applied building materials during the construction of the capital construction facility of JSC Gaisky GOK. Opening and development of the mountains. 830-1310m of the underground mine" Stage 19, as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources; - checking the availability of a building permit; - verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".


# 562100309281
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration:
Authority:
Purpose of inspection:


# 592100139587
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-04-26, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and the applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, the shaft of the Skipovaya mine (the deepened part of the trunk in the range of 1070-1310 m) to otm. the horizon is 1310 m with a technical discharge to the horizons of 1075 m, 1150 m, 1230 m and 1310 m. The turnout to the shaft of the Skipovaya mine according to otm. horizon of 1310 m (purpose -cleaning of the spillage from the shaft of the Skip mine), connecting the shaft of the Skip mine with the trunk of the Kletevaya mine according to otm. the horizon is 1310 m (purpose - ventilation and emergency exit). - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 592100139381
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-23, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility "Reconstruction of the underground mine of PJSC Gaisky GOK with an increase in productivity to 9 million tons per year" Stage 14 consisting of: Ruddworks of the mine shaft "Operational" according to the horizon marks of 1070m., 1150m., 1230m., as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources; - availability of a building permit; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 592100139326
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-23, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a building permit; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 592100139286
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-23, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility "Reconstruction of the underground mine of PJSC Gaisky GOK with an increase in productivity to 9 million tons per year" 41 stages consisting of: The shaft of the mine "Operational" in the range of mountains. 1310-1419 m, the ruddworks of the shaft of the mine "Operational" at the horizon marks of 910 m, 990 m, the shaft of the mine "Northern ventilation 2" in the range of 1230-1310 m with technical waste to the horizon of 1150 m, 1230 m and 1310, as well as the results of such work according to the requirements of design documentation, in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a building permit; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".


# 592100081751
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the compliance of the completed works and the applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK. The complex of production of condensed dump tailings of an enrichment plant for mining and technical reclamation of quarries No. 1-No. 3" Stage 1, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; - checking the availability of a building permit; - verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".


# 562100068449
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-24, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 12/27/2019; The objectives of this audit are: to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, legislation on urban planning (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation). The subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, paragraphs 1, 6,7,8 of the inspection program dated 12/27/2019).


# 592100018433
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-26, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the compliance of the completed works and the applied building materials during the construction of the capital construction facility of JSC Gaisky GOK. Opening and development of the mountains. 830-1310m of the underground mine" Stage 19, as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources; - checking the availability of a building permit; - verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".


# 592100036242
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-24, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility "Reconstruction of the underground mine of PJSC Gaisky GOK with an increase in productivity to 9 million tons per year" Stage 20 consisting of: The horizon is 1310 m. The pumping station of the main drainage (at the trunk of the Kletevaya mine), as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a building permit; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 592100035842
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-24, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility "Reconstruction of the underground mine of PJSC Gaisky GOK with an increase in productivity to 9 million tons per year" Stage 40 consisting of Horizon 1390 m. The pumping station of the district drainage from the pumping station "Pumpnaya" (at the trunk of the Kletevaya mine), as well as the results of such work, meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used; - availability of a building permit; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".


# 592100040111
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-17, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, Horizon 1390 m. Workings of the near-trunk yards of the central group of trunks (central turnout No. 1, turnout of the Skipovaya mine, turnout of the Kletevaya mine, turnout of the Novaya mine, turnout of the Operational mine with bypass work, chambers for various purposes, etc.) Mining, construction, installation and commissioning of the capital construction facility.; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 562100042404
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-04-01, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii, kadastra i kartografii po Orenburgskoi oblasti
Purpose of inspection: Purpose: verification of the elimination of violations of land legislation in accordance with the Order on the elimination of the identified violation of the requirements of the land legislation of the Russian Federation No. 20 dated 08/23/2018; the purpose of this audit is to ensure compliance by the Public Joint Stock Company Gaisky Mining and Processing Plant (PJSC Gaisky GOK); the subject: compliance with the instructions of state control (supervision) bodies, municipal control bodies


# 592100040081
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-11, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, the shaft of the Exploitational mine (up to m. 1419m from the DZK mountain.1310m), construction, installation and commissioning works on the ore yards of m. mountains.990m and 1150m of the shaft of the Exploitational mine; - verification of compliance with the requirements of Parts 2,3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation"


# 592100041300
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-02-16, duration: 4
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the order of the West Ural Department of Rostechnadzor No. 33GN-RP-283-1733- O-067 from 06/23/2020


# 002105314487
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-5018-rp-25 dated 04.10.2019.


# 002105314457
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-3141-28 dated 07.12.2020.


# 002105314470
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-2037-14 dated 08/21/2020.


# 002105314477
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of the elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation identified during the implementation of state construction supervision, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations; - verification of compliance with the instruction of the West Ural Department of Rostechnadzor No. 35-691-11 dated 03/13/2020.


# 002005269249
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005269224
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005232370
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-11, duration: 9
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 11 of the program for conducting inspections of the capital construction facility of PJSC Gaisky GOK, the complex for the production of condensed dump tails of the concentrating plant for mining reclamation of quarries 1 3" 1 this is a verification of compliance of the completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK, the complex for the production of condensed dump tails of the concentrating plant factories for carrying out mining and technical reclamation of quarries 1 3" Stage 1 as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources verification of a construction permit verification of compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation Federation"


# 002005232315
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-11, duration: 9
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 10 of the program for conducting inspections of the capital construction facility of JSC Gaisky GOK "Opening and development of mountains 8301310m underground mine" 19 this is a verification of compliance of completed works and applied building materials during the construction of the capital construction facility of JSC Gaisky GOK "Opening and development of mountains 8301310m underground mine" stage 19 as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 562005255254
Unscheduled inspection
Start date: 2020-12-03, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 002005237019
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005237009
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-12-07, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005236997
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005236978
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 002005237088
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-12-07, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials during the construction of the capital construction facility of PJSC Gaisky GOK verification of compliance with the requirements of Parts 23 and 3_1 of Article 52 of the Federal Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"


# 562005253484
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-07, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of completion of the capital construction facility dated 20112020 155727 bx dated 23112020 2717 The objectives of this inspection are to identify and suppress violations of the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used legislation on urban planning activities 2 st 51 h 2 3 31 6 st 52 h 2 4 7 st 53 of the Urban Planning Code of the Russian Federation The subject of this audit is compliance with the mandatory requirements of urban planning legislation compliance of work and construction materials used in the construction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources notice of completion of construction of the capital construction facility dated 20112020 155727 bx dated 23112020 2717


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.