Found 44 inspections:

# 001802098697
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Notification of PJSC Transneft on the completion of construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including project documentation, Compliance control of the work and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of the capital construction facility "High-speed Communication Line at the DemyanskTomsk site, the Third stage is Stage 34" located at Khanty-Mansiysk Autonomous Okrug, Tomsk Region


# 001800645569
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 021800524451
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: The objectives of this audit are to identify prevent and suppress violations of the legislation on urban development, including technical regulations and project documentation


# 001800244740
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "High-speed communication line at the DemyanskTomsk Second Stage site" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code


# 001800094060
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-26, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 32" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 00170802919954
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentationconformity of work performed and construction materials used and results during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802757171
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, preventing the identification and suppression of violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation, and the compliance of work performed and construction materials used and results during the construction of a capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the need for a construction permit to comply with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802882465
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-27, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the capital construction facility High-speed communication line at the Demyansk Tomsk site Third stage Stage 31The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such inspections. the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 00170802882575
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701691051
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-07-07, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program approved by Order No. 12092016 577847 for the facility "High-speed communication line at the Demyansk Tomsk site First stage Stage 13". The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 00170701779884
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify the elimination of violations based on a notice of elimination of violations for the capital construction facility High-speed communication line at the DemyanskTomsk site. The second stage of this audit is the prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this audit is to comply with mandatory requirements and or requirements established by municipal legal acts


# 00170701780019
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701563098
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the capital construction facility "High-speed communication line at the DemyanskTomsk site Third Stage Stage 34" located at Khanty-Mansiysk Autonomous Okrug, Tomsk Region, based on the inspection program dated 19012017 4200117 Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation Compliance performance of works and applied building materials and results during the construction of the capital construction facility "High-speed communication line at the DemyanskTomsk site Third stage Stage 34" as well as the results of such work to the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit meeting the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701563088
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 33" located at Tomsk Region, Kemerovo region, based on the inspection program dated 19012017 4200217 Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation Compliance performance of works and applied construction materials and results during the construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 33" as well as the results of such work to the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the need for a construction permit, the fulfillment of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation


# 00170701489269
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 771902971251
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-09-10, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: assessment of the licensee's compliance with licensing requirements and the compliance of information about the licensee contained in the unified state Register of Legal Entities and other federal information resources upon the application of the legal entity 01199262 dated 15072019 for the reissue of the document confirming the license


# 001902473341
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 32" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility Objectives of this inspection The purpose of this audit is to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of permits for the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001802191076
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 32" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility Objectives of this inspection The purpose of this audit is to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of permits for the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001802191070
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 31" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility Objectives of this inspection The purpose of this audit is to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of permits for the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 741802129553
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the foundations of the AMS grounding device BS US Asha BS US Leninsk BS SHVK Kanashi BS SHVK Berduyash NUP19 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 001802098697
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Notification of PJSC Transneft on the completion of construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including project documentation, Compliance control of the work and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of the capital construction facility "High-speed Communication Line at the DemyanskTomsk site, the Third stage is Stage 34" located at Khanty-Mansiysk Autonomous Okrug, Tomsk Region


# 001800645569
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-12, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to implement the program of inspections for the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 31" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility The objectives of this audit are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001802157220
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-09-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the audit is conducted in order to monitor the implementation of the previously issued order dated May 18, 2018 222914. The objectives of this audit are to monitor the measures taken by the legal entity to comply with the order and comply with mandatory norms and rules of operation in power plants, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal Laws and other regulatory legal acts, the subject of this audit is the fulfillment of the instructions of the state control body.


# 741800663644
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of AMS foundations, the installation of antenna masts, the installation of a reference sign for BS US Etkul BS Birgilda radio towers and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation 2The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 021800524451
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: The objectives of this audit are to identify prevent and suppress violations of the legislation on urban development, including technical regulations and project documentation


# 001800438333
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800362671
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-09, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "High-speed communication line at the DemyanskTomsk Second Stage site" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001800302359
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility High-speed communication line at the Demyansk Tomsk site Third stage Stage 31 The objectives of this audit are to verify that the legal entity eliminates the identified violation The subject of this audit is compliance with the regulations of state control bodies, supervision bodies of municipal control


# 001800252977
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over an object of capital construction on the basis of 5 and a notice of completion of construction of a reconstruction of an object of capital construction Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the reconstruction of an object of capital construction, as well as the results of such compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800244740
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "High-speed communication line at the DemyanskTomsk Second Stage site" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in parts 2 3 and 3_1 of Article 52 of this Code


# 001800094060
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-26, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 32" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001800094048
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-26, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to implement the program of inspections for the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 31" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility The objectives of this audit are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 00170802919954
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentationconformity of work performed and construction materials used and results during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802757171
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, preventing the identification and suppression of violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation, and the compliance of work performed and construction materials used and results during the construction of a capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the need for a construction permit to comply with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802882465
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-27, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the capital construction facility High-speed communication line at the Demyansk Tomsk site Third stage Stage 31The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such inspections. the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 00170802882575
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-27, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the capital construction facility High-speed communication line at the Demyansk Tomsk site Third stage Stage 32The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such inspections. the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 77170802530829
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-10-12, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: assessment of the compliance of a legal entity with licensing requirements monitoring of compliance by the license applicant with the licensing requirements and conditions of radiation safety requirements operating in the field of the use of ionizing radiation sources, except if these sources are used in medical activities legislation in the field of sanitary and epidemiological welfare of the population information contained in the documents of the legal entity establishing the organizational and legal form of rights and obligations documents used in the implementation of activities and related to the implementation of mandatory requirements in the implementation of the licensed type of activity and the requirements established by municipal legal acts of state control bodies, municipal control bodies


# 00170701691051
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-07-07, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program approved by Order No. 12092016 577847 for the facility "High-speed communication line at the Demyansk Tomsk site First stage Stage 13". The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this inspection is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 00170701779884
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify the elimination of violations based on a notice of elimination of violations for the capital construction facility High-speed communication line at the DemyanskTomsk site. The second stage of this audit is the prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this audit is to comply with mandatory requirements and or requirements established by municipal legal acts


# 00170701780019
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-16, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the inspection program 5710371 dated 03112016 for the capital construction facility High-speed communication line at the Demyansk Tomsk site Third stage Stage 31The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this audit is to comply with mandatory requirements and or requirements established by municipal legal acts


# 00170701779964
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-16, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the inspection program 5710691 dated 14112016 for the capital construction facility High-speed communication line at the Demyansk Tomsk site Third stage Stage 32The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The purpose of this audit is to comply with mandatory requirements and or requirements established by municipal legal acts


# 00170701563098
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the capital construction facility "High-speed communication line at the DemyanskTomsk site Third Stage Stage 34" located at Khanty-Mansiysk Autonomous Okrug, Tomsk Region, based on the inspection program dated 19012017 4200117 Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation Compliance performance of works and applied building materials and results during the construction of the capital construction facility "High-speed communication line at the DemyanskTomsk site Third stage Stage 34" as well as the results of such work to the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit meeting the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701563088
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 33" located at Tomsk Region, Kemerovo region, based on the inspection program dated 19012017 4200217 Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation Compliance performance of works and applied construction materials and results during the construction of the capital construction facility "High-speed communication line at the Demyansk Tomsk site Third stage Stage 33" as well as the results of such work to the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the need for a construction permit, the fulfillment of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation


# 00170701489269
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-22, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program 577890 dated 13112015 for the capital construction facility High-speed communication line in the DemyanskTomsk section of the second stage. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this inspection is to comply with mandatory requirements and or requirements established by municipal legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.