# 002004412844
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection:
# 002004346538
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by MMK PJSC of the points of the previously issued instruction on the elimination of detected violations of Sv5865r dated 29112019the purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction on the elimination of detected violations of Sv5865r dated 29112019
# 002004346531
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by MMK PJSC of the points of the previously issued instruction on the elimination of detected violations of Sv5867r dated 29112019the purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction on the elimination of detected violations of Sv5867r dated 29112019
# 002004346511
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by MMK PJSC of the points of the previously issued instruction on the elimination of detected violations of Sv5866r dated 29112019the purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction on the elimination of detected violations of Sv5866r dated 29112019
# 002004227838
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-07, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 25102019 H5025, the deadline for which expires. The objectives of this inspection are to take measures to control the elimination of violations specified in the instruction dated 25102019 H50257 The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies.
# 002004295126
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-02-28, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the implementation of paragraphs 1 and 2 of the previously issued regulation dated 06082019 H3343, the deadline for which expires. The task is to take measures to monitor the elimination of violations specified in paragraphs 1 and 2 of the regulation dated 06082019 H3343. The implementation of the regulations of the state control and supervision bodies
# 002004289864
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-02-21, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the implementation of paragraphs 7 and 8 of the previously issued regulation dated 27112019 H5849, the deadline for which expires. The task is to take measures to monitor the elimination of violations specified in paragraphs 7 and 8 of the regulation dated 27112019 H5849Presult the implementation of regulations of state control and supervision bodies
# 001903991228
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-11-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by MMK PJSC of the points of the previously issued regulations on the elimination of detected violations Sv3486r dated 13082019 and Sv3487r dated 13082019the purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued regulations on the elimination of detected violations Sv3486r dated 13082019 and Sv3487r dated 13082019
# 001903958282
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903857714
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the fulfillment of the previously issued order dated 14062019 H2425, the deadline for which expires. The objectives of this inspection are to take measures to control the elimination of violations specified in the order dated 14062019 H24257. The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies.
# 001902939115
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 31082018 H4370, the deadline for which has expired. The objectives of this inspection are to take measures to control the elimination of violations specified in paragraphs of the instruction from 31082018 H4370. The purpose of this inspection is to comply with the instructions of the state control and supervision authorities
# 001902964884
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 26042019 H1501, the deadline for which expires. The objectives of this inspection are to take measures to control the elimination of violations specified in the instruction from 26042019 H15017. The subject of this inspection is the fulfillment of the instructions of the state control and supervision authorities.
# 001902912569
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-07-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the implementation of paragraphs 7 and 8 of the previously issued regulation dated 17062019h2408, the deadline for which expired 28072019the objectives of this audit are to take measures to control the elimination of violations specified in paragraphs 7 and 8 of the regulation dated 17062019h2408the purpose of this audit is to comply with the regulations of the state control and supervision authorities
# 001902906869
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to confirm the facts stated in the appeal for taking measures to eliminate violations of the legislation of the Russian Federation in the field of industrial waste management dated 01072019 Reg O697 on the basis of subparagraph "a" of paragraph 2 of Part 2 of Article 10 of the Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the implementation of State Control Supervision and Municipal Control" motivated presentation by the Deputy Head of the Magnitogorsk Territorial Department of the Ural Office of Rostechnadzor V.G. Shatokhin dated 19072019 on the need for an unscheduled on-site inspection
# 001902674952
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902554213
Unscheduled inspection
Start date: 2019-04-02, end date: 2019-04-03, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 26112018 H5909, the deadline for which has expired. The objectives of this inspection are to take measures to control the elimination of violations specified in paragraphs 7 to 10 of the instruction dated 26112018 H5909. The subject of this inspection is the fulfillment of the instructions of the state control and supervision authorities
# 001902571050
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-03-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 22112018 H650, the deadline for which has expired 62 The objectives of this inspection are to take measures to control the elimination of violations specified in the instruction dated 22112018 H650 7 The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies
# 001902437779
Unscheduled inspection
Start date: 2019-01-14, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902436843
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-31, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of previously issued regulations dated 09062018 H19872 dated 28092018 H4589 the deadline for which has expired 62 The objectives of this audit are to implement measures to control the elimination of violations specified in the regulations dated 09062018 H19872 dated 28092018 H4589 7 The subject of this audit is the fulfillment of the regulations of the state control and supervision authorities
# 001800795212
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-28, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of previously issued regulations from 09062018 H19871 from 28042018 H1588 the deadline for which has expired the fulfillment of the regulations of the state control and supervision authorities
# 001800795875
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001801512948
Unscheduled inspection
Start date: 2018-09-05, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800554809
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-08-09, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the fulfillment of the previously issued instruction from 250-42018 H1824, the deadline for which has expired. The task is to take measures to monitor the elimination of violations specified in paragraphs 1 to 4 of the instruction from 250-42018 H1824. The subject is to comply with the instructions of the state control and supervision authorities
# 021800537790
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-08-10, duration: —
Authority: YUzhnoUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Control of the execution of regulation 336BAV from 25082017 Compliance with the regulations of state control bodies
# 001800507167
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 28022018 Cb13341 dsp, the deadline for which has expired. 62 The objectives of this inspection are to take measures to control the elimination of violations specified in the instruction from 28022018 Cb13341 dsp
# 001800244962
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-03-28, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to issue a permit for the commissioning of power plants, the objectives of the inspection are to carry out an unscheduled on-site inspection of the technical condition and safe operation of electrical installations. The subject of this inspection is the compliance of the information contained in the application and documents of the legal entity
# 001800182182
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-03-07, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of power plants based on the application of the chief power engineer of MMK PJSC Khlystov UA ex UGE300153 dated 08022018 HH 1721 dated 09022017. The objectives of this inspection are to carry out measures to monitor the technical condition and safe operation of the external heating network of the heating point heating supply ventilation systems of the chemical capture and processing shop The subject of this audit is the compliance of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if an appropriate unscheduled audit of a legal entity or individual entrepreneur is provided for by the rules for granting the legal status of a special permit license the issuance of permits, the coordination of mandatory requirements, as well as data on the specified legal entities and individual entrepreneurs contained in the unified State register of legal entities, the unified State Register of individual entrepreneurs and other federal information resources
# 001800046024
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that 61 This inspection is carried out in order to issue a permit for the commissioning of power plants based on the statements of the Deputy Chief Power Engineer of MMK PJSC ex dated 24012018 UGE300073 vh Ch871 dated 24012018 ex dated 25012018 UGE300083 vh Ch1049 dated 26012018 62 The objectives of this inspection are to carry out an unscheduled on-site inspection of the technical condition and safe operation of electrical installations of electrical equipment of cells 2 34 RU6 kV departments 2 CPASH GOP and KTP car dumpers 5 CPASH electrical equipment of ANGC 3 LPTS11 MMK PJSC Magnitogorsk Kirova street 93
# 001800085139
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-27, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants based on the application of the chief power engineer of the exc UGE301004 dated 29.012018 ex H 1194 dated 30012017 62 The objectives of this audit are to carry out measures to monitor the technical condition and safe operation of the external heating network of the heating point of the supply ventilation systems of the MMK sheet rolling mill 7 The subject of this audit is the compliance of the information contained in an application and documents of a legal entity or individual entrepreneur for granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on the specified legal entities and individual entrepreneurs contained in the unified State Register of Legal Entities, the unified State Register of Individual Entrepreneurs and other federal information resources
# 001800060440
Unscheduled inspection
Start date: 2018-02-02, end date: 2018-02-27, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: The purpose is to verify the report on the elimination of identified inconsistencies with the accreditation criteria submitted by a letter from Magnitogorsk Iron and Steel Works Public Joint Stock Company dated 23012018 ex GD30014 bx 69 dated 29012018 tasks to establish the fact that an accredited person eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence from 26122017 3585604AS as amended from 31.012018 245104AS subject to compliance with mandatory requirements and or requirements established by municipal legal acts
# 001800007685
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: commissioning of thermal power plants
# 00170803037633
Unscheduled inspection
Start date: 2017-12-26, end date: 2018-01-30, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: The purpose of the audit is to verify the report on the elimination of identified inconsistencies with the accreditation criteria submitted by a letter from Magnitogorsk Iron and Steel Works Public Joint Stock Company dated 22122017 exx LOS310122 vx 694 dated 25122017. The objectives of this audit are to establish the fact that an accredited person has eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results of state support competence assurance services from 30112017 3321404AC The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 00170802986089
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants based on the application of the Deputy Chief Power Engineer of PJSC MMK Danilenko VG ex UGE302314 dated 28122017 VH H 16857 dated 29112017
# 00170802852341
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802638675
Unscheduled inspection
Start date: 2017-10-04, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802767792
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to issue a permit for the commissioning of power plants based on statements by Deputy Chief Power Engineer of MMK PJSC Danilenko VG ex UGE302073 dated 03102017 vh h 13767 dated 03102017 62 The objectives of this inspection are to carry out an unscheduled on-site inspection of the technical condition and safe operation of the electrical installation electrical equipment of substation 11 of the workshop of power grids and substations of MMK PJSC The first stage is the starting circuit
# 00170802797762
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-10-31, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 1 This inspection is carried out in order to issue a permit for the commissioning of power plants based on the application of the Deputy Chief Power Engineer of MMK PJSC Danilenko VG ex UGE302121 dated 12102017 VH H 14330 dated 13102017 2 The objectives of this inspection are to carry out an unscheduled on-site inspection of the technical condition and safe operation of the electrical power supply installation of the construction site of oxygen block 5 of MMK PJSC
# 00170802034445
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-27, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of p 14 of the regulation H1723dsp from 07072017
# 00170801950627
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to issue a permit for the commissioning of the power plant based on the statements of the Deputy Chief Power Engineer of MMK PJSC ex UGE301706 dated 03082017 ex h11045 dated 08082017 ex UGE301707 dated 03082017 ex h11046 dated 08082017 ex UGE301794 dated 17082017 ex h11514 dated 17082017
# 00170701895075
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-15, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to comply with Rostechnadzor Order No. 15032017 85 "On inspections of organizations operating tower cranes" based on instructions from Deputy Prime Minister of the Russian Federation AG Khloponin dated 8022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating Tower cranes from 2017 to 2019"
# 00170701870575
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-08-11, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to monitor the technical condition and safe operation of the electrical installation 5TP1 KL 10 kV KL 6 kV electrical equipment 04 kV Smoke extraction equipment ALD DP 9 13TP1 KL 10 kV KL 6 kV electrical equipment 04 kV Smoke extraction equipment ALD DP 10 Blast furnace shop of PJSC MMK located at Magnitogorsk ul. Kirova 93
# 00170701843681
Unscheduled inspection
Start date: 2017-08-09, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701822245
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-07-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of the power plant based on the application of the Chief Power engineer of MMK PJSC ex UGE301557 dated 03072017 vh h9770 dated 06072017 The objectives of this inspection are to carry out measures to monitor the technical condition and safe operation of electrical installations of substation 23J of outgoing 10 kV cable lines of electric lighting EP1 EP2 EP3 with 1004 kV ANGTS 3 transformers LPC 11 of MMK PJSC at 93 Kirova Street, Magnitogorsk
# 00170701785055
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-07-28, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the fulfillment of the prescription for the elimination of violations
# 00170701822310
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-21, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants based on the application of the Deputy Chief Power Engineer of MMK PJSC ex UGE301568 dated 05072017 ex h9760 dated 06072017
# 00170701701432
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the previously issued prescription from 09032017 Sv148r, the deadline for which has expired
# 00170701760093
Unscheduled inspection
Start date: 2017-06-29, end date: 2017-06-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to monitor the technical condition and safe operation of electrical gas purification equipment DSPA 32 ESPC PJSC MMK at 93 Kirova St. Magnitogorsk
# 00170701701268
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-08, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of the power plant on the basis of an application from the Chief Power Engineer of MMK OJSC, ex UGE301249 dated 17052017 vh ch7293 dated 17052017. The objectives of this inspection are to take measures to monitor the technical condition and safe operation of the 10 kV cable line of the EP2T4 transformer of the EP2SH4 ANGTS3 LPTS11 shield of MMK OJSC at Magnitogorsk Kirova street, 93
# 00170701675824
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-09, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to monitor the technical condition and safe operation of electrical equipment 6 kV TP ST "Rudnaya" 10 kV Transformer 1 TP ST "Fuel" of the Locomotive Workshop High-voltage switch f5A20 PS 5A of the Central Heating Plant of OJSC MMK located at 455002 Chelyabinsk region Magnitogorsk Kirova street d 93
# 00170701663895
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-05-31, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of power plants on the basis of an application from the Chief Power Engineer of OJSC MMK, ex UGE301219 dated 12052017 ex h7139 dated 15052017
# 00170701536443
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the implementation of the previously issued regulations H1723dsp dated 27.012017 on the elimination of identified violations, the deadline for which has expired, the objectives of this audit are to implement measures to control the elimination of violations specified in paragraphs 12 of the regulation H1723dsp dated 27.012017 The subject of this audit is to comply with the regulations of the state control and supervision authorities
# 00160701209744
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the points of the previously issued instruction on the elimination of identified violations
# 02160701280930
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-29, duration: —
Authority: Ministerstvo lesnogo hozyaistva Respubliki Bashkortostan
Purpose of inspection: The purpose is to ensure compliance with forest legislation and to monitor the implementation of the previously issued regulation 20HA of 090916 on the elimination of identified violations of the requirements of forest legislation established during a routine check of the task assessment of compliance with the mandatory requirements of forest legislation and regulatory legal acts in the field of forest relations of the forest user in terms of the previously issued regulation
# 00160701128307
Unscheduled inspection
Start date: 2016-11-11, end date: 2016-12-08, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: verification of the report on the elimination of inconsistencies with the accreditation criteria submitted by the letter of Magnitogorsk Iron and Steel Works Open Joint Stock Company dated 08112016 ex ZGPR30338 BX 981 dated 10112016 ensuring compliance with the requirements of the legislation of the Russian Federation in the field of accreditation, including Federal Law No. 412 FZ dated 28122013 "On Accreditation in the National Accreditation System"Order of the Ministry of Economic Development of the Russian Federation No. 326 dated 30052014 "On approval of the criteria for accreditation of the list of documents confirming the applicant's compliance with the accredited person's accreditation criteria and the list of documents in the field of standardization, compliance with the requirements of which by applicants accredited persons ensures their compliance with the accreditation criteria"compliance with mandatory requirements or requirements established by municipal legal acts
# 00160700603327
Unscheduled inspection
Start date: 2016-09-20, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the fulfillment of a previously issued prescription
# 00160700052073
Unscheduled inspection
Start date: 2016-08-24, end date: 2016-08-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of MMK's compliance with the points of the previously issued instruction dated 04/122015 H5423, the deadline for which has expired
# 00160601680773
Unscheduled inspection
Start date: 2016-06-21, end date: 2016-07-14, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: verification of the report on the elimination of inconsistencies with the accreditation criteria submitted by the letter of the Magnitogorsk Iron and Steel Works Open Joint Stock Company dated 14062016 exx LOS310065 vx 402 dated 16062016
# 00160601589917
Unscheduled inspection
Start date: 2016-05-04, end date: 2016-05-05, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment by OJSC MMK of the points of the previously issued instruction on the elimination of identified violations dated 26112015 H32917, the deadline for which has expired
# 00160601589946
Unscheduled inspection
Start date: 2016-04-21, end date: 2016-04-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment by OJSC MMK of the points of the previously issued instruction on the elimination of identified violations dated 04122015 H5423, the deadline for which has expired
# 00160601498325
Unscheduled inspection
Start date: 2016-02-25, end date: 2016-03-04, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment by OJSC MMK of the points of the previously issued instruction on the elimination of identified violations dated 04122015 H5423, the deadline for which has expired
# 00160601474260
Unscheduled inspection
Start date: 2016-02-02, end date: 2016-02-04, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the fulfillment of the prescription
# 00160601459239
Unscheduled inspection
Start date: 2016-01-20, end date: 2016-01-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment by OJSC MMK of the points of the previously issued instruction on the elimination of identified violations dated 04122015 H5423, the deadline for which has expired
# 00150601333936
Unscheduled inspection
Start date: 2015-11-17, end date: 2015-11-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment by OJSC MMK of the points of the previously issued instruction on the elimination of identified violations
# 00150601278209
Unscheduled inspection
Start date: 2015-10-19, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Assessment of OJSC MMK's compliance with the mandatory requirements of legislative, regulatory and technical documents based on the message from LLC United Service Company bn dated 14102015 about an accident in the LPC4 of OJSC MMK with a mechanic F
# 00150600047125
Unscheduled inspection
Start date: 2015-08-25, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00150600043907
Unscheduled inspection
Start date: 2015-07-14, end date: 2015-07-15, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the fulfillment of a previously issued prescription
# 00150600021651
Unscheduled inspection
Start date: 2015-07-14, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the previously issued regulation P28553H32912 from 20032015
# 742201503908
Unscheduled inspection
Start date: 2022-01-21, end date: 2022-02-03, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the roof of the building of the 2500 g.p. M-K-P axis 144-178 at the end of the work, on the installation of the wall fence of the building of the 2500 g.p. row T axis 144-168 at the end of the work. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742201533601
Unscheduled inspection
Start date: 2022-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742201503830
Unscheduled inspection
Start date: 2022-01-26, end date: 2022-02-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of monolithic overpasses, sections 1,2,3,4 (during the production process); the construction of a clay castle (at the end of the work); filling of slag pits with crushed blast furnace slag, the installation of technological passages (during the production process); the installation of a booster pumping station (during the production process); drainage pumping stations, pressure pipeline from drainage pumping stations to pumping stations (during the course of work); installation of a CTP in a block-modular building (during the course of work); installation of power supply networks for drainage pumps, pumping stations, installation of cable overpasses (during work); installation of access railway tracks (upon completion of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742201503858
Unscheduled inspection
Start date: 2022-01-26, end date: 2022-02-08, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundations of buildings and structures during the construction process: pumping circulating water supply unit No. 1 (104), ammonia columns of unit No. 1 (106) with pumping station, pit and platform, BHU technological building (116), silt compactor (120), pumping silt (124), RU building-10 kV (125), a circulating water pumping station, a cooled water tank, a site for heat exchange equipment of the BHU (126-128), a perhydrol dosing building (129); installation of enclosing structures of buildings and structures during construction: a building for pre-treatment of BHU (115), an aerotank (117) and the building materials used during construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742201503938
Unscheduled inspection
Start date: 2022-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742201533578
Unscheduled inspection
Start date: 2022-01-17, end date: 2022-01-28, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742201533756
Unscheduled inspection
Start date: 2022-01-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101375005
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101420831
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-12-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of gas purification equipment and pipelines behind converters No. 1,2,3. Installation of HF gas purification equipment and pipelines and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which the requirements energy efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101436298
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on concreting the cooling tower elements (at the end of the work), screed installation on the bottom of the cooling tower (at the end of the work), waterproofing of the inner surfaces of the cooling tower (at the end of the work), and installation of metal structures of supports, fences, platforms and decking (during the work), installation of the cooling tower and pipe strapping (in during the production process), installation of cables and cabinet equipment (during the production process). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101312916
Unscheduled inspection
Start date: 2021-11-11, end date: 2021-11-24, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101338814
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed to verify compliance with sanitary and epidemiological requirements and fire safety, landscaping of the territory near the ABC and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101244586
Unscheduled inspection
Start date: 2021-11-16, end date: 2021-11-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on concreting the elements of the cooling tower (during the production process), screed installation on the bottom of the cooling tower (during the production process), waterproofing of the inner surfaces of the cooling tower (during the production process). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 022101301322
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: for the purpose of: by notification No. 2 dated October 26, 2021. on the completion dates of the works to be checked (foundation, columns, installation of the building frame in axes 1/0-7 rows A/0-G, Installation of the floor covering of the first floor from profiled sheet in axes 1-7, reinforcement of the floor covering of the first floor in axes 1-7), bx. No. 28423 dated October 26, 2021--the objectives of this inspection are: identification, prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation.--compliance with mandatory requirements or requirements established by municipal legal acts;
# 742101223944
Unscheduled inspection
Start date: 2021-10-28, end date: 2021-11-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work performed to verify compliance with sanitary and epidemiological requirements and fire safety, Contact network: installation of anchor cables, rolling out of the supporting cable, rolling out of the contact wire, installation of a semi-compensated chain suspension, installation of a voltage limiter. Electrical centralization: installation, installation and connection of floor equipment - upon completion of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101245334
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of supporting structures of the hydraulic fracturing plant during construction; installation of gas pipelines in the MMK hydraulic fracturing area, from MMK hydraulic fracturing to GRSZ, from CHP to MMK hydraulic fracturing plant (installation of foundations, supporting structures, pipeline) during construction and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101223990
Unscheduled inspection
Start date: 2021-10-27, end date: 2021-11-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a transformer substation and the separation of projects: M 32927.01-EN2, EM1, EM2, EM6, EM7, EM8 and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code. The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction, which are not covered by energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100771334
Unscheduled inspection
Start date: 2021-09-30, end date: 2021-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the construction of railway tracks and stations 3,4 stage: installation of trans-shipment railway tracks of station No. 14.15, railway exits, lane R65 M1/7 - 6 pcs., installation of a cul-de-sac No. 2, lane R65 M1/7 - 1 pc. Contact network: the grounding of supports and building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100520389
Unscheduled inspection
Start date: 2021-09-08, end date: 2021-09-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the layout of the territory around the storage tank (at the end of work), the transfer and strengthening of engineering networks (at the end of work), the installation of a pile foundation (during work), the installation of monolithic overpasses, protection with heat-resistant materials (during work), the installation of a clay castle (during work), the filling of slag blast furnace slag pits, the installation of technological passageways (in the process of work), the installation of a booster pumping station (in the process of work), drainage pumping stations, a pressure pipeline from drainage pumping stations to a pumping station (in the process of work), the installation of a KTP in a block-modular building (in the process of work), the installation of power supply networks for drainage pumps, pumping station, installation of cable trestles (in the process of work), retrofitting of the existing KTP (in the process of work), installation of access railway tracks (in the process of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100637963
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-10-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on reinforcement of the bottom, walls, columns and floors of the cooling tower with the installation of embedded parts (at the end of the work), concreting of the cooling tower elements (during work), screed installation on the bottom of the cooling tower (during work), waterproofing of the inner surfaces of the cooling tower (during work), manufacture and installation of metal structures of supports, fencing, platforms and decking (in the process of work), installation of a cooling tower and pipe strapping (in the process of work), installation of cable and cabinet equipment (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100848568
Unscheduled inspection
Start date: 2021-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100554683
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-09-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed to verify compliance with sanitary and epidemiological requirements and fire safety issues and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100554652
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-09-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of metal structures for gas purification, the installation of wall fencing and roofing behind converters No. 1,2,3; installation of metal structures, the installation of wall fencing and roof for gas purification and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of the article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (except for with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100796277
Unscheduled inspection
Start date: 2021-09-21, end date: 2021-09-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on gas purification DSP1: excavation (in the process of work); installation of piles for smoke pumps and fencing of the filter and smoke pumps (in the process of work); installation of foundations for filter supports (in the process of work); installation of foundations for built-in premises (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100435506
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100503959
Unscheduled inspection
Start date: 2021-08-10, end date: —, duration: —
Authority: Upravlenie arhitektury i gradostroitelstva administracii Magnitogorskogo gorodskogo okruga
Purpose of inspection:
# 742100384600
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-08-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on dismantling, the installation of a crushed stone base with a base under the bowl of the cooling tower, reinforcement of the bottom, walls, columns and the ceiling of the cooling tower with the installation of embedded parts (during work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100492456
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100301176
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100302863
Unscheduled inspection
Start date: 2021-07-06, end date: 2021-07-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work carried out on the layout of the territory around the storage unit (during work), the transfer and strengthening of engineering networks (during work), the installation of a pile foundation (during work), the installation of a clay castle (during work), the filling of slag pits with crushed blast furnace slag, the installation of technological passageways (during work), installation of a booster pumping station (during work), installation of power supply networks for drainage pumps, pumping station, installation of cable trestles (during work) and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code. The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction, which are not covered by energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100306021
Unscheduled inspection
Start date: 2021-07-07, end date: 2021-07-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of pipelines and wells of water supply and sewerage networks according to projects M 32927.01-NVK, M 32927.02-NVK, installation of railway tracks and construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100306047
Unscheduled inspection
Start date: 2021-07-07, end date: 2021-07-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the facades of the building, installation of sewage pipelines, ventilation, installation of electrical networks of the RMU. Interior decoration, installation of electrical networks PARA. Installation of metal structures, installation of facades, installation of electrical networks, installation of sewer pipelines, ventilation of the welding site, installation of electrical networks of the KTP. General construction works, installation of electrical networks, installation of sewage pipes, ventilation of a tire warehouse. Fencing, landscaping and construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100306070
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: