# 002004409069
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to carry out state construction supervision during the construction of the specified capital construction facility in connection with the notification received from 06052020 1 bx 36116355 from 30042020 on the completion of the construction of the capital construction facility 6 The subject of this inspection is 1 verification of the compliance of the work and the construction materials used during the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources.2 verification of the availability of a construction permit.3 verification of compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.