# 422201548613
Unscheduled inspection
Start date: 2022-01-14, end date: 2022-02-10, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: verification of the compliance of the performed works and the applied building materials and products during the construction process, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used by the completed capital construction facility, determining the compliance of the constructed capital construction facility with the requirements of the design documentation, including requirements regarding energy efficiency and requirements regarding the equipment of a capital construction facility with metering devices for used energy resources., compliance with mandatory requirements of the legislation of the Russian Federation on urban development.
# 422201562926
Unscheduled inspection
Start date: 2022-01-17, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation
# 422101406843
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the implementation of Regulation No. 05-18-19-12 dated 10/26/2021, by 11/30/2021.
The purpose of this audit is to verify the elimination of violations committed by B-24 LLC during the construction of the BELAZ Technical Support Center capital construction facility at the address: Kemerovo region, Belovsky City District, village. Gramoteino, st. Kuznetsky tract, 2. Correction of project documentation. Stage 1", located at the address: Kemerovo region, Belovsky city district, village. Gramoteino, st. Kuznetsky tract, 2.
# 422100662841
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during construction
# 422100218296
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: purpose, subject: verification of the execution of Regulation No. 05-18-19-11 dated 04/09/2021 the deadline for the execution of the regulation expired on 05/06/2021.
The purpose of this audit is to verify the elimination of violations committed by BELAZ-24 LLC during the construction of the BELAZ Technical Support Center capital construction facility at the address: Kemerovo region, Belovsky City District, village. Gramoteino, st. Kuznetsky tract, 2", located at the address: Kemerovo region, Belovsky city district, village. Gramoteino, st. Kuznetsky tract, 2.
# 422100078552
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: purpose, subject: verification of the conformity of the work performed, the construction materials used in the process of work in the warehouse building on the installation of internal utility networks for sewerage and plumbing of built-in premises; interior finishing work in axes 1-2, in the production building - installation of an automatic fire extinguishing system, in the ITO building - installation of OPS; installation of fire-fighting water supply, PNS, backfilling, collapsing of tanks; installation of enclosing structures of the built-in ABC in the PC building, electrical panel to the requirements of the design documentation, verification of compliance with the requirements of parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
Tasks: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility.
# 422005196378
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-10-29, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the fulfillment of the inspection instruction 05181907 from 18082020 the task is to verify the elimination of violations during construction the subject is the fulfillment of the inspection instruction 05181907 from 18082020
# 422004473801
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:
# 422004407667
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 422004406575
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 422004349748
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 422004349742
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-03-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of the fulfillment of the inspection instruction 05181903 dated 31.012020 task verification of the elimination of violations during construction subject to the fulfillment of the inspection instruction 05181903 dated 31.012020
# 422004202281
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-01-31, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the conformity of the work performed with the construction materials used during the construction of on-site engineering networks, including drainage sewers K13 production sewers K3 in the building of the production building for the installation of metal structures and sandwich panels in the ABC building for the installation of a monolithic frame for the foundations of the entrance group of monolithic reinforced concrete walls and the overlap of the technical underground for the installation of metal structures sandwich panels of the building warehouse
# 421904071671
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 421903905268
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: