# 772005213510
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is the fulfillment by the developer of the requirements of part 31 of Article 52 of the Urban Planning Code. The compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision
# 502004169503
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-20, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: State supervision over the Operation of High-level Real Estate Law of the Moscow Region dated 13042006 542006OZ On the Procedure for the Operation of Non-Residential Buildings and Structures in the Territory of the Moscow Region and Administrative responsibility in the field of their Technical operation