Found 274 inspections:

# 002005250115
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction of the bush site 22 stage 2 Soldering of the overhead line 10 kV at KP 22 from overhead line 10 kV at KP 21 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005250085
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction 10 kV from ZRU10 kV DNS1 to tvr3 stage 1 VL10 kV from ZRU10 kV DNS1 to tvr3 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005250075
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction of a cluster site 23 stage 2 overhead line 10 kV at KP 23 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement During the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005257566
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005243237
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005230117
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field Stage 1 cipher 1319 Construction of oil-collecting pipelines lupings increase in capacity Stage 2 Jumper 2 Oil and gas pipeline tvrK21 tvrK4 looping" The objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies


# 002005230106
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1 cipher 1319 Construction of a cluster site, Stage 22, Stage 3 Oil and gas pipeline from KP22 to tK21 1". The purpose of this audit is to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005230101
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005254625
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005243228
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of oil collection pipelines lupings increase in capacity stage 6 Oil and gas pipeline K21 tvrK21 luping " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations other regulatory legal acts project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005230130
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005230122
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of oil collection pipelines lupings increase in capacity stage 2 Jumper 2 Oil and gas pipeline tvrK21 tvrK4 luping" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005202536
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005196548
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005228303
Unscheduled inspection
Start date: 2020-11-26, end date: 2020-12-04, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement for the full development of the Verkhneshapshinsky deposit Bushes of wells 1 bis 6 bis code 08915 Bush of wells 1bis 6 stage of construction Arrangement of well 11 injection with development with engineering support networks Arrangement of water intake well B31 with engineering support networks Comb block High-pressure water pipeline from KP 1bis to KP 1 with connection to the PPD KP1 system" on the basis of a termination notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005206099
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit, stage 1 cipher 1319 Construction of a cluster site 24, stage 2 of the overhead line 10 kV at KP24". The objectives of this inspection are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005146108
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit Stage 1 cipher 1319 Construction of overhead line 10 kV from ZRU10 kV DNS1 to tvr3 stage 1 overhead line 10 kV from ZRU10 kV DNC1 to tvr3" The objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005146107
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit, Stage 1 cipher 1319 Construction of a cluster site, stage 23, stage 2, overhead line 10 kV at KP 23". The objectives of this audit are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005181586
Unscheduled inspection
Start date: 2020-11-06, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005221277
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005221139
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated October 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002005225427
Unscheduled inspection
Start date: 2020-11-13, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004451399
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004488588
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-09-07, duration: 13
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6 code 06916 Construction of the bush site 6 2nd stage of construction of the Otpaika VL6kV on KP 6 from VL6kV on KP 3" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004481050
Unscheduled inspection
Start date: 2020-08-12, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004481032
Unscheduled inspection
Start date: 2020-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 002004479543
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Saratovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to comply with the prosecutor's requirement to conduct an unscheduled audit in the framework of supervision of the implementation of laws on materials and appeals received by the prosecutor's office bx 648466420I dated 09072020 The objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms ensuring compliance with and protection of labor rights and freedoms of citizens7 The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 002004451425
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-22, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the bush site 23, stage 2 of the 10 kV overhead line at KP 23" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement During the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451893
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1" Construction of oil-collecting pipelines lupings increase in capacity stage 2 Jumper 2 Oil and gas pipeline TVR K21 TVR K4 luping " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451854
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1" Construction of oil collection pipelines lupings increase in capacity stage 6 Oil and gas pipeline K21 tvr K21 luping " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451818
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1"Construction of the cluster site 22, Stage 3 Oil and gas pipeline from KP22 to t K21 1 " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation requirements and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451836
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1"Construction of the cluster site 23, Stage 3 Oil and gas pipeline from KP23 to t K22 1 " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation requirements and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004431151
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated June 1, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004431146
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated June 1, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004396081
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinskoye field stage 1" Construction of oil collection pipelines looping increase in capacity stage 2 Jumper 2 Oil and gas pipeline TVR K21 TVR K4 looping for compliance of work and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work requirements technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources. verification of the completed construction of the capital construction facility " " based on the notice of completion of the construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement efficiency in the construction of a capital construction facility construction permit compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396073
Unscheduled inspection
Start date: 2020-05-06, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004396061
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky field Stage 1" Construction of the bush site 22 stage 3 Oil and gas pipeline from KP22 to t K21 1 for compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the completed construction of the capital construction facility " " based on the notice of completion of the capital construction facility in order to monitor the compliance of the work performed with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of the facility capital construction permits for the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396057
Unscheduled inspection
Start date: 2020-05-06, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004396008
Unscheduled inspection
Start date: 2020-05-06, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004391876
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391857
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004396051
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky deposit stage 1" Construction of the bush site 23 stage 2 of the 10 kV overhead line at KP 23 for compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources. verification of a completed capital construction facility " " based on a notice of completion of construction of a capital construction facility in order to monitor compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during construction of a capital construction facility permits for the construction of meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396048
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky deposit stage 1" Construction of the bush site 24 stage 2 overhead line 10 kV at KP24 compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy requirements efficiency and equipment requirements of the capital construction facility with metering devices for used energy resources available verification of the completed construction of the capital construction facility " " based on the notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396043
Unscheduled inspection
Start date: 2020-05-12, end date: —, duration:
Authority:
Purpose of inspection:


# 002004396017
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky deposit stage 1" Construction of the bush site 24 stage 2 overhead line 10 kV at KP24 compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy requirements efficiency and equipment requirements of the capital construction facility with metering devices for used energy resources available verification of the completed construction of the capital construction facility " " based on the notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004393346
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391736
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391800
Unscheduled inspection
Start date: 2020-05-13, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004391767
Unscheduled inspection
Start date: 2020-05-13, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004400847
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-21, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of the completed construction of the capital construction facility "Arrangement for the full development of the Verkhneshapshinsky field Bushes of wells 1 bis 6 bis" Bush of wells 1 bis 6 stage of construction Arrangement of well 11 injection with development with engineering networks Arrangement of water intake well B31 with engineering networks Comb block High-pressure water pipeline from KP 1 bis to KP 1 with connection to the system PPD KP1 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004400839
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6" Development of the bush site 6 2 stage of construction of the Unpacking of overhead line 6 kV at KP 6 from overhead line 6 kV at KP 3 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement in During the construction of a capital construction facility, the objectives of this inspection are prevention, detection and suppression


# 002004344524
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Facilities for the development of the Verkhneshapshinsky field"DNS1 with the oil treatment unit UPN stage 3 construction" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility Objectives of this inspection The purpose of this audit is to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of permits for the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004381994
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 16, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004382070
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 16, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004382045
Unscheduled inspection
Start date: 2020-04-01, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004361372
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-17, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Verkhneshapshinsky field development for full development Bush site 35 code 1263 1st stage oil and gas pipeline k35 tvrk34 VL10 kV ZRU10 kV DNS1 KTP K35 access road to the bush site engineering preparation of the bush site KTP pos 81 electrical equipment site pos 91 reagent dosing unit pos 7 measuring unit item 31 hardware block item 41 drainage tank with a volume of 80 m3 item 61 lightning rod item 111 searchlight mast item 101 production well 1 serial number in the course of the drilling rig movement VAT compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy requirements efficiency and equipment requirements of the capital construction facility with metering devices for used energy resources available verification of the completed construction of the capital construction facility " " on the basis of a notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004344750
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the cluster site 23, Stage 3 Oil and gas pipeline from KP23 to t K22 1 Project code 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004344729
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the cluster site 22, stage 3 Oil and gas pipeline from KP22 to t K21 1 Project code 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004306893
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated February 13, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004306771
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated February 13, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004306707
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 10 dated February 13, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004258467
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice No. 5 dated January 22, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004367125
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-11, duration: 7
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the compliance of the completed works with the design documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility


# 002004344620
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinskoye field, stage 1"Construction of oil-collecting pipelines, louping, capacity increase, stage 2 Jumper 2 Oil and gas collecting pipeline TVR K21 TVR K4 luping Cipher project 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004344704
Unscheduled inspection
Start date: 2020-03-18, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004344664
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the program of inspections for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of oil-collecting pipelines, looping, capacity increase, stage 10 Looping UZ 3 KP15 DNS1 Verkhneshapshinsky mr Cipher project 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit , and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004332827
Unscheduled inspection
Start date: 2020-03-12, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004332855
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-04-09, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6" Construction of the bush site 6 3rd stage of construction oil and gas pipeline from KP 6 to TVR KP 3" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004258389
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004258429
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004258412
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of completion notice No. 620 dated January 22, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004258315
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004258365
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of completion notice 420 dated January 22, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004285558
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 8 dated February 03, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004285506
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated February 03, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004113549
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903746540
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-27, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the previously issued regulation No. 58126P dated March 5, 2019. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts


# 001902902406
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of PJSC NK RussNeft on the completion of the construction of a capital construction facility dated 17042019 81 bx 41314315 dated 12072019. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including design activities, committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor Documentation


# 001902765614
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902675712
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of PJSC NK RussNeft on the completion of the construction of the capital construction facility dated 17042019 61 bx 4138910 dated 17042019. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including design activities, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor Documentation


# 001801593600
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-26, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 10 dated September 10, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800829251
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829241
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829218
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829199
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800529664
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed capital construction facility Development of the Kondinsky field Bushes 4 6 and communication corridors code 8535 Bush wells 6 Stage 39 In order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources availability building permits to comply with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code


# 001800528361
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800529380
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva «Obustroistvo skvazhin kusta 80 81 Potochnogo mestorozhdeniya shifr 02200 Kusty skvazhin 80 81 Potochnogo mestorozhdeniya Kust skvazhin 81 5 etap stroitelstva obustroistvo skvazhin 41 42 43 44 s podklyucheniem ih k AGZU montazh tehnologicheskih truboprovodov stroitelstvo elektrotehnicheskoi i KA estakady» S celyu kontrolya sootvetstviya vypolnennyh rabot obyazatelnym trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov proektnoi dokumentacii trebovaniyam po energosberezheniyu i povysheniyu energeticheskoi effektivnosti pri stroitelstve obekta kapitalnogo stroitelstva zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii normativnyh dokumentov i zakonodatelnyh aktov preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii normativnyh dokumentov i zakonodatelnyh aktov sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 3_1 stati 52 nastoyaschego Kodeksa


# 001800528259
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed capital construction facility Arrangement for the full development of the Verkhneshapshinsky deposit Well bushes 1 bis 6 bis code 08915 Well bush 1 bis 1st stage of construction In order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility the objectives of this inspection are to prevent detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and equipment requirements of the capital construction facility accounting for the energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2, 3, and 3_1 of Article 52 of this Code


# 001800528600
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed, a complex for heating oil and disposing of sediment from biological wastewater treatment at a Sandy deposit In order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this inspection are to prevent identify and suppress violations of mandatory regulatory requirements. documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001800528454
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800438272
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-08-09, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 9 dated May 28, 2018, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800438364
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-08-10, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 8 dated May 28, 2018, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800173655
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 7 dated February 12, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800173524
Unscheduled inspection
Start date: 2018-02-21, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802901854
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802901195
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 5 dated 31/12017


# 00170802901740
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 2 dated 31/12017


# 00170802901413
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 3 dated 31/12017


# 00170802901588
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 4 dated 31/12017


# 00170802803895
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 1 dated 31072017


# 00170802637992
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-16, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the license applicant's compliance with the licensing requirements


# 00170701730000
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-07-19, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: The audit is conducted in order to verify the fulfillment by PJSC NK RussNeft of the previously issued instruction on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 2111016 3676172the objectives of this audit are supervision of compliance with mandatory requirements in the field of geological exploration, rational use and protection of subsurface resources.7 The subject of this audit is the fulfillment by PJSC NK RussNeft of the previously issued instruction on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 2111/2016 3676172


# 00160701035828
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-21, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: Establishment of the threat of environmental damage due to the activities of JSC NK RussNeft on the territory of the Sokolovogorsky subsurface area of Saratov


# 642201665784
Unscheduled inspection
Start date: 2022-02-28, end date: —, duration:
Authority: Volzhskoe mezhregionalnoe territorialnoe upravlenie po nadzoru za yadernoi i radiacionnoi bezopasnostyu Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 732101353351
Unscheduled inspection
Start date: 2021-11-17, end date: 2021-11-16, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: implementation of the inspection program developed on the basis of the notice of the beginning of construction, reconstruction of the capital construction facility dated 06/24/2021 (item No. 3 of the inspection program dated 06/11/2021 "Inspection of the completed capital construction facility", prevention, identification and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or technical customer violations of legislation on urban development, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts


# 732101242990
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection:


# 732100323807
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 862100326832
Unscheduled inspection
Start date: 2021-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 722100251796
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Inspections of a capital construction facility completed on the basis of completion notice No. 2 dated May 20, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression.


# 722100251853
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration:
Authority:
Purpose of inspection:


# 722100012619
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-28, duration: 18
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the capital construction facility "Verkhne-Shapshinsky field development for full development" code 742.10/2. "Facilities for the development of the Verkhne-Shapshinsky deposit". Stage No. 11 Arrangement of the well cluster No. 13" in order to control the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation and energy efficiency requirements during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 722100012754
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-28, duration: 18
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is being conducted in order to implement the program of inspections for the capital construction facility "Verkhne-Shapshinsky field development for full development. Bush site No. 36"cipher 1270. 1 stage " for the purpose of monitoring the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; fulfillment of the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 642100010924
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-02-17, duration: 5
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: The purpose of the audit is to identify the possibility that the applicant for the license of PJSC NK Russneft fulfills the licensing requirements and conditions when carrying out activities related to the transportation of waste of hazard class II-IV and the disposal of waste of hazard class III-IV (application for granting a license to HC. No. 911 dated 02/01/2021). The subject of the audit is the availability and compliance of buildings, structures, facilities, and vehicles with the established requirements that are expected to be used by the license applicant in carrying out the licensed type of activity for the transportation of waste of hazard class II-IV, waste disposal of hazard class III-IV, and the availability of workers necessary to carry out the licensed type of activity in order to assess compliance with the licensed requirements. The purpose of the audit is licensing control in accordance with Federal Law No. 99-FZ dated 05/04/2011 "On Licensing Certain Types of Activities", Federal Law No. 294-FZ dated 12/26/2008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control (Supervision) and Municipal Control"


# 002005250115
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction of the bush site 22 stage 2 Soldering of the overhead line 10 kV at KP 22 from overhead line 10 kV at KP 21 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005250098
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction of a cluster site 24 stage 2 of the 10 kV overhead line at KP24 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement when The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005250085
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction 10 kV from ZRU10 kV DNS1 to tvr3 stage 1 VL10 kV from ZRU10 kV DNS1 to tvr3 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005250075
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-14, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction of a cluster site 23 stage 2 overhead line 10 kV at KP 23 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement During the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 732005294268
Unscheduled inspection
Start date: 2020-12-24, end date: 2021-01-28, duration: 20
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program developed on the basis of the notice of completion of construction of the reconstruction of the capital construction facility dated 22122020 item 2 of the inspection program dated 22092020 "Inspection of the completed construction of the capital construction facility" The objectives of this inspection are to prevent identify and prevent the technical customer and the person carrying out construction on the basis of a contract with the developer or the technical customer of violations of legislation on urban planning activities, including project documentation, The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 002005257566
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1 cipher 1319 Construction of a cluster site, Stage 21, Stage 3 Oil and gas pipeline from KP21 to tK21 1 Oil and gas pipeline from TC21 1 to t13 1" The objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005243237
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1 cipher 1319 Construction of oil-collecting pipelines lupings increase in capacity Stage 6 Oil and gas pipeline K21 tvrK21 luping" The objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005230117
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field Stage 1 cipher 1319 Construction of oil-collecting pipelines lupings increase in capacity Stage 2 Jumper 2 Oil and gas pipeline tvrK21 tvrK4 looping" The objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies


# 002005230106
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1 cipher 1319 Construction of a cluster site, Stage 22, Stage 3 Oil and gas pipeline from KP22 to tK21 1". The purpose of this audit is to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005230101
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1 cipher 1319 Construction of a cluster site, Stage 23, Oil and gas pipeline from KP23 to tK22 1". The purpose of this audit is to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 642005268235
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection:


# 002005254625
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted to check the completed capital construction object "Construction of the Eastern part Verhnechirchikskogo field 1 turn the cipher 1319 sectional Construction site 21 stage 3 Neftegazovoy tubing from КП21 to тК21 1 Neftegazovoy tubing from 1 to тК21 T13 1 in accordance with the notice of completion for the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object Objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the Subject of this review is to match the performance of works and construction materials used in the construction process of reconstruction of capital construction object and results such works to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of this Code


# 002005243228
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of oil collection pipelines lupings increase in capacity stage 6 Oil and gas pipeline K21 tvrK21 luping " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations other regulatory legal acts project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005230130
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of the cluster site 23 stage 3 Oil and gas pipeline from KP23 to tK22 1" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005230127
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of the cluster site 22 stage 3 Oil and gas pipeline from KP22 to tK21 1" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005230122
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-15, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of oil collection pipelines lupings increase in capacity stage 2 Jumper 2 Oil and gas pipeline tvrK21 tvrK4 luping" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 642005297230
Unscheduled inspection
Start date: 2020-12-31, end date: —, duration:
Authority:
Purpose of inspection:


# 002005202536
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of oil-collecting pipelines lupings increase in capacity stage 1 Jumper 1 Oil and gas pipeline tvrK4tvrUZA 3 from KP15 luping on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005196548
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field stage 1 cipher 1319 Construction of the cluster site 4 stage 3 From K4 to TVR11 Oil and gas pipelines" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of work performed and construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and facility equipment requirements. capital construction accounting devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005228303
Unscheduled inspection
Start date: 2020-11-26, end date: 2020-12-04, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement for the full development of the Verkhneshapshinsky deposit Bushes of wells 1 bis 6 bis code 08915 Bush of wells 1bis 6 stage of construction Arrangement of well 11 injection with development with engineering support networks Arrangement of water intake well B31 with engineering support networks Comb block High-pressure water pipeline from KP 1bis to KP 1 with connection to the PPD KP1 system" on the basis of a termination notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005221226
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the southeastern part of the Tagrinskoye field Well Cluster 407 Stage 2 Oil and gas pipeline "k407 t BP k407 k411" VL6 kV from PS356 kV "K410" to well cluster 407 Project code 02318 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.


# 002005206099
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit, stage 1 cipher 1319 Construction of a cluster site 24, stage 2 of the overhead line 10 kV at KP24". The objectives of this inspection are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005146109
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit Stage 1 cipher 1319 Construction of a bush site 22 Stage 2 Soldering of overhead line 22 from overhead line 22 At KP 21, the objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005146108
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit Stage 1 cipher 1319 Construction of overhead line 10 kV from ZRU10 kV DNS1 to tvr3 stage 1 overhead line 10 kV from ZRU10 kV DNC1 to tvr3" The objectives of this audit are to verify that a legal entity has eliminated an identified violation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 002005146107
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit, Stage 1 cipher 1319 Construction of a cluster site, stage 23, stage 2, overhead line 10 kV at KP 23". The objectives of this audit are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005181586
Unscheduled inspection
Start date: 2020-11-06, end date: 2020-11-25, duration: 14
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1 cipher 1319 Construction of substation 3510 kV stage 2 substation 3510 kV in the KP23 area of overhead line 35 kV 1103510 kV Verkhneshapshinskaya substation 3510 kV in the KP23 area on the basis of a completion notice in order to monitor the compliance of completed works with mandatory technical requirements The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005221252
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated October 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002005221277
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated October 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002005221139
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated October 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002005225427
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-11-30, duration: 12
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate identified violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development for the full development of the Verkhneshapshinsky deposit Bushes of wells 1 bis 6 bis code 08915 Bush of wells 1bis stage 6 construction Well construction 11 injection with engineering support networks, the construction of a water intake well In combination with engineering support networks, the comb block is a high-pressure water pipeline from KP 1bis to KP 1 with connection to the KP1 PPD system." The objectives of this audit are to verify that the identified violation has been eliminated by a legal entity. The subject of this audit is to comply with the instructions of state control bodies, municipal control bodies


# 732005172948
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-16, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 18092019 item 1 of the inspection program dated 22092020 "Installation of a high-pressure water pipeline" The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer legislation on urban planning activities, including technical regulations and project documentation, The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 002004451399
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the Verkhneshapshinsky field for full development Bush site 35 code 1263 stage 1 oil and gas pipeline k35 tvrk34 VL10 kV ZRU10 kV DNS1 KTP K35 access road to the bush site engineering preparation of the bush site KTP pos 81 electrical equipment site pos 91 reagent dosing unit pos 7 measuring unit pos 31 hardware block pos 41 drainage tank with a volume of 80 m3 pos 61 lightning rod pos 111 searchlight mast pos 101 producing well 1 serial number in the course of the drilling rig's movement VAT" based on the completion notification in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement when The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451404
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Verkhneshapshinsky field code 742102 Facilities of the Verkhneshapshinsky field DNS1 with an oil treatment plant UPN stage 2" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during construction The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and design documentation, including energy efficiency requirements and equipment requirements for the capital construction facility accounting for the energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2, 3, and 3_1 of Article 52 of this Code


# 642004495461
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-08-31, duration: 8
Authority: Glavnoe upravlenie MCHS Rossii po Saratovskoi oblasti
Purpose of inspection: Assessment of the possibility of meeting licensing requirements by Public Joint Stock Company Oil and Gas Company RussNeft, PJSC NK RussNeft, which applied to the Main Directorate of the Ministry of Emergency Situations of Russia in Moscow with an application for a license to carry out activities related to the installation, maintenance and repair of fire safety equipment for buildings and structures order of the Main Directorate of the Ministry of Emergency Situations of Russia in Moscow 19 dated 10082020


# 002004488588
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-09-07, duration: 13
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6 code 06916 Construction of the bush site 6 2nd stage of construction of the Otpaika VL6kV on KP 6 from VL6kV on KP 3" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004481050
Unscheduled inspection
Start date: 2020-08-12, end date: 2020-09-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement for the full development of the Verkhneshapshinsky deposit Well bushes 1 bis 6 bis code 08915 Well bush 1bis 6 construction stage Well construction 11 injection with development with engineering support networks Water intake well B31 with engineering support networks Comb block High-pressure water pipeline from KP 1bis to KP 1 with connection to the PPD KP1 system on the basis of a termination notice, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is compliance the performance of works and construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004481032
Unscheduled inspection
Start date: 2020-08-13, end date: 2020-09-03, duration: 16
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6 code 06916 Construction of the bush site 3 2nd stage of construction of the overhead line 6 kV from the connection point of the KP 2 energy center to KP 3 on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004479543
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Saratovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to comply with the prosecutor's requirement to conduct an unscheduled audit in the framework of supervision of the implementation of laws on materials and appeals received by the prosecutor's office bx 648466420I dated 09072020 The objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms ensuring compliance with and protection of labor rights and freedoms of citizens7 The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 002004451467
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-22, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky deposit stage 1"Construction of overhead line 10 kV from ZRU10 kV DNS1 to tvr3 stage 1 overhead line 10 kV from ZRU10 kV DNS1 to tvr3" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451425
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-22, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the bush site 23, stage 2 of the 10 kV overhead line at KP 23" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement During the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451893
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1" Construction of oil-collecting pipelines lupings increase in capacity stage 2 Jumper 2 Oil and gas pipeline TVR K21 TVR K4 luping " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451854
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1" Construction of oil collection pipelines lupings increase in capacity stage 6 Oil and gas pipeline K21 tvr K21 luping " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451818
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1"Construction of the cluster site 22, Stage 3 Oil and gas pipeline from KP22 to t K21 1 " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation requirements and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451836
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, Stage 1"Construction of the cluster site 23, Stage 3 Oil and gas pipeline from KP23 to t K22 1 " on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation requirements and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451574
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-24, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of oil-collecting pipelines lupings increase in capacity, stage 10 Luping UZ 3 KP15 DNS1" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451540
Unscheduled inspection
Start date: 2020-07-08, end date: 2020-07-21, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the bush site 22, stage 2 Soldering of overhead line 10 kV at KP 22 from overhead line 10 kV at KP 21" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004451513
Unscheduled inspection
Start date: 2020-07-08, end date: 2020-07-21, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the bush site 24, stage 2 of the 10 kV overhead line at KP 24" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement During the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004431151
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated June 1, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004431146
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated June 1, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004431138
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-11, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 32 dated June 1, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004408986
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Verkhneshapshinsky field development facilities" Stage 11 Well cluster 13" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility The objectives of this inspection are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, the implementation of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004429998
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-05-29, duration:
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the compliance of the completed works with the design documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility


# 002004410333
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-24, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of the Nizhneshapshinsky deposit acceptance point code 4118 First stage of construction" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility The objectives of this inspection are prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004396081
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinskoye field stage 1" Construction of oil collection pipelines looping increase in capacity stage 2 Jumper 2 Oil and gas pipeline TVR K21 TVR K4 looping for compliance of work and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work requirements technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources. verification of the completed construction of the capital construction facility " " based on the notice of completion of the construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement efficiency in the construction of a capital construction facility construction permit compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396073
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinskoye field Stage 1" Construction of oil collection pipelines lupings increase in capacity stage 6 Oil and gas pipeline K21 tvr K21 luping for compliance of work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. verification of the completed capital construction facility " " based on the notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during construction a capital construction facility building permit meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396061
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky field Stage 1" Construction of the bush site 22 stage 3 Oil and gas pipeline from KP22 to t K21 1 for compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the completed construction of the capital construction facility " " based on the notice of completion of the capital construction facility in order to monitor the compliance of the work performed with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of the facility capital construction permits for the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396057
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky field Stage 1" Construction of oil-collecting pipelines looping increase in capacity stage 10 Looping UZA 3 KP15 DNS1 Verkhneshapshinsky mp for compliance of work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the completed construction of the capital construction facility " " based on the notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement when during the construction of a capital construction facility, construction permits comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396008
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky field stage 1" Construction of the bush site 23 stage 3 Oil and gas pipeline from KP23 to t K22 1 compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation in including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the completed construction of the capital construction facility " " on the basis of a notice of completion of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits for meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004391832
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391818
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391847
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391891
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391876
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391857
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004396051
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky deposit stage 1" Construction of the bush site 23 stage 2 of the 10 kV overhead line at KP 23 for compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources. verification of a completed capital construction facility " " based on a notice of completion of construction of a capital construction facility in order to monitor compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during construction of a capital construction facility permits for the construction of meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396048
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky deposit stage 1" Construction of the bush site 24 stage 2 overhead line 10 kV at KP24 compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy requirements efficiency and equipment requirements of the capital construction facility with metering devices for used energy resources available verification of the completed construction of the capital construction facility " " based on the notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396043
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility "Development of the eastern part of the Verkhneshapshinskoye field, Stage 1" Construction of the bush site 22, Stage 2, Decoupling of overhead line 10 kV at KP 22 from overhead line 10 kV at KP 21 for compliance with the performance of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the completed construction of the capital construction facility " " based on the notice of completion of the construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and improvement energy efficiency during the construction of a capital construction facility construction permit compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004396017
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Development of the eastern part of the Verkhneshapshinsky deposit stage 1" Construction of the bush site 24 stage 2 overhead line 10 kV at KP24 compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy requirements efficiency and equipment requirements of the capital construction facility with metering devices for used energy resources available verification of the completed construction of the capital construction facility " " based on the notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004393346
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391756
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391736
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391800
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391787
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 26, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004391767
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a notice of completion dated March 26, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004400847
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-21, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of the completed construction of the capital construction facility "Arrangement for the full development of the Verkhneshapshinsky field Bushes of wells 1 bis 6 bis" Bush of wells 1 bis 6 stage of construction Arrangement of well 11 injection with development with engineering networks Arrangement of water intake well B31 with engineering networks Comb block High-pressure water pipeline from KP 1 bis to KP 1 with connection to the system PPD KP1 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004400839
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6" Development of the bush site 6 2 stage of construction of the Unpacking of overhead line 6 kV at KP 6 from overhead line 6 kV at KP 3 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement in During the construction of a capital construction facility, the objectives of this inspection are prevention, detection and suppression


# 002004400833
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-19, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6" Construction of the bush site 3 2nd stage of construction of the overhead line 6 kV from the connection point of the KP 2 energy center to KP 3 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during construction The objectives of this inspection are to prevent detect and suppress the construction of a capital construction facility.


# 002004344524
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Facilities for the development of the Verkhneshapshinsky field"DNS1 with the oil treatment unit UPN stage 3 construction" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility Objectives of this inspection The purpose of this audit is to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of permits for the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004382024
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 16, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004381994
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 16, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004382070
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 16, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004382045
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 16, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004361382
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-17, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts Verkhneshapshinskoye field development facility code 742102 Verkhneshapshinskoye field development facilities DNS1 with UPN oil treatment plant stage 2 compliance of work and construction materials used during construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the completed construction of the capital construction facility " " based on the notice of completion of the construction of the capital construction facility in order to monitor the compliance of the work performed with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility. requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004361372
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-17, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts facility Verkhneshapshinsky field development for full development Bush site 35 code 1263 1st stage oil and gas pipeline k35 tvrk34 VL10 kV ZRU10 kV DNS1 KTP K35 access road to the bush site engineering preparation of the bush site KTP pos 81 electrical equipment site pos 91 reagent dosing unit pos 7 measuring unit item 31 hardware block item 41 drainage tank with a volume of 80 m3 item 61 lightning rod item 111 searchlight mast item 101 production well 1 serial number in the course of the drilling rig movement VAT compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy requirements efficiency and equipment requirements of the capital construction facility with metering devices for used energy resources available verification of the completed construction of the capital construction facility " " on the basis of a notice of completion of construction of the capital construction facility in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility construction permits meeting the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004344750
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the cluster site 23, Stage 3 Oil and gas pipeline from KP23 to t K22 1 Project code 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004344729
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of the cluster site 22, stage 3 Oil and gas pipeline from KP22 to t K21 1 Project code 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004306893
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated February 13, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004306942
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated February 13, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004306771
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated February 13, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004306707
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 10 dated February 13, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004306840
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated February 13, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004258467
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice No. 5 dated January 22, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004367125
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-11, duration: 7
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the compliance of the completed works with the design documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility


# 002004344620
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinskoye field, stage 1"Construction of oil-collecting pipelines, louping, capacity increase, stage 2 Jumper 2 Oil and gas collecting pipeline TVR K21 TVR K4 luping Cipher project 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004344704
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of oil-collecting pipelines lupings increase in capacity stage 6 Oil and gas pipeline K21 TVR K21 luping Cipher project 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004344664
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the program of inspections for the capital construction facility "Development of the eastern part of the Verkhneshapshinsky field, stage 1"Construction of oil-collecting pipelines, looping, capacity increase, stage 10 Looping UZ 3 KP15 DNS1 Verkhneshapshinsky mr Cipher project 1319" in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit , and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004332827
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-04-08, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6" Development of the bush site 3 3rd stage of construction oil and gas pipeline from KP 3 to TVR KP 2" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004332855
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-04-09, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Development of the Sredneshapshinsky field Bush of wells 3 Bush of wells 6" Construction of the bush site 6 3rd stage of construction oil and gas pipeline from KP 6 to TVR KP 3" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002004258389
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated January 22, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004258429
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated January 22, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004258412
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of completion notice No. 620 dated January 22, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004258315
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated January 22, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004258365
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of completion notice 420 dated January 22, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004258349
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of completion notice 720 dated January 22, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 002004285558
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 8 dated February 03, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004285506
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of a completion notice dated February 03, 2020, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and prevent


# 002004113549
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-01-22, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of completion notice No. 2319 dated December 3, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 732004233763
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 731904159473
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-25, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 15102019 bn item of the inspection program "Completion of the construction of the facility" The objectives of this inspection are to prevent, identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer. urban planning activities, including technical regulations and project documentation, The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 731904104322
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-13, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 15102019 bn item 3.4 of the inspection program "Installation of well strapping construction of a high-pressure water pipeline from BG1 to node BG2"The objectives of this inspection are to prevent, identify and prevent the technical customer and the person carrying out construction on on the basis of a contract with the developer or a technical customer for violations of legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 001904100565
Unscheduled inspection
Start date: 2019-12-12, end date: 2020-01-16, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement for the full development of the Verkhneshapshinsky field Bushes of wells 1 bis 6 bis code 08915 Bush 1 bis 11 stage Oil and gas pipeline from KP 1 to TVR" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 731904124320
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 15102019 bn item 5 of the 6th inspection program "Construction of a high-pressure water pipeline from BG1 to node BG3 of a high-pressure water pipeline from BG2 to a single well 1 of the Novobessovsky oil field" The objectives of this inspection are to prevent identify and suppress violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the technical customer of violations of legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 731904104292
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-11-22, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 15102019 bn item 1 2 of the inspection program "construction of the valve assembly BG1 BG 2"The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 731903985609
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-11-22, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 15102019 bn item 1 2 of the inspection program "construction of the valve assembly BG1 BG 2"The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 001903746540
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-27, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the previously issued regulation No. 58126P dated March 5, 2019. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts


# 731903883579
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-23, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 12082019 bn item 5 of the 6th inspection program "grounding and lightning protection device installation of drainage tank"The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 731903898712
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-28, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 12082019 bn item 7 of the inspection program "completion of the construction of the facility" The objectives of this inspection are to prevent, identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer on urban planning activities, including technical regulations and project documentation, the subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 731903773383
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-04, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 12082019 bn item 3 4 of the inspection program "Construction of an oil pipeline from PK 0+00 to PK 50+00 from PK 50+00 to PK 100 +48"The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 001902902406
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of PJSC NK RussNeft on the completion of the construction of a capital construction facility dated 17042019 81 bx 41314315 dated 12072019. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including design activities, committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor Documentation


# 001902902400
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of PJSC NK RussNeft on the completion of the construction of the capital construction facility dated 12072019 71 bx 41314315 dated 12072019. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including design activities, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor Documentation


# 731903632565
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-30, duration:
Authority: Agentstvo gosudarstvennogo stroitelnogo i zhilischnogo nadzora Ulyanovskoi oblasti
Purpose of inspection: this inspection is carried out in order to implement the inspection program developed on the basis of the notice of the start of construction of the reconstruction of the capital construction facility dated 12082019 bn item 1 2 of the inspection program "Dismantling works construction of the SOD launch site" The objectives of this inspection are to prevent identify and suppress technical violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer of violations of legislation on urban planning activities, including technical regulations and project documentation, The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 001902765614
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-08-16, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the previously issued order dated March 5, 2019 58126P


# 001902675712
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of PJSC NK RussNeft on the completion of the construction of the capital construction facility dated 17042019 61 bx 4138910 dated 17042019. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including design activities, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor Documentation


# 861902806066
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-01, duration:
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 22042019 021382019 on the elimination of violations of environmental legislation by 27052019


# 001902613743
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 15, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001902613697
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-14, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice dated March 15, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 861902601531
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-25, duration:
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: a full comprehensive and objective review of the facts of violation of the requirements of environmental legislation in connection with the threat of harm to the environment, taking into account the motivated presentation of the chief specialist of the Nizhnevartovsk Department of Nature Supervision of Yugra Nigmatov RF


# 001802190957
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Verkhneshapshinsky field development for full development Bush site 34 code 1199 12 construction stage producing well 12 2 overhead line 10 kV from the well site 33 to the well site 34 to the KTP sites" on the basis of the completion notice in order to monitor the compliance of completed work with the mandatory requirements of technical regulations The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations. project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001802190953
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Verkhneshapshinsky field development for full development Cluster site 34 code 1199 11 construction stage 1 10 kV overhead line from the branch to the KTP site to the KTP site, the KTP site, the ECP electrical equipment site, the drainage tank, the water distribution unit, the measuring unit, the technological unit, the injection well with oil production 11 searchlight masts cable overpass from KTP" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001802190968
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Verkhneshapshinsky field development for full development code 742102 Verkhneshapshinsky field development facilities Well cluster 11 Stage 9 the first stage of each stage includes the filling of the bush base engineering preparation and arrangement of the first well with structures and external communications construction of a highway installation of linear pipelines and overhead lines necessary to put the bush site into operation, the arrangement of each of the subsequent wells and their connection to the infrastructure of the bushes is carried out in a separate sub-stage" based on the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent the detection of and the suppression of violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, the implementation of requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 861801990910
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-23, duration:
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: monitoring the implementation of the regulation dated 29062018 09612018


# 001801593600
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-26, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 10 dated September 10, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800829251
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829241
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829218
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829199
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800829142
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 861800777418
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-10-01, duration:
Authority: Sluzhba po kontrolyu i nadzoru v sfere ohrany okruzhayuschei sredy obektov zhivotnogo mira i lesnyh otnoshenii HantyMansiiskogo avtonomnogo okruga YUgry
Purpose of inspection: Objectives monitoring the implementation of regulations 016120180101 dated 29062018 on the elimination of violations of forest legislation 016120180102 dated 29062018 on the elimination of violations of forest legislation tasks ensuring compliance with the requirements of forest legislation in the Khanty-Mansiysk Autonomous Okrug of Yugra subject compliance with regulations of state control and supervision bodies


# 001800529664
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed capital construction facility Development of the Kondinsky field Bushes 4 6 and communication corridors code 8535 Bush wells 6 Stage 39 In order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources availability building permits to comply with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code


# 001800529479
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed capital construction facility Arrangement for the full development of the Verkhneshapshinsky deposit Well bushes 1 bis 6 bis code 08915 Bush 6 bis stage 2 In order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppression of violations of mandatory requirements of regulatory documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2, 3, and 3_1 of Article 52 of this Code


# 001800528361
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: check the completed capital construction object Arrangement to the full development of Verhnechirchikskogo field well clusters 1 bis 6 bis cipher 08915 Bush wells 6 bis phase 1 construction of the road KP 6 bis Engineering training transmission 6 bis 10 kV from sheer to KP 6 bis Pad transformer substations SU and PT Transformer substation Neftegazovoy tubing from KP 6 KP to bis 6 the arrangement of the well 1 mining with network engineering Metering control Unit Unit dosing Floodlight mast poses 91 the drainage Capacity of 80 m3 a Lightning rod for the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of the other normative legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the prevention detection and suppression of violations of mandatory requirements of normative documents and legislative acts of the work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 of article 52 3_1 of this Code


# 001800529380
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva «Obustroistvo skvazhin kusta 80 81 Potochnogo mestorozhdeniya shifr 02200 Kusty skvazhin 80 81 Potochnogo mestorozhdeniya Kust skvazhin 81 5 etap stroitelstva obustroistvo skvazhin 41 42 43 44 s podklyucheniem ih k AGZU montazh tehnologicheskih truboprovodov stroitelstvo elektrotehnicheskoi i KA estakady» S celyu kontrolya sootvetstviya vypolnennyh rabot obyazatelnym trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov proektnoi dokumentacii trebovaniyam po energosberezheniyu i povysheniyu energeticheskoi effektivnosti pri stroitelstve obekta kapitalnogo stroitelstva zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii normativnyh dokumentov i zakonodatelnyh aktov preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii normativnyh dokumentov i zakonodatelnyh aktov sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 3_1 stati 52 nastoyaschego Kodeksa


# 001800528259
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed capital construction facility Arrangement for the full development of the Verkhneshapshinsky deposit Well bushes 1 bis 6 bis code 08915 Well bush 1 bis 1st stage of construction In order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility the objectives of this inspection are to prevent detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and equipment requirements of the capital construction facility accounting for the energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2, 3, and 3_1 of Article 52 of this Code


# 001800528600
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed, a complex for heating oil and disposing of sediment from biological wastewater treatment at a Sandy deposit In order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this inspection are to prevent identify and suppress violations of mandatory regulatory requirements. documents and legislative acts prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001800528454
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the completed capital construction facility Arrangement of the Verkhneshapshinsky field for full development Code 742102 Arrangement of the well cluster 12 Stage 10 arrangement of each of the subsequent wells and their connection to the infrastructure of the bushes is carried out in a separate sub-stage In order to control the compliance of the work performed with the mandatory requirements of technical regulations other regulatory legal acts project documentation requirements for energy conservation and energy efficiency improvement during the construction of the facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit , and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 001800438272
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-08-09, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 9 dated May 28, 2018, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800438364
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-08-10, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 8 dated May 28, 2018, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800173655
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice 7 dated February 12, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 001800173524
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the completion notice No. 6 dated February 12, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts


# 00170802901854
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 1 dated 31/12017


# 00170802901195
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 5 dated 31/12017


# 00170802901740
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 2 dated 31/12017


# 00170802901413
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 3 dated 31/12017


# 00170802901588
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 4 dated 31/12017


# 00170802803895
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Termination Notice 1 dated 31072017


# 00170802637992
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-16, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the license applicant's compliance with the licensing requirements


# 00170701730000
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-07-19, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: The audit is conducted in order to verify the fulfillment by PJSC NK RussNeft of the previously issued instruction on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 2111016 3676172the objectives of this audit are supervision of compliance with mandatory requirements in the field of geological exploration, rational use and protection of subsurface resources.7 The subject of this audit is the fulfillment by PJSC NK RussNeft of the previously issued instruction on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 2111/2016 3676172


# 00160701075515
Unscheduled inspection
Start date: 2016-11-02, end date: 2016-11-30, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: verification of a previously issued prescription


# 00160701035828
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-21, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: Establishment of the threat of environmental damage due to the activities of JSC NK RussNeft on the territory of the Sokolovogorsky subsurface area of Saratov


# 00160601474215
Unscheduled inspection
Start date: 2016-01-28, end date: 2016-02-25, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Saratovskoi i Penzenskoi oblastyam
Purpose of inspection: in order to establish the threat of environmental damage caused by natural gas combustion and land pollution


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.