Found 130 inspections:

# 001902956185
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-25, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the fulfillment of the previously issued instruction from 30102018 Sv1167 DSPP. The objectives of this inspection are to take measures to control the elimination of violations specified in the paragraphs of the instruction from 30102018 Sv1167 DSPP, the deadline for which has expired


# 00160700693504
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-09-09, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance of JSC Regiongazinvest with the requirements for readiness for the heating period specified in the XIII "Rules for assessing readiness for the heating period" approved by Order of the Ministry of Energy of the Russian Federation dated 12032013 103 registered with the Ministry of Justice 24042013 reg 28269


# 00160700030241
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-09-09, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to monitor compliance by JSC Regiongazinvest with the requirements for readiness for the heating period specified in the XIII "Rules for assessing readiness for the heating period" approved by Order of the Ministry of Energy of the Russian Federation dated 12032013 103 registered with the Ministry of Justice 24042013 reg 28269


# 662101314469
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 662101314479
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662101314491
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-17, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 48710 dated 02.11.2021, in accordance with the inspection program dated No. the task of this inspection is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the construction materials used during the construction of the capital construction facility "Boiler house with a useful capacity of 0.675 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Basovaya str., z/u No. 49k", located at: Sverdlovsk region, Krasnoufimsk, Basovaya str., order No. 49k, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662101314462
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-17, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 48711 dated 02.11.2021, in accordance with the inspection program dated No. the task of this inspection is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the construction materials used during the construction of the capital construction facility "Boiler house with a useful capacity of 0.135 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Kirova str., No. 12-k", located at: Sverdlovsk region, Krasnoufimsk, Kirova str., No. 12-k, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; meeting the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662101314505
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662101314551
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 662101314548
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662101314537
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662101314522
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-17, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 48719 dated 02.11.2021, in accordance with the inspection program dated No. the task of this inspection is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the building materials used during the construction of the capital construction facility "Boiler house with a useful capacity of 0.405 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Sovetskaya str., No. 70k", located at: Sverdlovsk region, Krasnoufimsk, Sovetskaya str., No. 70k, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; meeting the requirements set out in Parts 2, 3 and 3.1 of Articles 52 of the Urban Planning Code of the Russian Federation.


# 662101314567
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 662101203105
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 662100365432
Unscheduled inspection
Start date: 2021-08-02, end date: 2021-08-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/323-20 dated 2020-10-29; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.405 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Sovetskaya str., No. 70k, located at: Sverdlovsk region, Krasnoufimsk, Sovetskaya str., No. 70k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100365533
Unscheduled inspection
Start date: 2021-08-02, end date: 2021-08-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/324-20 dated 10/29/2020; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Boiler house with a useful capacity of 0.63 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Promyshlennaya str., house No. 11, located at: Sverdlovsk region, Krasnoufimsk, Promyshlennaya str., No. 11, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code Of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100365434
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 662100365407
Unscheduled inspection
Start date: 2021-08-02, end date: 2021-08-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/326-20 dated 2020-11-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Boiler house with a useful capacity of 0.135 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Kirova str., No. 12-k, located at: Sverdlovsk region, Krasnoufimsk, Kirova str., No. 12-k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 Of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation Federation.


# 662100365411
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100365415
Unscheduled inspection
Start date: 2021-08-02, end date: 2021-08-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/327-20 dated 2020-11-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler with a useful capacity of 0.72 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Cherkasovsky lane, z/u No. 10k, located at: Sverdlovsk region, Krasnoufimsk, Cherkasovsky Lane, z/u No. 10k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code. the Code of the Russian Federation.


# 662100365393
Unscheduled inspection
Start date: 2021-08-02, end date: 2021-08-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/328-20 dated 2020-11-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.585 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Neftyanikov str., 10k, located at: Sverdlovsk region, Krasnoufimsk, Neftyanikov str., 10k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100365389
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 662100365371
Unscheduled inspection
Start date: 2021-08-02, end date: 2021-08-20, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. dated 2021-03-12; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a capacity of 20.0 MW in Krasnoufimsk, ul. 8 Marta, 51a, located at: Sverdlovsk region, Krasnoufimsk, ul. 8 Marta, No. 51a, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for the energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100326910
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 662100354898
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100291152
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/330-20 dated 2020-11-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.765 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, lane. Breeding, 12, located at the address: Sverdlovsk region, Krasnoufimsk, lane. Selection, 12, of the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a building permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100291145
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100291104
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100291093
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/326-20 dated 2020-11-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Boiler house with a useful capacity of 0.135 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Kirova str., No. 12-k, located at: Sverdlovsk region, Krasnoufimsk, Kirova str., No. 12-k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 Of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation Federation.


# 662100291110
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/328-20 dated 2020-11-02; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.585 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Neftyanikov str., 10k, located at: Sverdlovsk region, Krasnoufimsk, Neftyanikov str., 10k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100290995
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/325-20 dated 2020-10-29; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.675 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Basovaya str., unit No. 49k, located at: Sverdlovsk region, Krasnoufimsk, Basovaya str., unit No. 49k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code. the Code of the Russian Federation.


# 662100290984
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/324-20 dated 2020-10-29; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.63 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Promyshlennaya str., house No. 11, located at: Sverdlovsk region, Krasnoufimsk, Promyshlennaya str., No. 11, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code Of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100290974
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/323-20 dated 2020-10-29; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a useful capacity of 0.405 MW at the address: Sverdlovsk region, Krasnoufimsk city district, Krasnoufimsk, Sovetskaya str., No. 70k, located at: Sverdlovsk region, Krasnoufimsk, Sovetskaya str., No. 70k, the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100290972
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-07-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/322-20 dated 2020-10-29; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Boiler house with a useful capacity of 0.105 MW at the address: Sverdlovsk region, Krasnoufimsk, Pudlingovy settlement, Uralskaya str., area No. 10k, located at: Sverdlovsk region, Krasnoufimsk, Pudlingovy settlement, Uralskaya str., area No. 10k, the results of such work to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, including the requirements for energy efficiency (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; the availability of a construction permit; compliance with the requirements set out in parts 2, 3 and 3.1 of the Article 52 of the Urban Planning Code of the Russian Federation.


# 662100222808
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 662100111275
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-14, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-22/52-21 dated 2021-03-12; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Boiler house with a capacity of 20.0 MW in Krasnoufimsk, ul. 8 Marta, 51a, located at: Sverdlovsk region, Krasnoufimsk, ul. 8 Marta, No. 51a, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100168087
Unscheduled inspection
Start date: 2021-04-16, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: supervision and control over compliance with labor legislation and other acts containing labor law norms in relation to employees of JSC Regiongaz-Invest supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms. compliance with mandatory requirements or requirements established by municipal legal acts;


# 662100120883
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit: Execution of the instructions of the President of the Russian Federation, the Government of the Russian Federation; Verification tasks: implementation of regional state housing supervision (registration number in the Federal State Budgetary Institution "FRGU" 6600000010001464693) Subjects of verification • 26. checking the placement of information in the GIS of housing and communal services


# 662100187846
Unscheduled inspection
Start date: 2021-04-28, end date: 2021-05-26, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose: Consideration of the appeal dated 04/13/2021 No. 29-01-46-9641/1 task: implementation of Housing supervision subject: compliance with mandatory requirements for determining the amount of payment and payment for the communal service "heating" to the owners of premises in an apartment building at the address: Nevyansky district, Nevyansk, Karl Marx str., 2.


# 662100065173
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-25, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Objectives of the audit • Consideration of the appeal dated 02/25/2021 No. 29-01-48-4754/1 The tasks of the audit are the implementation of Housing supervision Inspection items • 9. Quality control of utilities


# 662100257474
Unscheduled inspection
Start date: 2021-03-29, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: supervision and control over compliance with labor laws and other acts containing labor law norms in relation to employees supervision and control over compliance with labor laws and other regulatory legal acts containing labor law norms compliance with mandatory requirements or requirements established by municipal legal acts


# 662100099212
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-04-02, duration: 6
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit: Consideration of the appeal; The tasks of the audit: the implementation of regional state housing supervision (registration number in FGIS "FRGU" 6600000010001464693); The subject of the audit: compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 662100085917
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 662100012132
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-17, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Objectives of the audit • Consideration of appeals dated 02/04/2021 No. 29-01-48-2509/1, dated 02/03/2021 No. 29-01-48-2368/1 The tasks of the audit are the implementation of Housing supervision Inspection items • 9. Quality control of utilities


# 662005224291
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662005224262
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662005223799
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662005224024
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005223745
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005223669
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662005223653
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662005223315
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29151532220 dated 29102020the task is to carry out state construction supervision. The purpose is to verify the compliance of work and applicable building materials at the capital construction facility Boiler house with a useful capacity of 0105 MW at the address Sverdlovsk region Krasnoufimsk p Pudlingovy Uralskaya St. zu 10k located at Sverdlovsk region Krasnoufimsk p Pudlingovy Uralskaya St. zu 10k the results of such work with building regulations and safety regulations and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 662005223605
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662004395996
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-04-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: supervision and control over compliance with labor legislation and other acts containing labor law norms in relation to employees supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements and or requirements established by municipal legal acts


# 662004332153
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-11, duration: 2
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to review the application The tasks of the audit the implementation of Housing supervision The subject of the audit Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 662004324910
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-16, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Control of the execution of the prescriptionthe implementation of Housing supervision compliance with the previously issued prescription 292117465 dated 18122019 compliance with mandatory requirements for the provision of public services to owners and users of premises in an apartment building at 120 Kirova Street, Tavda


# 662004242348
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-26, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to review the application The tasks of the audit the implementation of Housing supervision The subject of the audit Compliance with mandatory requirements for determining the amount and payment of utility bills


# 662004236139
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-04, duration: 5
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to review the application The tasks of the audit the implementation of Housing supervision The subject of the audit Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 662004161617
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-01-15, duration: 3
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to review the application The tasks of the audit the implementation of Housing supervision The subject of the audit Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 661904022101
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-18, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Consideration of the appeal vh 290131283711 dated 12112019the implementation of Housing supervision compliance with mandatory requirements for the provision of public services to owners and users of premises in an apartment building at 120 Kirova Street, Tavda


# 661904109887
Unscheduled inspection
Start date: 2019-12-18, end date: 2020-01-15, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 2915018719 upon notification of completion of construction. The objectives of this inspection are to carry out regional state construction supervision to verify the compliance of the work performed and applicable building materials during the construction of the capital construction facility Boiler house with a capacity of 36 MW at 2b MaminaSibiryak Street in Irbit, Sverdlovsk region, the results of such work with the requirements of design documentation, including energy efficiency requirements and the requirements of equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903987738
Unscheduled inspection
Start date: 2019-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 661903904429
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-11-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: In order to monitor the implementation of regulation 292117209 of 17062019, the objectives of this audit are to carry out housing supervision. The purpose of this audit is to comply with a previously issued regulation


# 661903411475
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661902808433
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to implement a program for conducting inspections upon completion of construction 29150112018 The objectives of this audit are to carry out regional state construction supervision to verify the compliance of the work performed and applicable building materials during the construction of the capital construction facility Boiler House on Gryaznova St. in Mikhailovsk, Sverdlovsk region, the results of such work with the requirements of design documentation, including energy efficiency requirements and facility equipment requirements capital construction with metering devices for used energy resources, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation verification of previously issued regulations


# 001902956185
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-25, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the fulfillment of the previously issued instruction from 30102018 Sv1167 DSPP. The objectives of this inspection are to take measures to control the elimination of violations specified in the paragraphs of the instruction from 30102018 Sv1167 DSPP, the deadline for which has expired


# 661902685553
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-06-10, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 2915018719. The objectives of this inspection are to carry out regional state construction supervision to verify the compliance of the work performed and applicable building materials during the construction of the capital construction facility Boiler house with a capacity of 36 MW at 2b MaminaSibiryak Street in Irbit, Sverdlovsk region, the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction with metering devices for used energy resources , as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902741078
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 661902649301
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-24, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to review the appeal 29014676641 dated 21032019 The task is to carry out Housing supervision The subject is compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings at 43 Lenin Street, Sverdlovsk region


# 661902622532
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-17, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to implement a program for conducting inspections upon completion of construction 29150112018 The objectives of this audit are to carry out regional state construction supervision to verify the compliance of the work performed and applicable building materials during the construction of the capital construction facility Boiler House on Gryaznova St. in Mikhailovsk, Sverdlovsk region, the results of such work with the requirements of design documentation, including energy efficiency requirements and facility equipment requirements capital construction with metering devices for used energy resources , as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 661902633782
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-05-13, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the notice of completion of the capital construction facility 14257 dated March 29, 2019 in accordance with the provisions of subparagraph "a" of paragraph 2 of part 5 of Article 54 of the Urban Planning Code of the Russian Federation Task is to carry out regional state construction supervision Subject is to verify the conformity of work and applicable building materials during the construction of the capital construction facility "Boiler room with a capacity of 72 MW on Ul Komsomolskaya in Pyshma district" located at 37 Komsomolskaya Street, Sverdlovsk region, Pyshma district, northeast of D19, the results of such work meet the requirements of the project documentation


# 661902604532
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration:
Authority:
Purpose of inspection:


# 661902593745
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration:
Authority:
Purpose of inspection:


# 661902526097
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-03-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to review the appeal 29014616471 dated 23012019. The task is to carry out Housing supervision. The subject is compliance with mandatory requirements for determining the amount of payment and payment for the communal service "heating" in 2018 to the owners of premises in an apartment building at 11 Nevyansk Trade Union Street


# 661902515903
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 661902544595
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661802189203
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the notice of completion of the construction of the capital construction facility 50673 dated 2211 2018 Tasks implementation of regional state construction supervision Subject verification of the conformity of work and applicable building materials during the construction of the capital construction facility "Reconstruction of the facility "Boiler room purpose industrial Built-up area Lit 2A 2E1118 sq m length Lit 2B 2B 2D998 m Address Russian Federation Sverdlovsk region Turinsky city district of Turinsk, Puteitsev Street, 2b" located at the address Sverdlovsk region, Turinsk city District, Turinsk, Puteitsev Street, 2b, the results of such work meet the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of permits for construction and fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661802296240
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is the implementation of the previously issued regulation 291505246 p in case 29150112018. The objectives of this audit are to carry out regional state construction supervision to verify the compliance of the work performed and the applicable building materials during the construction of the capital construction facility with the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and also, the availability of a building permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 661802139898
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805412 dated November 15, 2017 tasks implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805412 dated November 15, 2017


# 661802138627
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-03, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Consideration of the appeal 290232243531 dated 29102018 implementation of Housing supervision compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings


# 661802131505
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 661802131537
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 661801752722
Unscheduled inspection
Start date: 2018-10-02, end date: —, duration:
Authority:
Purpose of inspection:


# 661800634863
Unscheduled inspection
Start date: 2018-08-15, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800728044
Unscheduled inspection
Start date: 2018-08-31, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800737580
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the developer's notice on the start of construction of the capital construction facility bx dated 31072018 32244 The task is to carry out regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Gas supply of building 2 a on Tyumenskaya St. in Pyshma district, Sverdlovsk region" located at the address Sverdlovsk region Pyshma ul. Tyumenskaya in the area of house 2 and the results of such work to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800485533
Unscheduled inspection
Start date: 2018-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 661800493684
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: purpose to review the application 01013498621 dated 04062018 290134133401 dated 09062018 task to carry out Housing supervision subject to compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings Sverdlovsk region Turinsk Lenin St. 38 lit A hot water supply


# 661800482311
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to review the appeal 290134130931 dated 06062018 the task is to carry out Housing supervision the subject is compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings Sverdlovsk region, Turinsk Kalinina str., 44 hot water supply


# 661800481955
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to review the appeal of HC 290134130931 dated 06062018the task is to carry out housing supervision and ensure compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings at 44 Kalinina Street, Turinsk, hot water supply


# 661800366673
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-06-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to review the application 29014685971 The task is to carry out Housing supervision The subject is compliance with mandatory requirements for determining the amount of fees and paying utility bills to the owners of premises in an apartment building at the address Nevyansk rn Nevyansky ul. Trade Unions d 11


# 661800355262
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29150111918 dated 13042018 The task is to carry out state construction supervision The subject is to verify the compliance of work and applicable building materials at the capital construction facility Boiler House on Kirova Street in Mikhailovsk, Sverdlovsk region, located at 22a Kirova Street, Mikhailovsk, Sverdlovsk region, the results of such work with building codes and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 661800353093
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-06-11, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program from 13042018 29150112018 Task is to carry out regional state construction supervision Subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "High-pressure gas supply pipeline from the point of connection to the existing gas pipeline to the boundary of the land plot" the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800347546
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-08, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to review the appeal 290134100381 dated 26042018 the task is to carry out Housing supervision the subject is compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings Sverdlovsk region Turinsk Chapaeva St. d 6 hot water supply


# 661800257553
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-05, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Consideration of the appeal 29013264331 dated 21032018 implementation of Housing supervision compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 661800253206
Unscheduled inspection
Start date: 2018-03-30, end date: —, duration:
Authority:
Purpose of inspection:


# 661800203758
Unscheduled inspection
Start date: 2018-03-14, end date: —, duration:
Authority:
Purpose of inspection:


# 661800073919
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-16, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to review the appeal 29012218881 dated 29.012018 the task is to carry out Housing supervision the subject is compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings Sverdlovsk region Artemovsky district P. Bulanash Maxim Gorky street d 2


# 66170802975726
Unscheduled inspection
Start date: 2017-12-14, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170802825452
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose of the audit is to review appeals 290122257904 dated 05102017 290122284015 30102017the task of the audit is to carry out Housing supervision, the purpose of the audit is to ensure compliance with mandatory requirements for determining the amount of fees and paying utility bills to the owners of premises in an apartment building at Artyomovsky district, Bulanash, Komsomolskaya str., 23


# 66170802868491
Unscheduled inspection
Start date: 2017-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802859157
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-12-14, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29180111717 dated May 11, 2017. The task is to carry out regional state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Boiler house with a capacity of 200 MW in Irbit ul. 50 let Oktyabrya 24" located at the address Sverdlovsk region Irbit ul. 50 let Oktyabrya 24 the results of such work with the requirements technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170802816240
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802747455
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 2918053001 dated August 04, 2017. The objectives of this inspection are the implementation of regional state construction supervision


# 66170802743151
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170802706100
Unscheduled inspection
Start date: 2017-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802775036
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802505010
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701821144
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program 29180118617 dated June 27, 2017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of work performed and applicable building materials during the construction of the capital construction facility "Boiler House with a capacity of 72 MW on Komsomolskaya St. in Pyshma district" located in the Sverdlovsk region Pyshma Komsomolskaya St., 37 m northeast of D19, the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170701777743
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701815006
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-08-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29180117217 dated June 26, 2017. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Boiler house with a capacity of 90 MW in Talitsky GO" located at about 100 meters in the direction of northeast of the landmark of an apartment building located outside the site at 731 Kuznetsova Street, Talitsa, Sverdlovsk Region, Talitsa district, the results of such work meet the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 and 3 Article 52 of the Urban Planning Code of the Russian Federation


# 66170701814923
Unscheduled inspection
Start date: 2017-07-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701751783
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-07-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the instruction from 28042017 29211128the objectives of this inspection are to carry out housing supervision. The purpose of this inspection is to comply with the mandatory requirements for determining the amount of payment and payment for public utilities for heating to the owners of premises in an apartment building at Tavda Fanershchikov str. d 2 for the period from November 2016 to January 2017


# 66170701720635
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-07-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: control over the execution of the previously issued order to eliminate the identified violation of mandatory requirements 29180560 dated March 20, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 29180560 dated March 20, 2017


# 66170701687902
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701545251
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-04-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Consideration of the appeal 29013472921 dated 20032017 29013476101 dated 21032017 implementation of Housing supervision compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings in Turinsk Gorky street d 54 Kalinin street d 27 Lenin street d 38 lit a Lenin street d 38 lit v Lenin street d 38 lit g d 38 lit d


# 66170701483406
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701386851
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-03-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 29180141716 dated November 03, 2016, the objectives of which are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Reconstruction of the facility "Boiler room purpose industrial Built-up area Lit 2A 2E1118 sq m length Lit 2B 2B 2D998 m Address Russian Federation Sverdlovsk region Turinsky city the district of Turinsk, Puteitsev Street, d2b" located at the address Sverdlovsk region, Turinsk, Puteitsev Street, 2b, the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federations


# 00170701460209
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-13, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the licensee's readiness of JSC RegiongazInvest to fulfill the licensing requirements for the following type of activity: "Operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III" for the above type of work, services performed as part of the licensed type of activity, measures to monitor the state of operation of hazardous production facilities, technical devices, buildings, structures and documentation of JSC RegiongazInvestRegiongazInvest"


# 66170701311249
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701308006
Unscheduled inspection
Start date: 2017-01-13, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701293932
Unscheduled inspection
Start date: 2017-01-10, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66160701120060
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-12-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Control of the execution of regulation 292119120 of 12082016


# 66160701041639
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-11-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: inspection of a capital construction facility completed on the basis of the notice of completion of the capital construction facility BX 29018243845 dated 14102016


# 66160601700541
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 29150627 dated January 29, 2016


# 66160601781793
Unscheduled inspection
Start date: 2016-08-08, end date: 2016-08-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: monitoring the implementation of the previously issued regulation 29211967 of 10052016 implementation of Housing supervision


# 00160700693504
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-09-09, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance of JSC Regiongazinvest with the requirements for readiness for the heating period specified in the XIII "Rules for assessing readiness for the heating period" approved by Order of the Ministry of Energy of the Russian Federation dated 12032013 103 registered with the Ministry of Justice 24042013 reg 28269


# 00160700030241
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-09-09, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to monitor compliance by JSC Regiongazinvest with the requirements for readiness for the heating period specified in the XIII "Rules for assessing readiness for the heating period" approved by Order of the Ministry of Energy of the Russian Federation dated 12032013 103 registered with the Ministry of Justice 24042013 reg 28269


# 66160601784066
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-09-09, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: inspection of a capital construction facility completed on the basis of the notice of completion of the capital construction facility VH 29018231888 dated 04082016


# 66150600726224
Unscheduled inspection
Start date: 2015-07-13, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.