# 022004393176
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: by order of
# 022004393175
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: by order of
# 022004330371
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 021903801328
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Written appeal of a citizen 27525219OB dated 27092019
# 021903868147
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Written request of a citizen 27539619OB dated 08102019
# 001903748323
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of the measures of regulation 341026132 of 26032019, previously issued to the enterprise, the deadlines for which have expired
# 001802011265
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800041031
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-29, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of previously identified violations of the mandatory requirements specified in paragraph 179 of the Regulation dated 26052017 43217119190109
# 00170802910244
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-08, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the activities of a legal entity, an individual entrepreneur, in connection with the expiration of the deadline for the execution of an order issued by the state supervisory authority to eliminate violations of mandatory requirements of paragraphs 12 of Regulation 43136983178 dated April 28, 2016
# 00170802427150
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: fulfillment of a previously issued prescription
# 02170701828883
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-08-23, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the notice of completion of construction 2 dated 21072017 bx 13824 dated 21072017
# 00150601078366
Unscheduled inspection
Start date: 2015-09-01, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the possibility for the license applicant to fulfill the licensing requirements
# 00150600574168
Unscheduled inspection
Start date: 2015-09-15, end date: 2015-09-24, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: monitoring the implementation of Regulation 229113 of 19/12/2014 on the elimination of violations of mandatory fire safety requirements on the implementation of measures to ensure fire safety at protective facilities and to prevent the threat of fire
# 00150601174765
Unscheduled inspection
Start date: 2015-08-31, end date: 2015-09-25, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the application and documents for the renewal of the bx33293c license dated 13082015 assessment of the possibility of meeting licensing requirements for the operation of explosive and chemically hazardous production facilities of hazard classes I II III use of flammable oxidizing combustible explosive toxic highly toxic substances and substances that pose a danger to the environment at the facility gas consumption network
# 00150600923982
Unscheduled inspection
Start date: 2015-08-31, end date: 2015-09-25, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the possibility of meeting licensing requirements in the operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III
# 162100049803
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-04-01, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 212005290331
Unscheduled inspection
Start date: 2020-12-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 182004522276
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 212004442001
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-27, duration: 20
Authority: Gosudarstvennaya inspekciya truda v CHuvashskoi Respublike
Purpose of inspection: Federal state supervision of compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms is the requirement of the Prosecutor General of the Chuvash Republic, AP Yevgrafov, dated 11062020 723529602020970001 2147920TPR dated 15062020 in connection with the consideration of applications from Ivan Vladimirovich Batishchev, dated 28052020 217128120, dated 01062020 217130520, dated 11062020 217138120, to LLC "TransTechService Management Company in accordance with Article 360 of the Labor Code of the Russian Federation
# 562004416977
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 182004412418
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration: —
Authority: Gosudarstvennaya inspekciya truda v Udmurtskoi Respublike
Purpose of inspection: Verification of the arguments set out in the collective appeal of employees
# 162004396215
Unscheduled inspection
Start date: 2020-04-15, end date: 2020-05-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 182004401205
Unscheduled inspection
Start date: 2020-04-20, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Udmurtskoi Respublike
Purpose of inspection:
# 022004393176
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: by order of
# 022004393175
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: by order of
# 022004330371
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 162004227576
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 021903801328
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Written appeal of a citizen 27525219OB dated 27092019
# 161903809454
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received in the Inspection notice dated 01102019 9464 on the completion of the construction of the capital construction facility, the prevention as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements and or requirements established by municipal legal acts acts
# 021903868147
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Bashkortostan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Written request of a citizen 27539619OB dated 08102019
# 161903301677
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903072194
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 27082019 7855 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 09082019 1712017201 to 10092019 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, with the requirements of state control bodies, supervision bodies of municipal control performed during the construction of the capital construction facility
# 001903748323
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of the measures of regulation 341026132 of 26032019, previously issued to the enterprise, the deadlines for which have expired
# 161902852449
Unscheduled inspection
Start date: 2019-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902796018
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of fulfillment of the order dated 22052019 1712009901, the deadline for which expired on 10062019, and to draw up an act based on the results of the inspection to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with the regulations of the state control bodies supervision of municipal control bodies
# 161902688467
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902662820
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-24, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued regulation No. 6211 dated 23042018 on the elimination of violations of fire safety requirements on measures to ensure fire safety at protective facilities and to prevent the threat of fire. The objectives of this inspection are to verify the completeness and quality of measures to eliminate violations specified in Regulation No. 6211 dated 23042018 on the elimination of violations of fire safety requirements. on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire, compliance with mandatory requirements and or requirements established by municipal legal acts
# 161902616680
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: The purpose of the audit the audit is carried out in order to determine the compliance of the performed works used in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used The task of verification is to prevent as well as identify and suppress violations committed by the developer customer the person carrying out construction on the on the basis of an agreement with the developer or the customer for violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation Subject to verification compliance with mandatory requirements or requirements established by municipal legal acts
# 161902555376
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-03-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 08112018 case 171120180043 prevents as well as identifies and suppresses violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, as well as with mandatory requirements and or requirements established by municipal legal acts, committed by the developer, the customer or the person carrying out construction on the basis of a contract with the developer or the customer
# 001902620458
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-26, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to comply with the order of the Head of the Federal Service for Environmental, Technological and Nuclear Supervision dated February 01, 2019 44 "On conducting inspections of compliance with mandatory requirements by electric power industry entities, heat supply organizations, heating grid organizations and consumers of electric energy in 2019" issued on the basis of the instruction of the Government of the Russian Federation dated January 18, 2019 DKP9254 the objectives of this audit are assessment of the compliance of the activities or actions omissions carried out by the audited person with the requirements established by Federal laws and other regulatory legal acts in the field of safety of electrical installations and networks
# 161902507535
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 07022019 1038 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 26112018 1719028901 to 15032019 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with the instructions of state control bodies, supervision bodies of municipal control
# 161902453529
Unscheduled inspection
Start date: 2019-01-25, end date: 2019-01-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 08112018 case 171120180043 prevents as well as identifies and suppresses violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, as well as with mandatory requirements and or requirements established by municipal legal acts, committed by the developer, the customer or the person carrying out construction on the basis of a contract with the developer or the customer
# 161902468820
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161802100780
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161802183936
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001802011265
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-12, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination by a legal entity of previously identified violations of the mandatory requirements specified in subclause 121 of Regulation No. 432128139104 of 16052018
# 161800256078
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-23, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: this inspection is carried out in order to control the previously issued instruction on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at the protection facility and to prevent the threat of fire the objectives of this inspection are to verify the completeness and quality of the implementation of measures to eliminate violations specified in the regulation of the regulation on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety safety at the object of protection and to prevent the threat of fire, the subject of this check is to note the necessary compliance with the instructions of state control bodies supervision of municipal control bodies
# 161800061605
Unscheduled inspection
Start date: 2018-02-14, end date: 2018-02-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed reconstruction of the facility in accordance with with the notice received by the Inspection from 05022018 759 on the completion of the reconstruction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations of compliance by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7 performed during the construction of the capital construction facility. It is necessary to choose the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 001800041031
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-29, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of previously identified violations of the mandatory requirements specified in paragraph 179 of the Regulation dated 26052017 43217119190109
# 16170803017195
Unscheduled inspection
Start date: 2017-12-20, end date: 2018-01-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 00170802910244
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-08, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the activities of a legal entity, an individual entrepreneur, in connection with the expiration of the deadline for the execution of an order issued by the state supervisory authority to eliminate violations of mandatory requirements of paragraphs 12 of Regulation 43136983178 dated April 28, 2016
# 00170802427150
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: fulfillment of a previously issued prescription
# 02170701828883
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-08-23, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the notice of completion of construction 2 dated 21072017 bx 13824 dated 21072017
# 16170701541690
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-04-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the purpose of determining the compliance of the work performed, the construction materials used during the construction of the facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage in accordance with the Inspection notification dated 15082016 6884 on completion of construction Tasks prevention and identification and the suppression of violations committed by the developer of the compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation Subject to compliance with mandatory requirements or requirements established by municipal legal acts
# 16160700059369
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-09-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 16160601568367
Unscheduled inspection
Start date: 2016-04-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160601531902
Unscheduled inspection
Start date: 2016-03-17, end date: 2016-03-25, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: control over the execution of the regulation on the elimination of mandatory fire safety requirements
# 16160601531964
Unscheduled inspection
Start date: 2016-03-14, end date: 2016-04-08, duration: —
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po Respublike Tatarstan
Purpose of inspection: Performing the state function of detecting and suppressing violations of the advertising legislation in connection with the ongoing monitoring of compliance with mandatory requirements of the advertising legislation
# 00150601078366
Unscheduled inspection
Start date: 2015-09-01, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the possibility for the license applicant to fulfill the licensing requirements
# 00150600574168
Unscheduled inspection
Start date: 2015-09-15, end date: 2015-09-24, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: monitoring the implementation of Regulation 229113 of 19/12/2014 on the elimination of violations of mandatory fire safety requirements on the implementation of measures to ensure fire safety at protective facilities and to prevent the threat of fire
# 00150601174765
Unscheduled inspection
Start date: 2015-08-31, end date: 2015-09-25, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the application and documents for the renewal of the bx33293c license dated 13082015 assessment of the possibility of meeting licensing requirements for the operation of explosive and chemically hazardous production facilities of hazard classes I II III use of flammable oxidizing combustible explosive toxic highly toxic substances and substances that pose a danger to the environment at the facility gas consumption network
# 00150600923982
Unscheduled inspection
Start date: 2015-08-31, end date: 2015-09-25, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the possibility of meeting licensing requirements in the operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III