# 632201551763
Unscheduled inspection
Start date: 2022-01-19, end date: —, duration: 9
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: The program of inspections is to verify the compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632101341535
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632101306809
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632100710832
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632100693780
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632100937754
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632100959414
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:
# 632100750965
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100407727
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100416553
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632100253125
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:
# 632100247925
Unscheduled inspection
Start date: 2021-06-03, end date: 2021-05-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100292264
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632100208702
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100208665
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100208687
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100137474
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-04-22, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632100082423
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 632105320321
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-02-12, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632105313633
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-05, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
# 632005235476
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-11-30, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 632004458756
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-08-17, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Samarskoi oblasti
Purpose of inspection: The audit is carried out in order to carry out federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, fulfilling the instructions of Deputy Prime Minister of the Russian Federation Golikova TA dated 27/122019 TG 1211486 order of the Federal Service for Labor and Employment dated 07022020 29 order of the Federal Service for Labor and Employment dated 05062020 122 order of the Federal Service for Labor and Employment from 11062020 126 The objectives of this audit are to ensure compliance with labor legislation and the protection of labor rights. The purpose of this audit is to comply with the requirements or requirements of labor legislation and other regulatory legal acts containing labor law norms
# 632004341217
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-04-13, duration: —
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po Samarskoi oblasti
Purpose of inspection: The purpose and objective of this audit was to verify the arguments contained in the materials received from the Prosecutor's Office of Samara and indicating signs of violation of antimonopoly legislation. The subject of the audit was the Company's compliance with the requirements of Article 16 of Federal Law No. 135FZ dated 26072006 On Protection of Competition
# 632004168943
Unscheduled inspection
Start date: 2020-01-10, end date: 2020-01-31, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631904158692
Unscheduled inspection
Start date: 2019-12-30, end date: 2019-12-31, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802214070
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-14, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802214047
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-14, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802283087
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-28, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802283043
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-28, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802075593
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802071392
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631802012045
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Implementation of the previously issued regulation 01050810251 dated 26092018 Notice 4876 dated 15102018
# 631802011986
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Implementation of the previously issued regulation 01050810241 dated 26092018 Notice 4875 dated 15102018
# 631801237775
Unscheduled inspection
Start date: 2018-09-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 631801237642
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-26, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800588397
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-08, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800588432
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 631800588416
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-08, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800588362
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-08, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800505905
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:
# 631800505830
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 631800354160
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-24, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800354075
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-24, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800264968
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-19, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800264910
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-19, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800007804
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-31, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 631800007759
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-31, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 63170803005354
Unscheduled inspection
Start date: 2017-12-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 63170803005313
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-20, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 30062016 notification dated 15122017 5791 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170802815897
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-17, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 20052016 notification dated 30102017 4711 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170802815950
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 63170802835468
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 10022017 notification dated 02112017 4811 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170802835429
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 10022017 notification dated 02112017 4801 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170802912107
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-18, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 20052016 notification 5145 dated 20112017 5189 dated 22112017 Verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 63170802909375
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-18, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 30062016 notification 5146 dated 20112017 5188 dated 22112017 Verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 63170802608113
Unscheduled inspection
Start date: 2017-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 63170802607847
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-06, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 10022017 notification dated 19092017 3938 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170802028637
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 30062016 notification dated 28082017 3487 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170701779383
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 63170701724737
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-06-30, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 10022017 notification dated 14062017 2220 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170701724395
Unscheduled inspection
Start date: 2017-06-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 63170701604564
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-24, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 20052016 notification dated 03052017 1567 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170701604433
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-24, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 30062016 notification dated 03052017 1566 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63170701614171
Unscheduled inspection
Start date: 2017-05-23, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:
# 63170701614090
Unscheduled inspection
Start date: 2017-05-23, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:
# 63170701328329
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 63170701328198
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-10, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 30062016 notification dated 18012017 191 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used
# 63160700056896
Unscheduled inspection
Start date: 2016-09-01, end date: 2016-09-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 63160700057083
Unscheduled inspection
Start date: 2016-09-01, end date: 2016-09-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 63160601736268
Unscheduled inspection
Start date: 2016-07-26, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:
# 63160601703490
Unscheduled inspection
Start date: 2016-07-11, end date: 2016-07-22, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used