# 742100345879
Unscheduled inspection
Start date: 2021-07-16, end date: 2021-07-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of equipment, electrical installation, electric lighting and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005203716
Unscheduled inspection
Start date: 2020-10-30, end date: 2020-11-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the lining of columns, the installation of metal connections of beams up to the mark of +7000 of the second tier of columns in the AB 17 axes and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used for energy resources 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005202572
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004450087
Unscheduled inspection
Start date: 2020-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004176427
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741904043284
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work in the building of the raw materials warehouse with the installation of a clean floor in the AB1112 axes at the source materials supply site during the reinforcement and concreting of building walls, staircases in the building of the fire extinguishing pumping station with tanks during the interior decoration of the pumping room during the roof installation and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903924287
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of a ventilated facade of the basement, the installation of aspiration foundations and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903811973
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed during the installation of the foundations of the built-in premises in axes B27 of the foundations of the built-in premises in axes BV12 installation of sandwich panels on facades in axes A1G during the installation of profiled roofing in axes A1B11171 during the decoration of the built-in premises in axes 57B installation of the foundations of the bins in axes GD1620 installation of foundations for the equipment of ore thermal furnaces in axes BD67 during backfilling in axes GD122 and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903577548
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of concrete preparation reinforcement and concreting of the first second stage of the foundation FO1 along the A11121 axis and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903533138
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed during the installation of a clean floor of a warehouse of raw materials in the AB111 axes, the installation of a profiled wall sheet in the AB1021 axes, the installation of air ducts from otm + 0300 to the roof during the reinforcement and concreting of building walls from otm +30,000 to otm +6000 at the site of preparation and supply of raw materials during the interior decoration of premises in the pumping station building and the construction materials during the construction of a capital construction facility, as well as the results of such work, to the requirements of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902928557
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-08-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the foundations of the built-in premises in axes B28 of the foundations of the built-in premises workshops in axes VG12 during the installation of the pit PRm1 in axes A1B13171 to otm +0000 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741902978827
Unscheduled inspection
Start date: 2019-08-28, end date: 2019-09-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the decoration of built-in premises and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902914221
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-08-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed when installing the underlying floor layer along the AB121 axis the site of preparation and supply of raw materials compliance with the work performed when installing aspiration foundations when installing foundations for equipment FOm1 and FOm2 pumping station building with reservoirs compliance with the work performed when laying walls up to otm + 3900 when installing the mk service area, the WB floor of the pumping station, the pit PRm1 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902840191
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation from 18062019 with a deadline of 11072019 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902858088
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation from 26062019 with a deadline until 17072019 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902769561
Unscheduled inspection
Start date: 2019-06-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902769458
Unscheduled inspection
Start date: 2019-06-11, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902791856
Unscheduled inspection
Start date: 2019-06-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902806552
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundations and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902688836
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902688889
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902689015
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the instruction from 09042019 with a deadline until 06052019 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902610748
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of metal structures of the half-timbered monorail during the filling and lining of the bases of the columns of the warehouse of raw materials during waterproofing reinforcement and concreting of the stairwell pit Pr1 of the site of preparation and supply of raw materials during the preparation of the base reinforcement and concreting of the slab of the bottom and walls of the pumping station and the construction materials used during the construction of the capital construction facility as well as the results of such requirements of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741902633713
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the waterproofing of foundations and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902637702
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms on the basis of a reasoned submission by an official dated 29032019
# 741902607061
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the bricklaying of the basement, coating of metal structures with flame retardants and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902607079
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902566904
Unscheduled inspection
Start date: 2019-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902570218
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902583490
Unscheduled inspection
Start date: 2019-03-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902482697
Unscheduled inspection
Start date: 2019-02-13, end date: 2019-02-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during backfilling in axes 18 and the construction of foundations in axes 19 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Compliance with fire and sanitary and epidemiological measures 3 Availability of a building permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902532157
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the construction of the foundations of the materials preparation site in the AG 19 axes during the reinforcement and concreting of the pit along the B39 axis and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902416169
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902455479
Unscheduled inspection
Start date: 2019-01-29, end date: 2019-02-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of metal structures, columns, trusses of the warehouse of the raw materials warehouse, the foundations of the material preparation site in the AB 19 axes, when reinforcing the pit along the B axis and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 Urban Planning the Code of the Russian Federation
# 741802200060
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during backfilling of foundations reinforcement and concreting of slabs and retaining wall walls during the installation of metal structures and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 Urban Planning Code of the Russian Federation
# 741802199927
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during reinforcement and concreting of foundations in axes B1A1 G922 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 Urban Planning Code of the Russian Federation
# 741802045317
Unscheduled inspection
Start date: 2018-11-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802045327
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the development of the excavation, the construction of a crushed stone foundation during the reinforcement and concreting of foundations and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741802080530
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-11-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the foundations of the warehouse of raw materials during backfilling the device of the retaining wall when installing the foundations of the source materials supply site the device of pumping pits and reservoirs and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23i 31 st52 Urban Planning Code Russian Federation
# 741801132472
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-10-12, duration: —
Authority: Ministerstvo ekologii CHelyabinskoi oblasti
Purpose of inspection: Purpose control over the implementation of previously issued regulations of the state control supervision body Tasks carrying out measures to monitor the implementation of previously issued regulations by the state control supervision body, the deadline for which has expired Subject to the implementation of the regulations of the state control supervision body