Found 70 inspections:

# 772101331005
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772101330998
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Provedenie proverki na osnovanii izvescheniya ob okonchanii stroitelstva ot 25.10.2021 № P001-9529279541-51230703, ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami


# 772101331015
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Provedenie proverki na osnovanii izvescheniya ob okonchanii stroitelstva ot 25.10.2021 № P001-9529279541-51230555, ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami


# 772101370901
Unscheduled inspection
Start date: 2021-11-23, end date: 2021-11-29, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100507819
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 772100226007
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100041915
Unscheduled inspection
Start date: 2021-03-03, end date: 2021-03-26, duration: 17
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772005291110
Unscheduled inspection
Start date: 2020-12-28, end date: —, duration:
Authority:
Purpose of inspection:


# 772005173753
Unscheduled inspection
Start date: 2020-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 502005245418
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Provedenie proverki na osnovanii izvescheniya ob okonchanii stroitelstva P001709753316139072607 ot 29092020g ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii


# 502005243843
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Provedenie proverki na osnovanii izvescheniya ob okonchanii stroitelstva P001183244089039072063 ot 29092020g ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii


# 502005243608
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 502005193967
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 142
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works with the requirements of the project documentation


# 502005194032
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works with the requirements of the project documentation


# 502005193907
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works with the requirements of the project documentation


# 502004475788
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 502004473354
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-03, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 10 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo


# 502004473321
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 502004424880
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-02-04, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 7 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo


# 501904062832
Unscheduled inspection
Start date: 2019-12-03, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 08102019 0712087600513 so srokom ispolneniya do 02122019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 10 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya ot 08102019 0712087600513 so srokom ispolneniya do 02122019


# 501903925842
Unscheduled inspection
Start date: 2019-10-02, end date: —, duration:
Authority:
Purpose of inspection:


# 501903958257
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-21, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 14082019 0712087500510 so srokom ispolneniya do 14102019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 10 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya ot 14082019 0712087600510 so srokom vypolneniya do 14102019


# 501903958397
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-21, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 14082019 0712087500510 so srokom ispolneniya do 14102019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 7 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya 0712087500510 ot 14082019 so srokom vypolneniya do 14102019


# 501903958076
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-21, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 14082019 0712087500511 so srokom ispolneniya do 14102019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 7 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya 0712087500511 ot 14082019 so srokom vypolneniya do 14102019


# 501903958338
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-21, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 14082019 0712087700509 so srokom ispolneniya do 14102019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 11 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverki ispolneniya predpisaniya ot 14082019 0712087700509 so srokom vypolneniya do 14102019


# 501903958828
Unscheduled inspection
Start date: 2019-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 501903923873
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-09-19, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 12072019 0712087700514 so srokom ispolneniya do 12092019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 11 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverki ispolneniya predpisaniya ot 12072019 0712087700505 so srokom vypolneniya do 12092019


# 501903702423
Unscheduled inspection
Start date: 2019-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 501903705513
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-09-19, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya predpisaniya ot 12072019 0712077500511 so srokom ispolneniya do 12092019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Mnogoetazhnaya zhilaya zastroika s obektami socialnoi i inzhenernoi infrastruktury Obscheobrazovatelnaya shkola na 1100 mest 1 etap stroitelstva bloka shkoly na 275 uchaschihsya 11 klassov po adresu Moskovskaya oblast Domodedovskii rn severovostochnaya chast s Domodedovo go Domodedovo proverka ispolneniya predpisaniya ot 20062019 0712077500510 so srokom vypolneniya do 20082019


# 501903698846
Unscheduled inspection
Start date: 2019-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 501903699465
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-09-19, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 12072019 0712087500506 so srokom ispolneniya do 12092019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 10 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya ot 12072019 0712087600506 so srokom vypolneniya do 19092019


# 501903073921
Unscheduled inspection
Start date: 2019-07-25, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 501903073213
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-31, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 24072019 0712087500505 so srokom ispolneniya do 24072019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 10 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya ot 24052019 0712087600505 so srokom vypolneniya do 24072019


# 501903072217
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-31, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 24052019 0712087500500 so srokom ispolneniya do 24072019 Pri ustanovlenii celei provodimoi proverki ukazyvaetsya sleduyuschaya informaciya ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 7 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya ot 24052019 0712087500505 so srokom ispolneniya do 24072019


# 501902892545
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya predpisaniya ot 29042019 0712077500508 so srokom ispolneniya do 01072019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Mnogoetazhnaya zhilaya zastroika s obektami socialnoi i inzhenernoi infrastruktury Obscheobrazovatelnaya shkola na 1100 mest 1 etap stroitelstva bloka shkoly na 275 uchaschihsya 11 klassov po adresu Moskovskaya oblast Domodedovskii rn severovostochnaya chast s Domodedovo go Domodedovo proverka ispolneniya predpisaniya ot 29042019 0712077500508 so srokom ispolneniya do 01072019


# 501902889267
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority:
Purpose of inspection:


# 501902889438
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 501902889184
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority:
Purpose of inspection:


# 501902771083
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 501902770292
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority:
Purpose of inspection:


# 501902769259
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-29, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki ispolneniya predpisaniya ot 20022019 0712087600501 so srokom ispolneniya do 22042019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Gruppa zhilyh domov raspolozhennyh v g Domodedovo s Domodedovo MO korpusa 1234567891011121314 Korpus 10 po genplanu po adresu Rossiiskaya Federaciya Moskovskaya obl g Domodedovo s Domodedovo proverka ispolneniya predpisaniya ot 20022019 0712087600501 so srokom ispolneniya do 22042019


# 501902764946
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority:
Purpose of inspection:


# 501902764491
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803301203
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803269383
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803269257
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803271642
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803217014
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-10-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803194550
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803189102
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803137893
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803123270
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803106388
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-03-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170803038509
Unscheduled inspection
Start date: 2017-12-27, end date: 2017-12-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802835825
Unscheduled inspection
Start date: 2017-11-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802784308
Unscheduled inspection
Start date: 2017-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802321550
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802571978
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701790139
Unscheduled inspection
Start date: 2017-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701769391
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701671880
Unscheduled inspection
Start date: 2017-06-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701552968
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-05-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701552972
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-05-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701452684
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701438695
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-03-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701312633
Unscheduled inspection
Start date: 2017-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701193771
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160700853997
Unscheduled inspection
Start date: 2016-09-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160601774334
Unscheduled inspection
Start date: 2016-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601697176
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used