Found 53 inspections:

# 00170803009071
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Commissioning of thermal power plants and heating networks


# 00170802797821
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-03, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants


# 742201533425
Unscheduled inspection
Start date: 2022-02-10, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101448056
Unscheduled inspection
Start date: 2021-12-15, end date: 2021-12-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the frame in the axes '6-8' and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742101321232
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 742101185830
Unscheduled inspection
Start date: 2021-10-12, end date: 2021-10-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of excavation work, foundation construction (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742101186049
Unscheduled inspection
Start date: 2021-10-19, end date: 2021-10-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of grillings in the axes of the building '1-8', the installation of the frame in the axes '6-8' and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which the requirements energy efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742101186080
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100602164
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration:
Authority:
Purpose of inspection:


# 742100338379
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 742100290734
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the excavation work, foundation construction (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100210382
Unscheduled inspection
Start date: 2021-05-20, end date: 2021-05-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on the installation of internal engineering systems, interior decoration and building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100041176
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of internal engineering systems, elevator equipment (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105317958
Unscheduled inspection
Start date: 2021-01-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005285778
Unscheduled inspection
Start date: 2020-12-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005186529
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741802308877
Unscheduled inspection
Start date: 2018-12-20, end date: 2019-01-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of fire-fighting sanitary and epidemiological measures to ensure access for low-mobility groups of the population, landscaping and small forms of internal engineering systems, roofing, facade, interior finishing works and elevators after completion of work, as well as the construction materials used during the construction of the capital construction facility, the results of such work, with the requirements of technical regulations and project documentation 2 Verification of the completed construction of the capital construction facility 3 Availability of a building permit 4 Meeting the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802031091
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 741802133576
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802151641
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of 13 floors in the "13" axes, the installation of windows and glazing of balconies in the "13" axes after completion of the installation of internal engineering systems in the "47" axes after completion of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Meeting the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801519753
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of 812 floors in the "13" axes after completion of the work with the installation of internal engineering systems in the "47" axes during the production process and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 The Urban Planning Code of the Russian Federation


# 741800634594
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of 37 floors in the "13" axes with the installation of windows and glazing of balconies in the "47" axes after completion of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800652005
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-08-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal heating networks, water supply, sewerage, the end of electricity supply, the end of landscaping to asphalt without small forms and landscaping, as well as the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800546060
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the internal power supply, exterior finishing works, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800491298
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the stylobate in axes 13 after completion of the work, the installation of windows and glazing of balconies in axes 47 during the production process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800396273
Unscheduled inspection
Start date: 2018-05-30, end date: 2018-06-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal heating networks, water supply, sewerage and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800295129
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of 9 floors, the installation of the roof in the "47" axes after completion of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800303596
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of window blocks before the installation of slopes and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741800223896
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800216507
Unscheduled inspection
Start date: 2018-03-28, end date: 2018-04-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of 68 floors in the "47" axes after completion of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800041912
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 00170803009071
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Commissioning of thermal power plants and heating networks


# 74170802967259
Unscheduled inspection
Start date: 2017-12-19, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802836537
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work in the "17" axes with the installation of the ribbon foundation in the "47" axes after completion of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 00170802797821
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-03, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants


# 74170802527127
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701906068
Unscheduled inspection
Start date: 2017-08-31, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701771236
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701665959
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701567968
Unscheduled inspection
Start date: 2017-04-27, end date: 2017-05-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of windows and glazing of balconies, the installation of elevators, the insulation of the technical floor floor, the roofing and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701559849
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed stage of the construction of the underground part of the building in axes 58 as well as the construction materials used during the construction of the capital construction facility with the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701378253
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the construction of the underground part of the building in axes 58 as well as the construction materials used during the construction of the capital construction facility and the results of such work with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701331287
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of structures of the 10th and technical floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701277341
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures of 79 floors and the building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701205076
Unscheduled inspection
Start date: 2016-12-07, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701243083
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the object2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701159075
Unscheduled inspection
Start date: 2016-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701061003
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of preparatory work, trench digging, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701131604
Unscheduled inspection
Start date: 2016-11-23, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160700973688
Unscheduled inspection
Start date: 2016-10-07, end date: 2016-10-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of concrete preparation and monolithic grillwork, the installation of foundation structures in axes 12, the installation of foundation structures in axes 23, backfilling and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700955472
Unscheduled inspection
Start date: 2016-10-07, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700427037
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601720806
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance of the completed facility and the construction materials used and products during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.