Found 1 inspection:

# 741903982010
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on fire protection of metal structures installation of walls from panels installation of facade glazing construction of internal walls installation of internal water supply and sewerage networks internal electrical installation of power supply networks construction of external water supply and sewerage networks installation of boiler room and used building materials during construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources.2 Availability of a construction permit.3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation.


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.