Found 59 inspections:

# 772101483311
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772100719861
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772100607809
Unscheduled inspection
Start date: 2021-09-03, end date: 2021-09-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100298800
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772100298796
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-28, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100298799
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772100298797
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-28, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100298798
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-28, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100298801
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-28, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100217152
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the inspection: to carry out control measures in connection with the receipt of a notice from the developer (customer), based on the received notice from the developer (customer) or the person carrying out the construction, the beginning of construction dated 04/22/2021 № 09-IO-205/21-(0)-0. The objectives of the audit are to prevent, identify and suppress violations of the requirements of project documentation and legislation on urban development activities committed by the person being audited. Subject of verification: compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of identified during construction control and the implementation of state construction supervision of violations of compliance of the performed works with the requirements of the project documentation.


# 772100217165
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance identified during construction control and state construction supervision completed works according to the requirements of the project documentation.


# 772100246157
Unscheduled inspection
Start date: 2021-05-31, end date: 2021-06-11, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100225750
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 772100047009
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772105305860
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772105308900
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005268745
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772005202487
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-27, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772005195202
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-23, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772004422338
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004420179
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to ensure that the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code complies with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including among the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 772004432675
Unscheduled inspection
Start date: 2020-06-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772004377164
Unscheduled inspection
Start date: 2020-04-06, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004388712
Unscheduled inspection
Start date: 2020-04-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004377113
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004296915
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772004280781
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-02-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004167808
Unscheduled inspection
Start date: 2020-01-10, end date: 2020-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used


# 772004171939
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772004237303
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 772004218717
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772004205838
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004198965
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 771904047094
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904070383
Unscheduled inspection
Start date: 2019-12-11, end date: 2020-01-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 771903952560
Unscheduled inspection
Start date: 2019-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 771903882626
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used


# 77190803469693
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 771903685454
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-09-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803489324
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803463683
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-07-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803436804
Unscheduled inspection
Start date: 2019-06-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803439029
Unscheduled inspection
Start date: 2019-06-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803445845
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803397213
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803379123
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803326541
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803305448
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803307075
Unscheduled inspection
Start date: 2018-12-24, end date: 2019-01-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803308633
Unscheduled inspection
Start date: 2018-12-27, end date: 2019-02-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803295665
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803299973
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803279432
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803279431
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803274476
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 771801795566
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-11-02, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: The purpose of ensuring the sanitary and epidemiological well-being of the population on the basis of Orders of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 01092017 708 "On the implementation of instructions from the Government of the Russian Federation dated 08082017 DM P954 pr" and from 27102017 980 "On Amendments to the Order of Rospotrebnadzor 01092017 708 "On the implementation of instructions from the Government of the Russian Federation dated 08082017 DM P954 pr" issued in order to implement the instructions of the Government of the Russian Federation from 08082017 DM P954 pr taskcontrol over compliance with mandatory requirements in the field of sanitary and epidemiological human well-being subject compliance with mandatory requirements


# 77180803143683
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803079673
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803071924
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.