# 742005195660
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004494187
Unscheduled inspection
Start date: 2020-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004445506
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004288706
Unscheduled inspection
Start date: 2020-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800009864
Unscheduled inspection
Start date: 2018-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802927925
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work breakdown of the conduit route installation of the trench base welding in a whip and laying of polyethylene pipes laying of a pipeline in a case assembly of the route fittings wells plungers protective powder of the route of sections 12 leakproofness tests flushing embedding into the existing route backfilling of the trench sealing the layout of section 3 and the construction materials used during the construction of the capital construction facility as well as the results of such works according to the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802730188
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the breakdown of the pipeline route the installation of a trench base welding in a whip and laying polyethylene pipes laying a pipeline in a case assembling the route fittings wells plungers protective powder of the route of section 3 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation