# 002005265231
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005326557
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005326081
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: 10
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of the previously issued regulation 4321130291 dated 18102019
# 002004286402
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the order of Rostechnadzor dated 15012020 15 On Conducting inspections of Compliance with Mandatory Requirements by Subjects of the electric power industry, Heat Supply Organizations, Heating Grid Organizations and Consumers of Electric energy in 2020 issued in accordance with the instruction of the Government of the Russian Federation in the field of electric power and heat supply dated 30122019 DKP911542
# 001800214706
Unscheduled inspection
Start date: 2018-03-15, end date: 2018-04-03, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to assess the possibility of meeting licensing requirements when operating explosive and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III obtaining education using storing transporting flammable oxidizing combustible explosive toxic highly toxic substances and substances dangerous to the environment at facilities using operating at facilities of equipment operating under excessive pressure of more than 007 megapascals of steam gas in the gaseous liquefied state of water at a heating temperature of more than 115 degrees Celsius and other liquids at a temperature exceeding their boiling point at an excess pressure of 007 megapascals, the inspection is carried out according to the application received by the Volga Administration of Rostechnadzor from 28022018 10256c for the renewal of the license from 20072011 VP43004815 The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts compliance with the information contained in in the application and documents of a legal entity or an individual entrepreneur for granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity or an individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on the specified legal entities and individual entrepreneurs contained in the unified State Register of Legal Entities, the unified State Register of Individual Entrepreneurs and other federal information resources
# 00170802808208
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00150601437731
Unscheduled inspection
Start date: 2015-12-21, end date: 2015-12-28, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the issued regulation dated 200515 432130130113 p131
# 162101437025
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162101436960
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Compliance with the instructions of state control (supervision) bodies, municipal control bodies
# 162101436463
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162101421174
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Compliance with the instructions of state control (supervision) bodies, municipal control bodies
# 162101509899
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162101416198
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162101487870
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162101488080
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of completed works during the construction of a capital construction facility, project documentation
# 162101487702
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162101318332
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162101297927
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162101297859
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162101297799
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162101312398
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162101371551
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the fact of execution of the order dated 10/14/2021 No. 14-12/0211-01, the deadline for which expired on 11/15/2021 and drawing up an act based on the results of the check. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is the fulfillment of the instructions of state control (supervision) bodies and municipal control bodies.
# 162101204824
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162101147025
Unscheduled inspection
Start date: 2021-10-05, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Compliance with the instructions of state control (supervision) bodies, municipal control bodies
# 162101161810
Unscheduled inspection
Start date: 2021-10-05, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162101244050
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162100697005
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the notice received by the Inspectorate dated 09/06/2021 No. 9722 on the completion of the construction of the capital construction facility.
# 162100700339
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction of a capital construction facility of building materials, the results of such works with the requirements of design documentation; prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of an agreement with the developer or the customer; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100695968
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100695866
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162100696806
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the notice received by the Inspectorate dated 09/06/2021 No. 9722 on the completion of the construction of the capital construction facility.
# 162100701033
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100639883
Unscheduled inspection
Start date: 2021-09-09, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction of a capital construction facility of building materials, the results of such works with the requirements of design documentation; prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of an agreement with the developer or the customer; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100639320
Unscheduled inspection
Start date: 2021-09-09, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction of a capital construction facility of building materials, the results of such works with the requirements of design documentation; prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of an agreement with the developer or the customer; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100957674
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 07/21/2021 case No. 14-04-2021/0016. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.
# 162100902025
Unscheduled inspection
Start date: 2021-09-23, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on notice No. 10296 dated 09/20/2021 received by the Inspectorate on the elimination of violations during construction and reconstruction of a capital construction facility, which were ordered to be eliminated. within the period established by the regulation dated 08/16/2021 No. 13-12/0295-02, until 10/15/2021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.
The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies.
# 162100812598
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162100421578
Unscheduled inspection
Start date: 2021-08-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162100507363
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100359473
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100398411
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction of a capital construction facility of building materials, the results of such works with the requirements of design documentation; prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of an agreement with the developer or the customer; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100390319
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100364395
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100258136
Unscheduled inspection
Start date: 2021-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100258003
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-05-12, duration: 20
Authority: Gosudarstvennaya zhilischnaya inspekciya Respubliki Tatarstan
Purpose of inspection: Compliance with mandatory requirements and (or) requirements established by municipal legal acts; implementation of regional state housing supervision; Quality of public utilities (See provision of public utilities)
# 162100152967
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-14, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 162100188640
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed reconstruction facility, in accordance with the Inspection's notice dated 04/27/2021 No. 4091 on the completion of the reconstruction of the capital construction facility. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.
# 162100188486
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the Inspection notification dated 04/27/2021 No. 4089 on the elimination of violations during construction, reconstruction of the capital construction facility, which was ordered to eliminate within the period established by the order dated 02/19/2021 No. 14-12/0020-01, until 04/30/2021, the objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts acts and project documentation. The subject of this audit is the fulfillment of the instructions of state control (supervision) bodies and municipal control bodies.
# 162100178764
Unscheduled inspection
Start date: 2021-04-27, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Respublike Tatarstan (Tatarstan)
Purpose of inspection: purpose: execution of orders of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 No. 131 "On inspections of working conditions of foreign citizens involved in the implementation of major investment projects", dated 04/06/2021 No. 147 "On Amendments to the Order of Rospotrebnadzor dated 04/02/2021 No. 131"
task: supervision and control over the fulfillment of mandatory requirements of the legislation of the Russian Federation in the field of ensuring the sanitary and epidemiological welfare of the population.
subject: compliance with a set of mandatory requirements
# 162100067305
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Compliance with the instructions of state control (supervision) bodies, municipal control bodies
# 162100067493
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-03-31, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.
# 162100032494
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-04-07, duration: 20
Authority: Ministerstvo po delam grazhdanskoi oborony i chrezvychainym situaciyam Respubliki Tatarstan
Purpose of inspection: Purpose: to monitor the implementation of Regulation No. 48/4/11-3 dated March 12, 2020 on the elimination of violations of established requirements in the field of protection of the population and territories from emergency situations, issued by the state supervisory authority, with a deadline for elimination by 03/10/2021. Task: to verify the fulfillment of requirements and measures in the field of protection of the population and territories from natural and man-made emergencies established by the legislation of the Russian Federation, the legislation of the Republic of Tatarstan, and other regulatory legal acts of the Russian Federation and the Republic of Tatarstan. The subject of the audit: compliance with the regulations of state control (supervision) bodies, municipal control bodies.
# 162105333191
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162005271903
Unscheduled inspection
Start date: 2020-12-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162005271879
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-28, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 162005271864
Unscheduled inspection
Start date: 2020-12-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162005271817
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-28, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 162005271801
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-28, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 162005271717
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-28, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 08122020 14003 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 08122020 14120301 to 25122020
# 162005271748
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-28, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 162005245998
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 002005265231
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-18, duration: 10
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination by a legal entity of previously identified violations of the mandatory requirements specified in paragraphs 116 of Regulation 4321139068 of 12032020
# 162005133561
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-10-14, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublike Tatarstan
Purpose of inspection: Conducting control and supervision measures to comply with the land legislation of the Russian Federation at the request of the Prosecutor's Office of the Republic of Tatarstan dated 14082020 7472020
# 162005186522
Unscheduled inspection
Start date: 2020-10-20, end date: 2020-10-27, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 14022019 case 141120180020 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004491531
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-08-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 12082020 case 131120200047 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004460384
Unscheduled inspection
Start date: 2020-07-23, end date: 2020-07-27, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 14022019 case 141120180020 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004399529
Unscheduled inspection
Start date: 2020-04-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004396165
Unscheduled inspection
Start date: 2020-04-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004321536
Unscheduled inspection
Start date: 2020-03-11, end date: —, duration: —
Authority: Ministerstvo po delam grazhdanskoi oborony i chrezvychainym situaciyam Respubliki Tatarstan
Purpose of inspection:
# 162004344893
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection by notification dated 04032020 2290 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. mandatory requirements and or requirements established by municipal legal acts
# 002005326557
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: 10
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the fulfillment of the prescription
# 002005326081
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: 10
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of the previously issued regulation 4321130291 dated 18102019
# 002004286402
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the order of Rostechnadzor dated 15012020 15 On Conducting inspections of Compliance with Mandatory Requirements by Subjects of the electric power industry, Heat Supply Organizations, Heating Grid Organizations and Consumers of Electric energy in 2020 issued in accordance with the instruction of the Government of the Russian Federation in the field of electric power and heat supply dated 30122019 DKP911542
# 162004227795
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004203058
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 22.012019 case 140420190002 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004203013
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161904029611
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-23, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees
# 161903961390
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-12-05, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms reasoned submission to the State Labor Inspectorate 16365219PV dated 08112019
# 161903972549
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161903887522
Unscheduled inspection
Start date: 2019-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903810626
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Respublike Tatarstan Tatarstan
Purpose of inspection:
# 161903574940
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161903575218
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161903085606
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902966641
Unscheduled inspection
Start date: 2019-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902958109
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-09-10, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Respublike Tatarstan Tatarstan
Purpose of inspection: To establish that the real test is carried out on the basis of the Declaration on the granting of the license for implementation of activities in the use of infectious agents of humans and animals, except if the activity is carried out for medical purposes and gennoingenerian organisms III and IV degree of potential hazard carried out in closed systems Joint stock company "Special economic zone promyshlennoproizvodstvennaya type "Alabuga" The water treatment plant Rin 2802813 from 05082019 zadachami of this review are to assess the implementation of the mandatory requirements of the legislation of the Russian Federation in the implementation of activities in the use of infectious agents of humans and animals, except if the activity is carried out for medical purposes and gennoingenerian organisms III and IV degree of potential hazard carried out in a closed systemoperator of this review is to note the need to comply with the mandatory requirements and or requirements compliance information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the appropriate unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval of the mandatory requirements as well as data about the specified legal entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual entrepreneurs and other Federal information resources
# 161902888184
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161902893510
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation
# 161902800581
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-13, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Respubliki Tatarstan
Purpose of inspection: verification of regulation EL4962 from 05062019
# 161902715798
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of the design documentation prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 161902715740
Unscheduled inspection
Start date: 2019-05-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902786229
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-05, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Respubliki Tatarstan
Purpose of inspection: verification of citizens' requests
# 161902717488
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts
# 161902642271
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the construction materials used in the process of reconstruction of the capital construction facility with the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, prevention and detection and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer. construction of a capital construction facility works according to the requirements of the project documentation compliance with mandatory requirements and or requirements established by municipal legal acts
# 161902625649
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the fact of execution of the order dated 25.012019 1412000701, which expired on 29032019, and to draw up an act based on the results of the check.
# 161902568476
Unscheduled inspection
Start date: 2019-03-13, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902557371
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902573559
Unscheduled inspection
Start date: 2019-03-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902544370
Unscheduled inspection
Start date: 2019-03-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902526678
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-02-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the eliminated violations with the requirements of the project documentation of other normative acts norms and rules as well as for the purpose of drawing up an act on the elimination of violations