Found 50 inspections:

# 002005199057
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1420 dated October 2, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005224482
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 1620 dated October 26, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005224489
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005212127
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005212119
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1020 dated September 7, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005212112
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1120 dated September 7, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005217285
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1320 dated September 14, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005217282
Unscheduled inspection
Start date: 2020-11-13, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005217277
Unscheduled inspection
Start date: 2020-11-13, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004268091
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, an individual entrepreneur, of the points of the order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements 570909019C dated October 30, 2019. The objectives of this audit are to verify that the legal entity eliminates the violations identified in the paragraphs of the order 570909019C dated October 30, 2019. The purpose of this audit is to comply with the instructions of the state control and supervision authorities. municipal control


# 002004268067
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574087 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 002004268059
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574086 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 002004268051
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004268014
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574088 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 001903759079
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00160601567094
Unscheduled inspection
Start date: 2016-04-13, end date: 2016-05-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility


# 892101433054
Unscheduled inspection
Start date: 2021-11-24, end date: 2021-03-05, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: The verification is carried out in order to: - verification of compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (including taking into account changes made to the working documentation and which are in accordance with with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation as part of such project documentation) and (or) an information model; - verification of compliance with the requirement for a construction permit; - verification of compliance with the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; - verification of compliance with the requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts. The objectives of the audit are: prevention, detection and suppression of violations of legislation on urban development, project documentation, as well as other mandatory requirements. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 892101382716
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection:


# 722100313498
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: -inspections of a capital construction facility completed on the basis of completion notice No. 01/21 dated June 15, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation and energy efficiency requirements during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. -the subject of this audit is (please note): ۷ compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; meeting the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 722100293321
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: -inspections of a capital construction facility completed on the basis of completion notice No. 8/21 dated May 28, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. -the subject of this audit is (please note): compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; meeting the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 722100185779
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration: 10
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: -inspections of a capital construction facility completed on the basis of completion notice No. 7/21 dated April 16, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. -the subject of this audit is (please note): compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; meeting the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 772100192495
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: This inspection is carried out for the purpose of: monitoring compliance with the working conditions of foreign citizens involved in the implementation of major investment projects, taking into account restrictive measures taken during the spread of coronavirus infection, based on Order No. 131 of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 "On inspections of working conditions of foreign citizens Federal Service for Supervision of Consumer Rights Protection and Human Welfare No. 147 dated 04/06/2021 "On Amendments to Rospotrebnadzor Order No. 131 dated 04/02/2021 "On Inspections of Working Conditions of Foreign Citizens Involved in the implementation of major Investment Projects", issued in order to implement paragraph 5.2 Minutes of the operational meeting of the Security Council of the Russian Federation dated 02/23/2021, approved by the President of the Russian Federation V.V.Putin on 03/05/2021 № Pr-356. The objectives of this audit are: monitoring compliance with mandatory requirements in the field of sanitary and epidemiological well-being of a person.The subject of this audit is: compliance with mandatory requirements. conducting events: to prevent harm to the life and health of citizens


# 512100166451
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-14, duration: 13
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Murmanskoi oblasti
Purpose of inspection: Purpose: execution of Order No. 131 of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 "On inspections of working conditions of foreign citizens involved in the implementation of investment projects", adopted in order to implement paragraph 5.2 of the Protocol of the meeting of the Security Council of the Russian Federation dated 02/02/2021, by the President of the Russian Federation V.V. Putin on 03/05/2021 No. 356 Ave. The objectives of this audit are: to assess the compliance of the activities or actions (inaction) of a legal entity, individual entrepreneur, goods produced and sold by them (work performed, services provided) with the mandatory requirements of the legislation of the Russian Federation in the field of sanitary and epidemiological welfare of the population, legislation on technical regulation. The subject of this audit is compliance with mandatory requirements.


# 892100229280
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v YAmalo-Neneckom avtonomnom okruge
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms, pursuant to paragraph 5.2 of the Protocol of the conference call of the Security Council of the Russian Federation No. Pr-356, approved by the President of the Russian Federation V.V. Putin on 02/23/2021, the order of the Federal Labor Service and No. 73 dated 04/02/2021 "On conducting unscheduled on-site inspections of the working conditions of foreign citizens involved in the implementation of major investment projects" and the implementation of the schedule of inspections of these employers


# 722100076461
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-15, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: -inspections of a capital construction facility completed on the basis of completion notice No. 5/21 dated March 9, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation and energy efficiency requirements during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. -the subject of this audit is (please note): compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; fulfillment of the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 722100062091
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-04-08, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: -inspections of a capital construction facility completed on the basis of completion notice No. 4/21 dated February 26, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. -the subject of this audit is (please note): compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; meeting the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002005199057
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1420 dated October 2, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005224482
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 1620 dated October 26, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005224489
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1720 dated September 26, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005212127
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice No. 820 dated September 1, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005212124
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-12-08, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice No. 920 dated September 1, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005212119
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1020 dated September 7, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005212112
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1120 dated September 7, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005217285
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1320 dated September 14, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005217282
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 1220 dated September 14, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002005217277
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 1520 dated September 14, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements regulatory documents and legislative acts the subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by the parts 2 3 and 3_1 of Article 52 of this Code


# 002004268091
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, an individual entrepreneur, of the points of the order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements 570909019C dated October 30, 2019. The objectives of this audit are to verify that the legal entity eliminates the violations identified in the paragraphs of the order 570909019C dated October 30, 2019. The purpose of this audit is to comply with the instructions of the state control and supervision authorities. municipal control


# 002004268072
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 575529 dated August 9, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 002004268067
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574087 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 002004268059
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574086 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 002004268051
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 576879 dated September 30, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 002004268014
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574088 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 001903759101
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 575529 dated August 9, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 001903759090
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574088 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 001903759086
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574086 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 001903759079
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574087 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 001903759072
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-30, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 574085 dated June 11, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the audit is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code


# 721902580242
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-04-12, duration:
Authority: Gosudarstvennaya inspekciya truda v YAmaloNeneckom avtonomnom okruge
Purpose of inspection: This audit is conducted in order to protect the rights and interests of employees of Arctic LNG 2 LLC. According to information received from the Department of Economics of the Novy Urengoy City Administration, the objectives of this audit are to monitor compliance with mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms and to assess the compliance of a legal entity's activities with mandatory requirements of labor legislation and other regulatory legal acts protection of labor rights and freedoms of employees of the enterprise prevention of violations of mandatory requirements of labor legislation and other regulatory legal acts containing norms of labor law The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 00160601567098
Unscheduled inspection
Start date: 2016-04-13, end date: 2016-05-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility


# 00160601567094
Unscheduled inspection
Start date: 2016-04-13, end date: 2016-05-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.