Found 107 inspections:

# 771902929215
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-06, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu Zaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya ot 17062019 7771998719OB Zadachami proverki yavlyayutsya nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami sootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyam sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe znachenie nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera po obespecheniyu bezopasnosti gosudarstva po likvidacii posledstvii prichineniya takogo vreda


# 77190803371800
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-04-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803323521
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803309256
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803295959
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803261542
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771801992471
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-11-20, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu zaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya ot 13092018 g 73182418OB oplaty truda Zadachami proverki yavlyayutsya nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami sootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyam sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe znachenie nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera po obespecheniyu bezopasnosti gosudarstva po likvidacii posledstvii prichineniya takogo vreda


# 77180803261616
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803244625
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803223399
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803233476
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803218953
Unscheduled inspection
Start date: 2018-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803223717
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-09-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803193234
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803178751
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803175060
Unscheduled inspection
Start date: 2018-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803177040
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803149116
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-06-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803121708
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803117391
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803114511
Unscheduled inspection
Start date: 2018-03-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803113319
Unscheduled inspection
Start date: 2018-03-30, end date: 2018-04-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803091378
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803087518
Unscheduled inspection
Start date: 2018-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803082020
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803075196
Unscheduled inspection
Start date: 2018-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803090859
Unscheduled inspection
Start date: 2018-02-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803082055
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803066620
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803068084
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-02-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802993086
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77170803002079
Unscheduled inspection
Start date: 2017-12-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802820665
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802898155
Unscheduled inspection
Start date: 2017-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802883911
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-12-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802883041
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802855059
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802381012
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802760584
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802735064
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-10-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802138497
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-10-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802316196
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802646683
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701885224
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701862946
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170801916867
Unscheduled inspection
Start date: 2017-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170801927651
Unscheduled inspection
Start date: 2017-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701793124
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701802920
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701839330
Unscheduled inspection
Start date: 2017-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701745131
Unscheduled inspection
Start date: 2017-06-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701674215
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701677166
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701670445
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701607159
Unscheduled inspection
Start date: 2017-05-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701645684
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701689079
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701585436
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701555184
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701464720
Unscheduled inspection
Start date: 2017-03-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701464719
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701453545
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-03-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701444525
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701497531
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701466344
Unscheduled inspection
Start date: 2017-03-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701434100
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701465157
Unscheduled inspection
Start date: 2017-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701481740
Unscheduled inspection
Start date: 2017-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701375376
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701375274
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701352490
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701333262
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701333260
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701332019
Unscheduled inspection
Start date: 2017-01-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701333875
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701249241
Unscheduled inspection
Start date: 2016-12-16, end date: 2016-12-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701243357
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701227540
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701220195
Unscheduled inspection
Start date: 2016-12-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701221828
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701193769
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701193279
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation verification of compliance with the requirements for works that are subject to verification on the basis of a notification received from the developer customer or person carrying out construction on the completion dates of works that are subject to verification if the deadline for the completion of such works does not coincide with the deadlines specified in the verification program The tasks of this audit are prevention detection and suppression of violations of technical regulations and project documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701264849
Unscheduled inspection
Start date: 2016-12-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701104735
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701128997
Unscheduled inspection
Start date: 2016-11-30, end date: 2016-12-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: cel sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachi preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmet sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 77160701128965
Unscheduled inspection
Start date: 2016-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701101939
Unscheduled inspection
Start date: 2016-11-09, end date: 2016-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701131775
Unscheduled inspection
Start date: 2016-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700958609
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Cel proverki sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachi proverki preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmet proverki proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 874416 ot 26082016 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 77160701051561
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-10-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 958816 ot 26092016


# 77160701055756
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 77160701055664
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 77160700845910
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160700831058
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160700216153
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700215666
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-10-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700155717
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700049369
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-08-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 782916 ot 01082016


# 77160700049261
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-08-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 783916 ot 01082016


# 77160601744044
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601801950
Unscheduled inspection
Start date: 2016-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700048058
Unscheduled inspection
Start date: 2016-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601734624
Unscheduled inspection
Start date: 2016-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601734522
Unscheduled inspection
Start date: 2016-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601732498
Unscheduled inspection
Start date: 2016-07-21, end date: 2016-07-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 557616 ot 14062016


# 77160601732536
Unscheduled inspection
Start date: 2016-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77150600065768
Unscheduled inspection
Start date: 2015-08-11, end date: 2015-08-18, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control of a previously issued prescription


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.