Found 15 inspections:

# 742100239099
Unscheduled inspection
Start date: 2021-05-28, end date: 2021-06-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of enclosing structures of wall sandwich panels and interior walls, the installation of monolithic floor-to-floor ceilings, the filling of window and door openings and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities buildings that are not covered by energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742005255477
Unscheduled inspection
Start date: 2020-12-08, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004430405
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of the work on the installation of a monolithic retaining wall and foundation beams for the installation of a steel frame frame for columns, beams, struts of the first tier in the rows of AG ”in axes 1012” and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code and project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply. and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004383139
Unscheduled inspection
Start date: 2020-04-10, end date: 2020-04-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of the work on the installation of monolithic columnar foundations with the installation of anchor bolts and concrete grillings in rows B1 G” in axes 1 12” top on otm 0400 monolithic foundation beams for thermal insulation of the basement, waterproofing of foundations and backfilling of excavation sinuses in axes A G” 1 12” and the construction materials used during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation


# 742004274254
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic columnar foundations with the installation of anchor bolts and concrete grillings in rows A B” in axes 1 12” top on otm 0400 and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply and equipment of the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004114161
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-02-07, duration:
Authority: Ministerstvo ekologii CHelyabinskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of p2 of the instruction on the elimination of violations of legislation in the field of environmental protection dated 09/12/2018 51 issued by the Ministry The subject is the fulfillment by a legal entity of the instruction of the state control and supervision authority The tasks of detecting preventing and suppressing violations of environmental legislation


# 742004189558
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741904062750
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the object2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902613924
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-17, duration:
Authority: Ministerstvo ekologii CHelyabinskoi oblasti
Purpose of inspection: The purpose is to control the execution of the regulation The task is to identify prevent and suppress violations of environmental legislation The subject is to comply with the regulations of the state control bodies


# 741902597751
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741801914956
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-09, duration:
Authority: Ministerstvo ekologii CHelyabinskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of previously issued regulations of the state control authority for supervision tasks, to prevent violations specified in the reasoned submission of the task, to take measures to monitor the implementation of regulations previously issued by the state control authority for supervision, the deadline for which has expired


# 001800349221
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-11, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 26022018h216, the deadline for which has expired. The objectives of this inspection are to take measures to control the elimination of violations specified in paragraphs of the instruction from 26022018h216. The subject of this inspection is to comply with the instructions of the state control and supervision authorities


# 74170803027455
Unscheduled inspection
Start date: 2017-12-28, end date: 2018-02-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 74170802908855
Unscheduled inspection
Start date: 2017-12-06, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802816385
Unscheduled inspection
Start date: 2017-11-15, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.