Found 100 inspections:

# 001902995392
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-30, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the previously issued prescription from 28092018 Cb4849rP3 the deadline for which expires 02092019the objectives of this audit are to carry out measures to control the elimination of violations of the previously issued prescription from 28092018 Cb4849rP3 The subject of this audit is the fulfillment of the instructions of the state control supervision bodies


# 001902751987
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-14, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment by JSC "ETC" of the points of the previously issued instruction on the elimination of identified violations from 28032019 CB1090PP The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001902676064
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-04-30, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the previously issued prescription from 28092018 Cb4849rP2 the deadline for which expired on 29032019 The objectives of this audit are to carry out measures to control the elimination of violations of the previously issued prescription from 28092018 Cb4849rP2 The subject of this audit is the fulfillment of the instructions of the state control supervision bodies


# 001902608586
Unscheduled inspection
Start date: 2019-03-26, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 662101442056
Unscheduled inspection
Start date: 2021-12-09, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662101440115
Unscheduled inspection
Start date: 2021-12-09, end date: 2021-12-24, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 53522 dated 03.12.2021, in accordance with the inspection program dated 07.10.2020 No. 29-15-15/283-20, the task of this inspection is: the implementation of regional state construction supervision. The subject of this audit is: checking the compliance of the work and the construction materials used in the construction of the capital construction facility "Thermal network from the thermal chamber TK1 to the outer wall of residential buildings under construction No. 4A and No. 4B ", located at the address: Yekaterinburg, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including the requirements of energy efficiency (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662101422621
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 662101298520
Unscheduled inspection
Start date: 2021-11-08, end date: 2021-11-26, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-15-24/201-21 dated 08/02/2021, the task of this inspection is: the implementation of regional state construction supervision. The subject of this review is to verify compliance of work and construction materials used in the construction process of capital construction object "- the building of the gas boiler (No. 1 in ROM) smokestack (No. 2 ROM), - MITS 10/0,4 kV (No. 3 at the ROM), tank emergency water storage overhead No. 1 (No. 4.1 ROM), tank emergency water storage overhead No. 2 (No. 4.2 ROM), reservoir industrial wastewater underground (No. 5 in ROM), reservoir horizontal double wall steel underground storage of diesel fuel No. 1 (No. 6.1 in ROM), reservoir horizontal double wall steel underground storage of diesel fuel No. 2 (No. 6.2 to ROM), reservoir horizontal single wall steel underground for emergency spills of diesel fuel and drains (No. 7 in ROM), reservoir horizontal single wall steel underground to collect stormwater runoff from the site of the tanker (#8 ROM), - for the closet gas control point (#10 ROM), receiver RV-900 (No. 12 on ROM)", located at the address: Russia, Yekaterinburg, Sibirskiy trakt, 14 km, and the results of such work requirements approved in accordance with parts 15, 15.2 and 15.3 of article 48 of the town planning code of the Russian Federation project documentation (including changes to the project documentation in accordance with paragraphs 3.8 and 3.9 of article 49 of the town planning code of the Russian Federation) and (or) information model (in the case that the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation)including the requirements for energy efficiency (with the exception of capital construction objects, for which the requirements for energy efficiency are not distributing.


# 662101056493
Unscheduled inspection
Start date: 2021-10-07, end date: 2021-11-03, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. ot; The tasks are to carry out regional state construction supervision; The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility: Thermal network 2Du125 from the thermal chamber TK31-17 to the outer wall of a residential building located at the address: Yekaterinburg, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (except for capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation, verification of previously issued regulation 29-15-29/145 of 07/28/2021.


# 662100396758
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100397940
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100587134
Unscheduled inspection
Start date: 2021-09-02, end date: 2021-09-15, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The goal is the implementation of the program of inspections No. 29-15-24/201-21 from 2021-08-02; Task - implementation of regional state construction supervision; Object - verification of conformity of work and applicable building materials during the construction of the construction of the Building of the gas boiler (No. 1 in ROM) smokestack (No. 2 ROM), - MITS 10/0,4 kV (No. 3 at the ROM), tank emergency water storage overhead No. 1 (No. 4.1 ROM), tank emergency water storage overhead No. 2 (No. 4.2 ROM), - tank industrial wastewater underground (No. 5 in ROM), reservoir horizontal double wall steel underground storage of diesel fuel No. 1 (No. 6.1 in ROM), reservoir horizontal double wall steel underground storage of diesel fuel No. 2 (No. 6.2 to ROM), reservoir horizontal single wall steel underground for emergency spills of diesel fuel and drains (No. 7 in ROM), reservoir horizontal single wall steel underground to collect stormwater runoff from the site of the tanker (#8 ROM), - for the closet gas control point (#10 ROM), receiver RV-900 (No. 12 on ROM), located at the address: Russia, Yekaterinburg, Sibirskiy trakt, 14 km, the results of such work requirements approved in accordance with parts 15, 15.2 and 15.3 of article 48 of the town planning code of the Russian Federation, project documentation, including the requirements for energy efficiency (with the exception of capital construction objects, for which the energy performance requirements do not apply) and the requirements of the equipment of a capital construction object metering devices of energy resources; the availability of building permits; compliance, established in parts 2, 3 and 3.1 of article 52 of the town planning code of the Russian Federation.


# 662100264671
Unscheduled inspection
Start date: 2021-07-01, end date: 2021-07-28, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. ot; The tasks are to carry out regional state construction supervision; The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility: Thermal network 2Du125 from the thermal chamber TK31-17 to the outer wall of a residential building located at the address: Yekaterinburg, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (except for capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100281371
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-07-12, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to check the completed construction of the capital construction facility on the basis of the notice of completion of construction No. 22921 dated 05/28/2021 ; Tasks - implementation of regional state construction supervision; Subject - verification of compliance with the performance of works and applicable building materials during the construction of the capital construction facility: Thermal network from TK-1 to TK-2 with a TK-2 camera – 1st stage of construction; thermal network from TK-2 to the outer wall of an apartment building of the 1st stage of construction – 2nd stage of construction; thermal network from TK-2 to TK-3 and from TK-3 to the outer wall of an apartment building 2 the construction phase is the 3rd stage of construction, located at the address: Yekaterinburg, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements equipment of the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100308013
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-24, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Celi proverki: Rassmotrenie obrascheniya; Zadachi proverki: oosuschestvlenie regionalnogo gosudarstvennogo zhilischnogo nadzora (reestrovyi nomer v FGIS «FRGU» 6600000010001464693); Predmet proverki: soblyudenie obyazatelnyh trebovanii k soblyudenie obyazatelnyh trebovanii k predostavleniyu kommunalnyh uslug sobstvennikam i polzovatelyam pomeschenii v mnogokvartirnyh domah i zhilyh domah


# 662100302629
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100281340
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 662100262971
Unscheduled inspection
Start date: 2021-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 662100263186
Unscheduled inspection
Start date: 2021-06-04, end date: 2021-07-02, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/300-20 dated 2020-10-15; Tasks are to carry out regional state construction supervision; The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility: The thermal network from the projected thermal chamber TK1 to the previously designed thermal chamber UT, located at the address: Yekaterinburg, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction projects for which the requirements energy efficiency does not apply) and the requirements of equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100151834
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-14, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose - implementation of the inspection program No. 29-15-15/200-20 dated 2021-04-09; Tasks - implementation of regional state construction supervision; Subject - verification of compliance of work and applicable building materials during the construction of a capital construction facility: Thermal network from TK-1 to TK-2 with a TK-2 camera – 1st stage of construction; thermal network from TK-2 to the outer wall of an apartment building of the 1st stage of construction – 2nd stage of construction; thermal network from TK-2 to TK-3 and from TK-3 to the outer wall of an apartment building 2 the construction phase is the 3rd stage of construction, located at the address: Yekaterinburg, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements equipment of the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100151845
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-14, duration: 18
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose - implementation of the inspection program No. 29-15-15/254-20 dated 2021-04-09; Tasks - implementation of regional state construction supervision; Subject - verification of compliance of work and applicable building materials during the construction of a capital construction facility: Thermal network 2Du125 from the projected thermal chamber TK2 to the outer wall of an apartment building under construction located at the address: Yekaterinburg, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (except for capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100172838
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-05-28, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-15/307-20 dated 2020-10-20; Tasks are to carry out regional state construction supervision; The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility: Reconstruction of the heat network from KN 66:41:0000000:91992 during the construction of the facility: "New building of MAOU – Lyceum No. 173", on the site from TC 074-4 to TC 074-8, located at the address: Yekaterinburg, the results of such work meet the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code In the Russian Federation, project documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100172558
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-25, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose - implementation of the inspection program No. 29-15-15/283-20 dated 2020-10-07; Tasks - implementation of regional state construction supervision; Subject - verification of compliance of work and applicable building materials during the construction of a capital construction facility: The thermal network from the thermal chamber TK1 to the outer wall of residential buildings No. 4A and No. 4B under construction, located at the address: Yekaterinburg, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (except for capital construction facilities energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100183963
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-05-06, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this check is carried out for the purpose of: Consideration of the appeal (dated 01/22/2021 No. 29-01-01-1228/1, dated 02/04/2021 No. 29-01-01-2523/1, dated 02/18/2021 No. 29-01-01-4292/1, dated 30.03.2021 No. 29-01-01-8184/1) the objectives of this check are: implementation of Housing supervision


# 662100067027
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-03-31, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection: implementation of the inspection program 29-15-15/275-20 (upon notification of completion of construction). The objectives of this audit are: the implementation of regional state construction supervision. Subject of verification: compliance of the work performed and applicable building materials during the construction of the capital construction facility Thermal network from the reconstructed thermal chamber TK38-08 to the wall of a seventeen-storey residential building under construction, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, as well as the availability of a permit for the construction and fulfillment of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662105353093
Unscheduled inspection
Start date: 2021-02-16, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100023932
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-10, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-15-17/355-20 dated 2020-11-20; Tasks - implementation of regional state construction supervision; Subject - verification of compliance of work and applicable building materials during the construction of a capital construction facility: Thermal network from TK3 to UT3, thermal network from UT3 to the outer wall of a residential building located at the address: Yekaterinburg, the results of such work meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (except for capital construction projects, to which the requirements of energy efficiency do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662105332175
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662105309230
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-02-11, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection: verification of the previously issued regulation No. 29-15-22/240 dated 10/14/2020. The objectives of this audit are: the implementation of regional state construction supervision. The subject of the audit: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 10/14/2020 No. 29-15-22/240, issued by JSC Yekaterinburg Heating Grid Company.


# 662105301433
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 662105338081
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-02-15, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms. This check is carried out in order to protect the rights and interests of employees (in connection with the received notification from the employee Mikhailov V.A., reg. no. 66/7-9403-20- ABOUT).


# 662105314629
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 662105311629
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed capital construction facility "Thermal network in the section from the projected thermal chamber TK3 to the outer wall of the underground parking lot", located at: Yekaterinburg, Shcherbakova Street – Miasskaya Street – Shirokiy Lane, based on the notice of completion of the capital construction facility dated 12.01.2021. № 1068.


# 662105314667
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed capital construction facility "Thermal network from the existing thermal chamber TK38-25b (PK0) to commissioning into the building under construction (PK4+69.9)", located at the address: Yekaterinburg, Nikolay Ostrovsky str. on the basis of a notice of completion of the capital construction facility. dated 01/18/2021 No. 2049.


# 662005270219
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-25, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29150112618 from 12042018 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network from chamber UT2 to chamber UT4 inclusive 1st stage of construction thermal network from chamber UT4 to the outer wall of an apartment building 4 2nd stage of construction thermal network from chamber UT4 to the outer wall of an apartment building 5 The 3rd stage of construction located at the address Sverdlovsk region Yekaterinburg of the results of such work to building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 662005258315
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005225434
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed construction of the capital construction facility Thermal network from TK1 to the border of the land plot with the device of thermal chambers TK2 TK3 located at Yekaterinburg on the basis of the notice of completion of the construction of the capital construction facility of 03112020 41075 in accordance with the inspection program of 23062020 29151714720 subparagraph "a" of paragraph 2 of part 5 of Article 54 of the Urban Planning Code of the Russian Federation The task of this audit is to carry out regional state construction supervision


# 662005267006
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority:
Purpose of inspection:


# 662005258784
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-23, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed capital construction facility Thermal network in the section from the TK2719 sch connection chamber to the point of docking with the indoor heating networks located at Yekaterinburg on the basis of the notice of completion of the capital construction facility vh dated 02122020 44890 as well as on the basis of verification of control over the execution of previously issued orders to eliminate violations of mandatory requirements from 31082020 291522181 1 from 31082020 291522181 2


# 662005222825
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of a capital construction facility completed on the basis of a notice of completion of construction bx 41070 dated 03112020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network from the thermal chamber UT1 TC 2182 to the boundary of the land plot of the projected multi-level parking lot t NO1 located at Sverdlovsk region Yekaterinburg Novgorodtseva St. results such works are subject to construction norms and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662005222992
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662005233358
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-18, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed construction of the capital construction facility on the basis of the notice of completion of construction vh 42265 from 12112020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network on the site from TK1 projected to the border of docking with on-site thermal networks located at the address Sverdlovsk region Yekaterinburg Pervomaiskaya street the results of such work to the construction norms and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662005208580
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the program of inspections 29151523020 from 26082020 Task implementation of state construction supervision of the object verification of compliance of work and applicable building materials at the capital construction site Heating network in sections from TK1 projected to a residential building at Krasnye Komandirov str. 16 from TK030301 sch to the building at Lobkova str. 2 located at Sverdlovsk region Yekaterinburg str. Strikes the results of such work construction norms and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662005204500
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 662005204422
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 662005212287
Unscheduled inspection
Start date: 2020-11-05, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005222876
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-02, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is the implementation of the inspection program 29151516220 upon notification of completion of construction, the objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Reconstruction of a section of the existing M36 aboveground heating main with the replacement of the laying method with an underground one from PK0 to PK1+0230 of the results of such work with the requirements of design documentation in accordance with including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662005222928
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-02, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 29151517920 upon notification of completion of construction. The objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network from the existing TK1 chamber to the outer wall of the projected three-section residential building 13A 13B 13B according to the ROM of the results of such work with the requirements of design documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662005151031
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-29, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 29150126219 The objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network from the inset to the wall of an apartment building with the installation of a new thermal chamber UT1 of the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662005151006
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-29, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is the implementation of the inspection program 29151523820 The objectives of this inspection are the implementation of regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of the capital construction facility Thermal network 2Du125 from the thermal chamber TK3117 to the outer wall of a residential building of the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662005202416
Unscheduled inspection
Start date: 2020-10-29, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005172132
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-11-03, duration: 19
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 29151527520 The objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network 2 Du200 from TK1 to TK2 on the border of the land plot with the construction of TK1 of the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662005172126
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005204467
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 662005206817
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 662004473283
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005185655
Unscheduled inspection
Start date: 2020-08-28, end date: 2020-09-24, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms This audit is conducted in order to protect the rights and interests of employees


# 662004501290
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program from the Task of implementing regional state construction supervision is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility Thermal network from the existing chamber TKU1815 to the outer wall of a residential building 1 located at Yekaterinburg the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code In the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004497957
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration:
Authority:
Purpose of inspection:


# 662004496997
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004496989
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 29151717820 dated 20200715 Tasks implementation of regional state construction supervision Subject to verification of compliance of work and applicable building materials during the construction of a capital construction facility Thermal network in the area from the projected thermal chamber TK3 to the outer wall of the underground parking located at Yekaterinburg within the boundaries of Shcherbakova Miasskaya Lane Shirokiy streets the results of such work with the requirements approved in in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code Of the Russian Federation


# 662004497975
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004483686
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-09-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29151520020 from the Task implementation of regional state construction supervision Subject verification of compliance of work and applicable building materials during the construction of a capital construction facility Thermal network from TK1 to TK2 with a TK2 camera 1st stage of construction thermal network from TK2 to the outer wall of a residential building 1st stage of construction 2nd stage of construction thermal network from TK2 to TK3 and from TK3 to the outer wall of a residential building of the 2nd stage of construction, stage 3 of construction located at Yekaterinburg, the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements the equipment of the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004466470
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004475481
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29151518520 from 21072020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction site Heating network 2Du80 from the thermal chamber UT1 to the outer wall of the projected residential building located at Sverdlovsk region Yekaterinburg the results of such work with building codes and rules safety rules and state standards as well as the requirements of others regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662004475564
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29151518620 from 21072020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network from the existing chamber TKU1815 to the outer wall of the residential building 1 located at Sverdlovsk region Yekaterinburg the results of such work to building codes and rules safety rules and state standards as well as requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662004466200
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29150113820 from 15062020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network from chamber UT2 to chamber UT4 inclusive 1st stage of construction thermal network from chamber UT4 to the outer wall of an apartment building 4 2nd stage of construction thermal network from chamber UT4 to the outer wall of an apartment building 5 the 3rd stage of construction located at the address Sverdlovsk region Yekaterinburg of the results of such work to building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 662004464731
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29151518220 from 15072020 Task implementation of state construction supervision of the project verification of compliance with the performance of works and applicable building materials at the capital construction facility Reconstruction of sections of the existing heating main M2 transfer of heat pipelines from 2DU800 to 2DU1000 from PK0+790 to PK3+79 TK 0203 transfer of heat pipelines 2Du500 surface to underground from TK 0201 to the existing underground heating main located at the address Sverdlovsk region, Yekaterinburg, the results of such work to construction norms and rules, safety rules and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 662004424538
Unscheduled inspection
Start date: 2020-06-04, end date: 2020-07-02, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 2915157220 from 20200401 Tasks implementation of regional state construction supervision Subject verification of compliance with the performance of works and applicable building materials during the construction of a capital construction facility Reconstruction of the M18 heating main in the section from PK0 wall of the existing TK1725 chamber to PK0+824 with the device of the camera UT1 PK0+280 and UT2 PK0+703 located at Yekaterinburg the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 articles 52 of the Urban Planning Code of the Russian Federation


# 662004427935
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-07-09, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 29150120219 of 20190703 Tasks implementation of regional state construction supervision Subject verification of compliance of work and applicable building materials during the construction of a capital construction facility Building of a network pumping station 1 according to ROM storage tanks 5 according to ROM located at Sverdlovsk region Yekaterinburg Warehouse lane d 4 the results of such work to the requirements approved in accordance with parts 15 152 and 153 Articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004415681
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 29151510220 from 05052020 Task implementation of state construction supervision is to verify the compliance of the work and applicable building materials at the capital construction facility Thermal network from the connection point in the thermal chamber TK22133 to the wall of a residential building located on a land plot with cadastral number 66410000000104093 located at Sverdlovsk region Yekaterinburg the results of such work with building codes and rules safety and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662004413513
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed construction of the capital construction facility Pump house 1 on ROM located at the address Sverdlovsk region, Yekaterinburg, 48 Okrainnaya Street on the basis of the notice of completion of the capital construction facility vh 29018217713K from 15052020


# 662004405904
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-19, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 29150138719 upon notification of completion of construction. The objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network on the site from the projected chamber TK1 to the outer wall of the house under construction of the results of such work with the requirements of design documentation, including energy efficiency requirements and the requirements of equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation verification of previously issued regulations


# 662004413814
Unscheduled inspection
Start date: 2020-05-22, end date: 2020-06-11, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 2915159820 from 29042020 Tasks implementation of regional state construction supervision Subject to verification of compliance of work and applicable building materials during the construction of a capital construction facility Thermal network 2Du250 from the existing chamber TK 64 to the TSC at Dorozhnaya Street 21 B located at Yekaterinburg the results of such work to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004402346
Unscheduled inspection
Start date: 2020-04-28, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662004402341
Unscheduled inspection
Start date: 2020-04-28, end date: 2020-05-29, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 2915175020 from 20200311 Tasks implementation of regional state construction supervision Subject verification of compliance of work and applicable building materials during the construction of a capital construction facility Thermal network from the thermal chamber UT11 to the projected thermal chamber UT12 to the design boundary located at Yekaterinburg the results of such work requirements approved in accordance with parts 15 152 and 153 articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004334179
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this check is carried out in order to consider the appeal of the CX from 05022020 29010127261the tasks of this check are the implementation of regional state housing supervision.7 The subject of this check is compliance with mandatory requirements for determining the amount of payment and payment for the utility service "heating" to the owners of the premises of an apartment building 8 on Okruzhnaya Street in Yekaterinburg


# 662004353497
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-03-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the execution of the previously issued regulation 29152238 of 21022020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network from the thermal chamber UT1 TC 2182 to the boundary of the land plot of the projected multi-level parking lot t NO1 located at Sverdlovsk region, Yekaterinburg, Novgorodtseva St. the results of such work with building codes and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662004363274
Unscheduled inspection
Start date: 2020-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 662004264839
Unscheduled inspection
Start date: 2020-02-06, end date: 2020-03-05, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 29150120219 of 20190703 Tasks implementation of regional state construction supervision Subject verification of compliance of work and applicable building materials during the construction of a capital construction facility Building of a network pumping station 1 according to ROM storage tanks 5 according to ROM located at Sverdlovsk region Yekaterinburg Warehouse lane d 4 the results of such work to the requirements approved in accordance with parts 15 152 and 153 Articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004259262
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-03-10, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed capital construction facility on the basis of the notice of completion of construction vh 4160 dated 29.012020 Tasks implementation of regional state construction supervision of the project verification of compliance of the work and applicable building materials during the construction of the capital construction facility Thermal network from UT2 to the wall of an apartment building located at Sverdlovsk region Yekaterinburg the results of such work with the requirements approved in accordance with the parts 15 152 and 153 Articles 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004267668
Unscheduled inspection
Start date: 2020-02-11, end date: 2020-03-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 29150138719 of 20191108 Tasks implementation of regional state construction supervision Subject to verification of compliance of work and applicable building materials during the construction of a capital construction facility Thermal network on the site from the projected chamber TK1 to the outer wall of a house under construction located at Yekaterinburg the results of such work to the requirements approved in accordance with parts 15 152 and 153 of the article 48 of the Urban Planning Code of the Russian Federation of project documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004282695
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the implementation of the inspection program 29150138619 adjustment from 06022020 Task implementation of state construction supervision is to check the compliance of work and applicable building materials at the capital construction facility Thermal network from the thermal chamber UT1 TC 2182 to the boundary of the land plot of the projected multi-level parking lot t NO1 located at Sverdlovsk region, Yekaterinburg, Novgorodtseva Street, the results of such work with building codes and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662004173733
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration:
Authority: Upravlenie gosudarstvennoi ohrany obektov kulturnogo naslediya Sverdlovskoi oblasti
Purpose of inspection:


# 662004227083
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed construction of the capital construction facility on the basis of the notice of completion of construction vh 2901822565 dated 17012020 Task implementation of state construction supervision Subject to verification of compliance of work and applicable building materials at the capital construction facility stage 1 of construction Reconstruction of the thermal network in sections from the reconstructed chamber UT2 to UT3 from the new chamber UT3 to DOE 3 located at the address Sverdlovsk region Compliance of the results of such work with building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 662004226965
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed construction of the capital construction facility on the basis of the notice of completion of construction vh 2901822562 dated 17012020 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility Thermal network from the previously designed thermal chamber to residential building 2 located at Sverdlovsk region Yekaterinburg the results of such work with building codes and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 662004228341
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is the implementation of the inspection program 291501338 19 upon notification of completion of construction. The objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network on the site from the point of insertion in TC UT1 to the boundary of the design of the results of such work with the requirements of design documentation, including the requirements of energy efficiency the efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004169757
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-01-28, duration: 1
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to review the application, the tasks of the audit are to carry out Housing supervision, the subject of the audit is to comply with mandatory requirements for the procedure for posting information in the state information system of housing and communal services


# 662004193223
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-02-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection is to implement the inspection program 291501337 19 upon notification of completion of construction. The objectives of this inspection are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network on the site from TC 3607a sushch to the wall of the Clever Park apartment building of the results of such work with the requirements of design documentation, including the requirements energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 662004207736
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 661904043062
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-23, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to implement a program for conducting inspections on notification of completion of construction 29150126919 The objectives of this audit are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Reconstruction of the existing thermal network from the existing chamber TK1004a13 to the existing chamber TK100423 of the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation verification of previously issued regulations


# 661904144535
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-27, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to review the application The tasks of the audit the implementation of Housing supervision The subject of the audit Compliance with mandatory requirements for determining the amount and payment of utility bills


# 661904118635
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed capital construction facility "Thermal network from TK3829 to UT1 thermal network from UT1 to the wall of an apartment building" located at the address Sverdlovsk region, Yekaterinburg on the basis of the notice of completion of the capital construction facility vh 29018256970 from 10122019


# 661904083365
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed capital construction facility "Thermal network from chamber UT1 to docking with on-site thermal networks on the border of the land plot with cadastral number 6641050400534" located at the address Sverdlovsk region, Yekaterinburg on the basis of the notice of completion of the capital construction facility vh 29018256010 dated 03122019


# 661904083270
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Inspection of the completed capital construction facility "Reconstruction of the M13 heating main on section 31 from the fixed support H4 PK2+8018 to the fixed support H7 PK4+5988 2nd stage of construction" located at the address Sverdlovsk region, Yekaterinburg on the basis of the notice of completion of the capital construction facility vh 29018256009 dated 03122019


# 661904048645
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program inspections by the notice of completion of stroitelstva of this review is the implementation of the regional state construction supervision verify compliance of work and construction materials used in the process of construction of the facility "Reconstruction of heating networks for the construction of the reconstruction of the bridge over the Iset river at St Chelyuskintsev reconstruction whichnational network modernization of M8 crossing the river Iset along ulitsa Chelyuskintsev in the area from ПК0 point 1 to point 2 SC6+974 reconstruction of heat networks in the area from TK 0825 to point 3 SC3+575 reconstruction of heat networks in the area from TK 0830 to point 2 And" located at Sverdlovsk oblast Ekaterinburg and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources the presence of a building permit requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 661904067618
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the execution of the previously issued regulation 2915072849P of 11112019 Task implementation of state construction supervision of the object verification of compliance of work and applicable building materials at the capital construction facility Thermal network from UT2 to the wall of a residential building located at Sverdlovsk region Yekaterinburg the results of such work to building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 661904066841
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the fulfillment of regulation 291507285P of 11112019 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction site Heating network from a previously designed heat chamber to a residential building 2 located at Sverdlovsk region Yekaterinburg the results of such work with building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts Of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 661904066622
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the execution of previously issued regulation 291507283P of 11112019 Task implementation of state construction supervision Purpose verification of compliance of work and applicable building materials at the capital construction facility stage 1 construction Reconstruction of the thermal network in sections from the reconstructed chamber UT2 to UT3 from the new chamber UT3 to DOE 3 located at Sverdlovsk region Yekaterinburg the results of such work to building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities


# 661904121795
Unscheduled inspection
Start date: 2019-12-18, end date: 2020-01-15, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to verify the previously issued regulation 291501338 19 The objectives of this audit are to carry out regional state construction supervision To verify the compliance of the work performed and applicable building materials during the construction of a capital construction facility Thermal network on the site from the point of insertion in TC UT1 nov to the design boundary PK4+782 of the results of such work with the requirements of design documentation, including energy efficiency requirements and the requirements of equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation verification of previously issued regulations


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.