# 001802460068
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-03-05, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 20 dekabrya 2017 g 324794 zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ispolneniyu predpisaniya prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic ne obespechivshih ispolnenie predpisaniya Predmetom nastoyaschei proverki yavlyayutsya vypolnenie predpisaniya organov gosudarstvennogo kontrolya nadzora
# 001700256981
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00160601761722
Unscheduled inspection
Start date: 2016-07-20, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyukontrolya vypolneniya predpisaniya ot 25032016 325273zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya ot 25032016 325273prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii federalnyh zakonov i inyh normativnyh pravovyh aktov
# 501902775311
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-07-10, duration: —
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: Compliance with the Labor Code of the Russian Federation
# 77180803158064
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001800239386
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu kontrolya nadzora ispolneniya OOO «Kuznica Klimata» ranee vydannogo predpisaniya ot 09022018 430274vnP00432018 dalee Predpisanie KNM 001800026003 srok dlya ispolneniya kotorogo istek Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov ispolneniya neispolneniya OOO «Kuznica Klimata» Predpisaniya Predmetom nastoyaschei proverki yavlyaetsya ispolnenie Predpisaniya yuridicheskim licom
# 77180803119127
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803118689
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803101756
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803100263
Unscheduled inspection
Start date: 2018-03-13, end date: 2018-03-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803094403
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803087504
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001802460068
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-03-05, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 20 dekabrya 2017 g 324794 zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ispolneniyu predpisaniya prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic ne obespechivshih ispolnenie predpisaniya Predmetom nastoyaschei proverki yavlyayutsya vypolnenie predpisaniya organov gosudarstvennogo kontrolya nadzora
# 77180803068756
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-03-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001800026003
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-09, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu ispolneniya prikaza Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru ot 15 marta 2017 g 85 «O proverkah organizacii ekspluatiruyuschih bashennye krany» na osnovanii porucheniya Zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii AG Hloponina ot 8 fevralya 2017 g AHP9682 ob organizacii i provedenii v 20172019 godah vneplanovyh proverok organizacii ekspluatiruyuschih bashennye krany Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii ustanovlennyh federalnymi zakonami i inymi normativnymi aktami Rossiiskoi Federacii v oblasti promyshlennoi bezopasnosti i tehnicheskogo regulirovaniya obyazatelnyh trebovanii prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii federalnyh zakonov i inyh normativny pravovyh aktov Predmetom nastoyaschei proverki yavlyayutsya soblyudenie yuridicheskim licom v processe osuschestvleniya deyatelnosti obyazatelnyh trebovanii promyshlennoi bezopasnosti pri proektirovanii stroitelstve ekspluatacii konservacii i likvidacii opasnyh proizvodstvennyh obektov izgotovlenii montazhe naladke obsluzhivanii i remonte tehnicheskih ustroistv gruzopodemnyh kranov primenyaemyh na opasnyh proizvodstvennyh obektah sootvetstvie ukazannym trebovaniyam ispolzuemyh zdanii pomeschenii sooruzhenii oborudovaniya i materialov a takzhe trebovanii v otnoshenii mashin i oborudovaniya i svyazannyh s trebovaniyami k etoi produkcii processov ekspluatacii i utilizacii
# 77180803068239
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-02-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001700256981
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-29, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ispolneniya prikaza Rostehnadzora ot 15 marta 2017 g 85 «O proverkah organizacii ekspluatiruyuschih bashennye krany» na osnovanii porucheniya Zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii AG Hloponina ot 8 fevralya 2017 g AHP9682 «Ob organizacii i provedenii v period s 2017 po 2019 god vneplanovyh proverok organizacii ekspluatiruyuschih bashennye krany» Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii ustanovlennyh federalnymi zakonami i inymi normativnymi aktami Rossiiskoi Federacii v oblasti promyshlennoi bezopasnosti i tehnicheskogo regulirovaniya obyazatelnyh trebovanii prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii federalnyh zakonov i inyh normativnyh pravovyh aktov Predmetom nastoyaschei proverki yavlyayutsya soblyudenie yuridicheskim licom v processe osuschestvleniya deyatelnosti obyazatelnyh trebovanii promyshlennoi bezopasnosti pri proektirovanii stroitelstve ekspluatacii konservacii i likvidacii opasnyh proizvodstvennyh obektov izgotovlenii montazhe naladke obsluzhivanii i remonte tehnicheskih ustroistv gruzopodemnyh kranov primenyaemyh na opasnyh proizvodstvennyh obektah sootvetstvie ukazannym trebovaniyam ispolzuemyh zdanii pomeschenii sooruzhenii oborudovaniya i materialov a takzhe trebovanii v otnoshenii mashin i oborudovaniya i svyazannyh s trebovaniyami k etoi produkcii processov ekspluatacii i utilizacii
# 00170803035798
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-29, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyuispolneniya prikaza Rostehnadzora ot 15 marta 2017 g 85 «O proverkah organizacii ekspluatiruyuschih bashennye krany» na osnovanii porucheniya Zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii AG Hloponina ot 8 fevralya 2017 g AHP9682 «Ob organizacii i provedenii v period s 2017 po 2019 god vneplanovyh proverok organizacii ekspluatiruyuschih bashennye krany» Zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii ustanovlennyh federalnymi zakonami i inymi normativnymi aktami Rossiiskoi Federacii v oblasti promyshlennoi bezopasnosti i tehnicheskogo regulirovaniya obyazatelnyh trebovaniiprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii federalnyh zakonov i inyh normativnyh pravovyh aktov Predmetom nastoyaschei proverki yavlyayutsya soblyudenie yuridicheskim licom v processe osuschestvleniya deyatelnosti obyazatelnyh trebovanii promyshlennoi bezopasnosti pri proektirovanii stroitelstve ekspluatacii konservacii i likvidacii opasnyh proizvodstvennyh obektov izgotovlenii montazhe naladke obsluzhivanii i remonte tehnicheskih ustroistv gruzopodemnyh kranov primenyaemyh na opasnyh proizvodstvennyh obektah sootvetstvie ukazannym trebovaniyam ispolzuemyh zdanii pomeschenii sooruzhenii oborudovaniya i materialov a takzhe trebovanii v otnoshenii mashin i oborudovaniya i svyazannyh s trebovaniyami k etoi produkcii processov ekspluatacii i utilizacii
# 77170803018259
Unscheduled inspection
Start date: 2017-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802884767
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802838605
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802877076
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802699536
Unscheduled inspection
Start date: 2017-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802646503
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802519003
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802615965
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-09-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701881397
Unscheduled inspection
Start date: 2017-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701886836
Unscheduled inspection
Start date: 2017-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701843906
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701828615
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701840161
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701674661
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701609819
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701736004
Unscheduled inspection
Start date: 2017-06-21, end date: 2017-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701580775
Unscheduled inspection
Start date: 2017-05-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701598385
Unscheduled inspection
Start date: 2017-05-05, end date: 2017-05-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701586647
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701584348
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701547082
Unscheduled inspection
Start date: 2017-04-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701485969
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701551188
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-04-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701477089
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701463016
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-04-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701363767
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701413411
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701331661
Unscheduled inspection
Start date: 2017-02-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701302626
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701342496
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701326475
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701259842
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701258529
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701102826
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 1035116 ot 03102016 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 77160701101881
Unscheduled inspection
Start date: 2016-11-10, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160701089602
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701082331
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701160798
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701135649
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701019066
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-11-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160701016798
Unscheduled inspection
Start date: 2016-10-18, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160701060352
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 1034416 ot 28092016 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 77160700865364
Unscheduled inspection
Start date: 2016-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701029233
Unscheduled inspection
Start date: 2016-10-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700852927
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 899516 ot 25082016 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 77160700852841
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160700046318
Unscheduled inspection
Start date: 2016-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700052912
Unscheduled inspection
Start date: 2016-08-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160601784491
Unscheduled inspection
Start date: 2016-08-10, end date: 2016-08-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160601738086
Unscheduled inspection
Start date: 2016-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601716717
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-07-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 00160601761722
Unscheduled inspection
Start date: 2016-07-20, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyukontrolya vypolneniya predpisaniya ot 25032016 325273zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya ot 25032016 325273prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii federalnyh zakonov i inyh normativnyh pravovyh aktov
# 77160601735724
Unscheduled inspection
Start date: 2016-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601697409
Unscheduled inspection
Start date: 2016-07-07, end date: 2016-07-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 00160601560085
Unscheduled inspection
Start date: 2016-03-16, end date: 2016-03-21, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka faktov izlozhennyh v obraschenii ot 26012016 O1800A1