# 002005282925
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 002005282915
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 001903039604
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701563793
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701533363
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-29, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of completed works on notification of completion dates
# 772101438544
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 712100161672
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: —
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out for the purpose of: monitoring the implementation of paragraphs 1-4, 6, 22 of Regulation No. 59-10/13-C-2020 dated 09/21/2020.
The objectives of this audit are: to verify that the legal entity has eliminated the violations identified in paragraphs
1-4, 6, 22 of Regulation No. 59-10/13-C-2020 dated 09/21/2020.
The subject of this audit is the fulfillment by a legal entity of paragraphs 1-4, 6, 22 of Regulation No. 59-10/13-C-2020 of the Prioksky Administration of Rostechnadzor dated 09/21/2020.
# 772100161984
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution of a previously issued prescription by a legal entity. The purpose of this check is to eliminate the facts of fulfillment /non-fulfillment of a previously issued prescription. The subject of this audit is the execution of the order to eliminate the identified violations.
# 772100161941
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution of a previously issued prescription by a legal entity. The purpose of this check is to eliminate the facts of fulfillment /non-fulfillment of a previously issued prescription. The subject of this audit is the execution of the order to eliminate the identified violations.
# 002005282940
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 002005282925
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 002005282915
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 772005218783
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502004493384
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: —
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: check
# 772004452453
Unscheduled inspection
Start date: 2020-07-10, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004425186
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004346284
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004280744
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-02-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004296601
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-02-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004218677
Unscheduled inspection
Start date: 2020-01-21, end date: 2020-02-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the subject of verification is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 771904154615
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation
# 771903982443
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is to ensure that the person carrying out the construction meets the requirements of part 3 of Article 52 of the Urban Planning Code. The parameters of the capital construction facility comply with the maximum parameters of permitted construction of reconstruction of capital construction facilities established by the rules of land use and development, documentation on the layout of the territory and mandatory requirements to the parameters of capital construction facilities established by the Urban Planning Code and other federal laws
# 771904105411
Unscheduled inspection
Start date: 2019-12-13, end date: 2020-01-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements for the availability of a construction permit and the requirements specified in the construction permit, to verify compliance with the instructions of the Moscow State Construction Supervision
# 771904108903
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771903926627
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903895617
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903882471
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-21, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 771903778520
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903847547
Unscheduled inspection
Start date: 2019-10-11, end date: 2019-10-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903512439
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited. The purpose of the audit is to fulfill the requirements of Part 3 of Article 52 of the Urban Planning Code by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 771903857975
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the establishment of violations of the requirements for the availability of a construction permit and the requirements specified in the construction permit. Tasks of the audit are to prevent the identification and suppression of violations of the requirements for the availability of a construction permit and the requirements specified in the construction permit. The verification of compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction reconstruction of capital construction facilities established by the rules land use and development documentation on the layout of the territory and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws
# 771903577631
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited. The purpose of the audit is to fulfill the requirements of Part 3 of Article 52 of the Urban Planning Code by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 001903039604
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-03, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 771902910288
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: compliance with the land legislation of Energy Construction LLC on a land plot located at Moscow, Voskresenskoe village, Gorodishche uch 9 cadastral 50210130104245
# 77190803482878
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803471757
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code
# 77190803439050
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803439595
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code
# 77190803441910
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803430354
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803412732
Unscheduled inspection
Start date: 2019-05-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902673853
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-12, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the fulfillment by LLC Energeticheskoe Stroie of a previously issued instruction. The purpose of this inspection is to establish the facts of the fulfillment by LLC Energeticheskoe Stroie of the above-mentioned instruction. The subject of this inspection is the fulfillment by LLC Energeticheskoe Stroie of a prescription for the elimination of identified violations.
# 77190803390609
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code
# 77190803380683
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803405683
Unscheduled inspection
Start date: 2019-04-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803376102
Unscheduled inspection
Start date: 2019-03-21, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803378490
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803325272
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803320212
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803307295
Unscheduled inspection
Start date: 2018-12-26, end date: 2018-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803296863
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803268436
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-11-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803262280
Unscheduled inspection
Start date: 2018-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803232320
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803207349
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-09-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803185692
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803146262
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-06-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803145859
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-06-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803123378
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-04-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803084891
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-02-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803066934
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803022658
Unscheduled inspection
Start date: 2017-12-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802823574
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802571940
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701854947
Unscheduled inspection
Start date: 2017-08-03, end date: 2017-08-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701769035
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701703307
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-07-07, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's appeal dated 04052017 71890817OB on issues of remuneration, registration and termination of an employment contract
# 77170701612760
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701592014
Unscheduled inspection
Start date: 2017-05-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701470292
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701477300
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-04-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 00170701563793
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-29, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of completed works according to the notice dated 22122016 0217 on the completion dates of works subject to verification during the construction of the capital construction facility "Construction of the Permskaya GRES power unit 800 MW"Tasks prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation committed by the person carrying out the construction on the basis of a contract with the developer or technical requester, subject to verification of compliance with mandatory requirements
# 00170701533363
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-29, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of completed works on notification of completion dates
# 77170701477294
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701372227
Unscheduled inspection
Start date: 2017-02-09, end date: 2017-02-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701155760
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-12-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701076107
Unscheduled inspection
Start date: 2016-11-02, end date: 2016-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160700840915
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of a notification received from the developer customer or the person carrying out construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 915416 dated 02092016
# 77160700051057
Unscheduled inspection
Start date: 2016-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601798386
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-08-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Elimination of violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration date for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirementsrevention detection and suppression of violations of technical regulations and project documentation committed by the person being audited
# 77160700066532
Unscheduled inspection
Start date: 2016-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601742969
Unscheduled inspection
Start date: 2016-07-21, end date: 2016-08-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentation on the basis of the approved verification program, the objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the audited person, compliance of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 77160601708745
Unscheduled inspection
Start date: 2016-07-08, end date: 2016-07-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of a notification received from the developer the customer or the person carrying out the construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 613216 dated 10062016
# 77160601728029
Unscheduled inspection
Start date: 2016-07-19, end date: —, duration: —
Authority: —
Purpose of inspection: