# 342101294592
Unscheduled inspection
Start date: 2021-11-10, end date: 2021-11-17, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation, the objective of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation, the subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) requirements for a construction permit; 3) requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; 4) requirements established by part 4 of Article 52 of the GsK of the Russian Federation to ensure the conservation of a capital construction facility; 5) requirements for the procedure for carrying out construction control established by the GsK of the Russian Federation and other regulatory legal acts
# 342101292578
Unscheduled inspection
Start date: 2021-11-10, end date: 2021-11-17, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation, the objective of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation, the subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) requirements for a construction permit; 3) requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; 4) requirements established by part 4 of Article 52 of the GsK of the Russian Federation to ensure the conservation of a capital construction facility; 5) requirements for the procedure for carrying out construction control established by the GsK of the Russian Federation and other regulatory legal acts
# 342101293121
Unscheduled inspection
Start date: 2021-11-10, end date: 2021-11-17, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation, the objective of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation., The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which are part of such project documentation in accordance with Part 1.3 of Article 52 of the GsK RF) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) requirements for a construction permit; 3) requirements established by Parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; 4) requirements established by part 4 of Article 52 of the GsK of the Russian Federation to ensure the conservation of a capital construction facility; 5) requirements for the procedure for carrying out construction control established by the GsK of the Russian Federation and other regulatory legal acts
# 342101177723
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose: This inspection is carried out in accordance with the inspection program received by a representative of the developer MCU Service of a single customer-developer administration of Volgograd in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, including technical regulations and project documentation;
The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. The subject of this audit is compliance with mandatory requirements regarding: a) the conformity of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (including changes made to the working documentation and which are part of such project documentation in accordance with Part 1.3 of Article 52 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code);
b) building permit requirements;
c) the requirements established by parts 2 and 3.1 of Article 52 of the Code;
d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility;
e) requirements for the procedure for carrying out construction control established by the Code and other regulatory legal acts.
# 342101177238
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose: This inspection is carried out in accordance with the inspection program received by a representative of the developer MCU Service of a single customer-developer administration of Volgograd in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, including technical regulations and project documentation;
The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. The subject of this audit is compliance with mandatory requirements regarding: a) the conformity of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (including changes made to the working documentation and which are part of such project documentation in accordance with Part 1.3 of Article 52 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code);
b) building permit requirements;
c) the requirements established by parts 2 and 3.1 of Article 52 of the Code;
d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility;
e) requirements for the procedure for carrying out construction control established by the Code and other regulatory legal acts.
# 342100416826
Unscheduled inspection
Start date: 2021-08-04, end date: —, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this review is compliance with:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) building permit requirements;
3) the requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation;
4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility;
5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
# 342100393007
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by a representative of Volgograd-Property LLC in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation;
b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.
7. The subject of this audit is compliance with mandatory requirements regarding:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) building permit requirements;
3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation;
4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility;
5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
# 342100392829
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 342100392542
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by a representative of Volgograd-Property LLC in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation;
b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.
7. The subject of this audit is compliance with mandatory requirements regarding:
1) the conformity of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) building permit requirements;
3) requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation;
4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility;
5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
# 342100077747
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-03-24, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources and design documentation.;
b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.
7. The subject of this audit is compliance with the mandatory requirements regarding:
a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 342100078774
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-03-25, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources and design documentation.;
b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.
7. The subject of this audit is compliance with the mandatory requirements regarding:
a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 342100078811
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-03-25, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources and design documentation.;
b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.
7. The subject of this audit is compliance with the mandatory requirements regarding:
a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 342100099135
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-09, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with the mandatory requirements regarding:
a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
b) availability of a building permit;
c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 342005221018
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-24, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population of the project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation of the project documentation, The subject of this audit is compliance with mandatory requirements regarding a compliance with the performance of works and applied construction materials in the process of construction reconstruction of a capital construction facility as well as the results of such work to the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter the Code of Design Documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342005191692
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In accordance with the inspection program in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation. The purpose of this audit is to comply with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, in order to meet the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342005191675
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In accordance with the inspection program in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and project documentation, the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation. the relationship and compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342004471089
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004471086
Unscheduled inspection
Start date: 2020-07-24, end date: 2020-07-31, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the inspection program in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and project documentationi the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation The subject of this inspection is compliance with mandatory requirements in relation to the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or information models in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used to meet the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342004471085
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004469819
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 342004460433
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-07-29, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance with the performance of work and the construction materials used during the construction of a capital construction facility, as well as the results of such the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342004367157
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In accordance with the inspection program received by a representative of Volgogradimuschestvo LLC in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and project documentationthe objective of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentationsubject of this The purpose of the audit is to ensure compliance with mandatory requirements regarding the compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code. The Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used to meet the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation
# 342004363586
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-03-27, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation
# 342004203229
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 342004202907
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341904069643
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902928302
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of assessing the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and project documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation
# 341902967342
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902614129
Unscheduled inspection
Start date: 2019-04-04, end date: 2019-04-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection and sanitary and epidemiological welfare of the population and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and the construction materials used meet the requirements of the design documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902579288
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of assessing the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and project documentation the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation
# 341802292730
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection and sanitary and epidemiological welfare of the population and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and the construction materials used meet the requirements of the design documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341802129635
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of assessing the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and project documentation the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation
# 341801711831
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the Facility with the requirements of regulatory legal acts and project documentation, the objective of this audit is to ensure that the Facility meets the requirements of regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of regulatory legal acts and project documentation
# 341800683881
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and design documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and the applied building materials with the requirements of project documentation b availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800683846
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and design documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and the applied building materials with the requirements of project documentation b availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800010967
Unscheduled inspection
Start date: 2018-01-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800010946
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of technical regulations of project documentation b availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802609357
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements in relation to compliance of construction works, their results and applied building materials with the requirements of technical regulations of project documentation, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802608214
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation7 The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of technical regulations of the project documentation and the availability of a construction permit and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170701773425
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of an Object with the requirements of technical regulations of other regulatory legal acts and project documentation, the task of this audit is to ensure that the Object meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation
# 34160701128964
Unscheduled inspection
Start date: 2016-11-22, end date: 2016-11-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used with the requirements of urban planning legislation including technical regulations and design documentationthe purpose of this audit is to prevent identify and the suppression of violations of legislation on urban planning activities, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of design documentation and the availability of a construction permit and compliance with established requirements for admission to construction work
# 34160700218386
Unscheduled inspection
Start date: 2016-09-09, end date: 2016-09-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources with the requirements of urban planning legislation, including technical regulations and project documentation, the purpose of this audit is to prevent identify and suppress violations according to the legislation of the Russian Federation, including technical regulations and project documentation, the purpose of this audit is to comply with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of technical regulations, project documentation, and the availability of a construction permit and compliance with established requirements for admission to construction work