Found 66 inspections:

# 372101436951
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority:
Purpose of inspection:


# 612101512201
Unscheduled inspection
Start date: 2021-12-24, end date: —, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:


# 612101454310
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration: 7
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: To review documents submitted by the developer, the technical customer, the person carrying out construction on the basis of a contract with the developer or the technical customer for verification related to the performance of work (including individual works, building structures, sections of engineering support networks, engineering systems and equipment), the use of building materials (products), as well as with implementation of construction control - the time period during the inspection. To issue the results of the inspection - the time period during the inspection. To carry out a visual inspection of the completed works (including individual completed works, building structures, sections of engineering and technical support networks) and the applied building materials (products) - the time period during the inspection. To carry out actions aimed at bringing to administrative responsibility persons who have committed administrative offenses in accordance with the procedure and cases provided for by the legislation of the Russian Federation on administrative offenses. The verification program.


# 142101555838
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 142101364252
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-03, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), compliance with mandatory requirements in the field of construction and applied building materials (products) during the construction of a capital construction facility by the developer, the technical customer, the person carrying out the construction, the established order of construction, reconstruction of the capital construction facility, warning, identification and suppression of violations of the legislation on urban planning activities, including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor); compliance with the information contained in the notification on the commencement of certain types of entrepreneurial activity, mandatory requirements; compliance with the information contained in the application and documents of a legal entity or individual entrepreneur for granting legal status, a special permit (license) for the right to carry out certain types of activities or permission (approval) for other legally significant actions, if an appropriate unscheduled audit of the legal entity, an individual entrepreneur is provided for by the rules for granting legal status, special permits (licenses), and permits (approvals) to mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified State Register of Legal Entities, the unified State Register of Individual Entrepreneurs, and other federal information resources; compliance with the instructions of state control (supervision) bodies, municipal control bodies; holding events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, and cultural significance, which are part of the national library fund; to prevent the occurrence of natural and man-made emergencies; to ensure the security of the state; to eliminate the consequences of causing such harm


# 782101494321
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: inspection of the completed construction of the facility, including fire prevention measures, measures to ensure the sanitary and epidemiological welfare of the population, environmental protection, landscaping, facades


# 782101467655
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 7
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: work on the installation of structures of the aboveground part of the building. Determination of the conformity of the work performed, construction materials used during the construction of a capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code), the availability of a building permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 532101230408
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novgorodskoi oblasti
Purpose of inspection:


# 782100941144
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: To establish that this check is being conducted in order to: Scheduled inspection (according to the inspection program) - organization of construction production (strogenplan, PIC). The objectives of this audit are: prevention, detection and suppression of violations of urban planning legislation and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor). The subject of this review is: 1) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this The Code; 2) availability of a building permit; 3) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of this Code.


# 142100771227
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-10-05, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: check in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha (Yakutia), compliance in the construction of the object of capital construction, developer, technical, customer, person engaged in the construction, mandatory requirements in the field of construction and construction materials used (products), the established order of construction, reconstruction of capital construction object, prevention, detection and suppression approved developer, technical coordinator and the person performing the construction on the basis of an agreement with the developer or the customer (hereinafter the contractor), violations of the legislation on town-planning activities, including project documentation, compliance with mandatory requirements and (or) the requirements established by municipal legal acts; the conformity of the information contained in the notice of initiation of certain types of entrepreneurial activities, the mandatory requirements; compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status, special permission (license) to carry out certain types of activities or authorization (approval) to exercise other legal actions, if the conducting unscheduled inspections of the legal entity, individual entrepreneur provided the rules for the provision of legal status, a special permit (license), authorization (approval) the mandatory requirements, as well as data about the specified legal entities and individual entrepreneurs, contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other Federal information resources; implementation of the requirements of the state control (supervision) bodies and municipal control; events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm.


# 142100771198
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 792100446010
Unscheduled inspection
Start date: 2021-08-17, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Evreiskoi avtonomnoi oblasti
Purpose of inspection: the inspection is carried out on the basis of notification No. 1 received from the technical customer dated 08/05/2021 (reg. No. 04-08-08-2021 dated 08/06/2021) on the completion of the construction of the capital construction facility in order to: - verification of the compliance of the constructed facility with the requirements of the design documentation and the fulfillment of mandatory requirements during construction. The objectives of this review are: - confirmation of compliance of the constructed facility with the requirements of the design documentation. The subject of this review is: - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of regulations and design documentation, sanitary and epidemiological and fire safety requirements.


# 372100536969
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: 2
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban planning activities and project documentation committed by the developer or the person carrying out the construction. assessment of compliance of the performed software works (installation of a steel frame, organization of a construction site, installation of external engineering networks) and the construction materials used, as well as the results of such work with the requirements of the design documentation in accordance with the inspection program


# 792100365459
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Evreiskoi avtonomnoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the developed inspection program for the 3rd quarter of 2021 , according to: - verification of the compliance of the completed works and the work performed with the requirements of the project documentation, the project of work, regulatory documents; - verification of the maintenance of executive documentation, verification of compliance and completeness of ongoing construction control by the developer and, in the case of construction on the basis of a contract with the developer, the person carrying out the construction (hereinafter referred to as the contractor), verification of compliance with safety and fire safety requirements at the facility, compliance with sanitary and epidemiological rules and regulations; - verification of compliance with the requirements established by Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of this audit is to: - identify violations of mandatory requirements; The subject of this review is: - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of regulations and project documentation; - fixing the scope of work in the maintenance of executive documentation; - conducting construction control and recording its results;


# 142100311885
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-12, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: check in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha (Yakutia), compliance in the construction of the object of capital construction, developer, technical, customer, person engaged in the construction, mandatory requirements in the field of construction and construction materials used (products), the established order of construction, reconstruction of capital construction object, prevention, detection and suppression approved developer, technical coordinator and the person performing the construction on the basis of an agreement with the developer or the customer (hereinafter the contractor), violations of the legislation on town-planning activities, including project documentation, compliance with mandatory requirements and (or) the requirements established by municipal legal acts; the conformity of the information contained in the notice of initiation of certain types of entrepreneurial activities, the mandatory requirements; compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status, special permission (license) to carry out certain types of activities or authorization (approval) to exercise other legal actions, if the conducting unscheduled inspections of the legal entity, individual entrepreneur provided the rules for the provision of legal status, a special permit (license), authorization (approval) the mandatory requirements, as well as data about the specified legal entities and individual entrepreneurs, contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other Federal information resources; implementation of the requirements of the state control (supervision) bodies and municipal control; events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm.


# 142100311807
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-08, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: check in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha (Yakutia), compliance in the construction of the object of capital construction, developer, technical, customer, person engaged in the construction, mandatory requirements in the field of construction and construction materials used (products), the established order of construction, reconstruction of capital construction object, prevention, detection and suppression approved developer, technical coordinator and the person performing the construction on the basis of an agreement with the developer or the customer (hereinafter the contractor), violations of the legislation on town-planning activities, including project documentation, compliance with mandatory requirements and (or) the requirements established by municipal legal acts; the conformity of the information contained in the notice of initiation of certain types of entrepreneurial activities, the mandatory requirements; compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status, special permission (license) to carry out certain types of activities or authorization (approval) to exercise other legal actions, if the conducting unscheduled inspections of the legal entity, individual entrepreneur provided the rules for the provision of legal status, a special permit (license), authorization (approval) the mandatory requirements, as well as data about the specified legal entities and individual entrepreneurs, contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other Federal information resources; implementation of the requirements of the state control (supervision) bodies and municipal control; events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm.


# 782100373216
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v gorode Sankt-Peterburge
Purpose of inspection: control over the execution by a legal entity or individual entrepreneur of previously issued regulations on the elimination of identified violations of mandatory labor requirements, the deadline for which has expired: Regulations No. 78/7- 7806108193-21-PP-D/815/5 dated 05/14/2021


# 782100373194
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v gorode Sankt-Peterburge
Purpose of inspection: control over the execution by a legal entity or individual entrepreneur of previously issued regulations on the elimination of identified violations of mandatory labor requirements, the deadline for which has expired: Regulations No. 78/7- 7806108193-21-PP-D/815/3 dated 05/14/2021


# 782100373208
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v gorode Sankt-Peterburge
Purpose of inspection: control over the execution by a legal entity or individual entrepreneur of previously issued regulations on the elimination of identified violations of mandatory labor requirements, the deadline for which has expired: Regulations No. 78/7- 7806108193-21-PP-D/815/4 dated 05/14/2021


# 142100311590
Unscheduled inspection
Start date: 2021-06-28, end date: 2021-07-09, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: check in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha (Yakutia), compliance in the construction of the object of capital construction, developer, technical, customer, person engaged in the construction, mandatory requirements in the field of construction and construction materials used (products), the established order of construction, reconstruction of capital construction object, prevention, detection and suppression approved developer, technical coordinator and the person performing the construction on the basis of an agreement with the developer or the customer (hereinafter the contractor), violations of the legislation on town-planning activities, including project documentation, compliance with mandatory requirements and (or) the requirements established by municipal legal acts; the conformity of the information contained in the notice of initiation of certain types of entrepreneurial activities, the mandatory requirements; compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status, special permission (license) to carry out certain types of activities or authorization (approval) to exercise other legal actions, if the conducting unscheduled inspections of the legal entity, individual entrepreneur provided the rules for the provision of legal status, a special permit (license), authorization (approval) the mandatory requirements, as well as data about the specified legal entities and individual entrepreneurs, contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other Federal information resources; implementation of the requirements of the state control (supervision) bodies and municipal control; events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm.


# 142100311569
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 792100225208
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Evreiskoi avtonomnoi oblasti
Purpose of inspection:


# 372100110663
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-02, duration: 2
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: prevention, detection and suppression of violations of the legislation on urban planning activities and project documentation committed by the developer or the person carrying out the construction. assessment of the compliance of the completed works (organization of the construction site, installation of foundations) and the construction materials used, as well as the results of such work with the requirements of the project documentation in accordance with the inspection program


# 792100091164
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-03-31, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Evreiskoi avtonomnoi oblasti
Purpose of inspection: The audit is conducted on the basis of a developed audit program for the 1st quarter of 2021 in order to: - verification of compliance of the performed works and the performed works with the requirements of the project documentation, the project of work, regulatory documents; - verification of the maintenance of executive documentation, verification of compliance and completeness of ongoing construction control by the developer and, in the case of construction on the basis of a contract with the developer, the person carrying out the construction (hereinafter referred to as the contractor), verification of compliance with safety and fire safety requirements at the facility, compliance with sanitary and epidemiological rules and regulations; - verification of compliance with the requirements established by Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of this audit is to: - identify violations of mandatory requirements; The subject of this review is: - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of regulations and project documentation; - fixing the scope of work in the maintenance of executive documentation; - conducting construction control and recording its results; - compliance with the requirements of Parts 2 and 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 142100034215
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-16, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: check in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha (Yakutia), January 19, 2021, compliance during the construction of the object of capital construction, developer, technical, customer, person engaged in the construction, mandatory requirements in the field of construction and construction materials used (products), the established order of construction, reconstruction of capital construction object, prevention, detection and suppression approved developer, technical coordinator and the person performing the construction on the basis of an agreement with the developer or the customer (hereinafter the contractor), violations of the legislation on town-planning activities, including project documentation, compliance with mandatory requirements and (or) the requirements established by municipal legal acts; the conformity of the information contained in the notice of initiation of certain types of entrepreneurial activities, the mandatory requirements; compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status, special permission (license) to carry out certain types of activities or authorization (approval) to exercise other legal actions, if the conducting unscheduled inspections of the legal entity, individual entrepreneur provided the rules for the provision of legal status, a special permit (license) authorization (approval) of the mandatory requirements, as well as data about the specified legal entities and individual entrepreneurs, contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other Federal information resources; implementation of the requirements of the state control (supervision) bodies and municipal control; events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, and cultural significance, which are part of the national library fund; to prevent the occurrence of natural and man-made emergencies; to ensure the security of the state; to eliminate the consequences of causing such harm


# 792100021136
Unscheduled inspection
Start date: 2021-02-20, end date: 2021-02-24, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Evreiskoi avtonomnoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the notification received on the completion dates of the work to be inspected during the construction of capital construction facility No. 1 dated 02/15/2021 and the previously developed inspection program for the 1st quarter of 2021. The subject of this review is: - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of regulations and design documentation, including sanitary, epidemiological and fire safety requirements when performing work on the installation of outdoor heat supply networks; - fixing the scope of work in the maintenance of executive documentation; - conducting construction control and recording its results; - compliance with the requirements of Parts 2 and 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation. - identification of violations of mandatory requirements


# 142100026895
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 792005281861
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-29, duration: 4
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy Evreiskoi avtonomnoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the previously developed inspection program for the 4th quarter of 2020 in order to verify the compliance of completed works and work performed with the requirements of the project documentation for the project of work with regulatory documents, to verify the maintenance of executive documentation, to verify the compliance and completeness of ongoing construction control by the technical customer and contractor, to verify compliance with safety and fire safety requirements at the facility, compliance with sanitary and epidemiological rules, and The purpose of this audit is to identify violations of mandatory requirements. The purpose of this audit is to ensure that the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, comply with the requirements of regulations and design documentation, including sanitary and epidemiological and fire safety requirements, and to fix the scope of work when maintaining executive documentation conducting construction control and recording its results meeting the requirements of Parts 2 and 3 31 of Article 52 of the Urban Planning Code of the Russian Federation detecting violations of mandatory requirements


# 782005256068
Unscheduled inspection
Start date: 2020-12-04, end date: 2021-01-21, duration: 16
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: The purpose is to determine the actual compliance of the completed works with the requirements of the project documentationthe task is to prevent, as well as to identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of the compliance of the works performed during the construction of reconstruction of capital construction facilities with the requirements of the project documentationthe conformity of the completed works and the construction materials used during the construction of the capital construction facility with the requirements of the project documentation the organization of the construction site the installation of foundations and also the results of such works


# 532005237580
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novgorodskoi oblasti
Purpose of inspection: verification of the elimination of violations of the mandatory requirements specified in the notice of the person carrying out the construction on the elimination of identified violations


# 792005203638
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-05, duration: 3
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy Evreiskoi avtonomnoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the previously developed inspection program for the 4th quarter of 2020 in order to verify the compliance of completed works and work performed with the requirements of the project documentation for the project of work with regulatory documents, to verify the maintenance of executive documentation, to verify the compliance and completeness of ongoing construction control by the technical customer and contractor, to verify compliance with safety and fire safety requirements at the facility, compliance with sanitary and epidemiological rules, and The purpose of this audit is to identify violations of mandatory requirements. The purpose of this audit is to ensure that the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, comply with the requirements of regulations and design documentation, including sanitary and epidemiological and fire safety requirements, and to fix the scope of work when maintaining executive documentation conducting construction control and recording its results meeting the requirements of Parts 2 and 3 31 of Article 52 of the Urban Planning Code of the Russian Federation detecting violations of mandatory requirements


# 382004471637
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 792004458894
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-21, duration: 2
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy Evreiskoi avtonomnoi oblasti
Purpose of inspection: This audit is conducted on the basis of the received notification of the completion dates of the work to be verified during the construction of the capital construction facility 1 dated 13072020 and the previously developed inspection program for the 3rd quarter of 2020.The purpose of this audit is to ensure that the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of regulations and design documentation, including including sanitary and epidemiological and fire-fighting requirements when performing work on the reinforcement of zero-cycle structures, recording the scope of work during the maintenance of executive documentation, conducting construction control and recording its results, meeting the requirements of Parts 2 and 3 31 of Article 52 of the Urban Planning Code of the Russian Federation, detecting violations of mandatory requirements


# 472004411701
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-06-18, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: The purpose of checking the completion of the work provided for in the inspection program The subject of this check is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 772004412861
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the subject of verification is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such works with the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 772004349374
Unscheduled inspection
Start date: 2020-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 302004444987
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-25, duration:
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: compliance with the requirements of urban planning legislation during the construction of the MFC ice rink


# 772004206886
Unscheduled inspection
Start date: 2020-01-21, end date: 2020-01-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903870655
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the subject of verification is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 231903463597
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnodarskom krae
Purpose of inspection: Ensuring the observance and protection of citizens' labor rights and freedoms, including the right to safe working conditions, compliance with mandatory requirements and or requirements established by municipal legal acts


# 771903575635
Unscheduled inspection
Start date: 2019-09-11, end date: 2019-09-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited. The purpose of the audit is to fulfill the requirements of Part 3 of Article 52 of the Urban Planning Code by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77190803472057
Unscheduled inspection
Start date: 2019-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803480089
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


# 611902828123
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Rostovskoi oblasti
Purpose of inspection: monitoring the implementation of the regulation on the elimination of identified violations of fire safety requirements 104152 dated 25/122018


# 77190803443882
Unscheduled inspection
Start date: 2019-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803435905
Unscheduled inspection
Start date: 2019-06-11, end date: 2019-06-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


# 77190803420077
Unscheduled inspection
Start date: 2019-05-22, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803387057
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803379763
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803265115
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-12-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803265110
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-12-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803211187
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803211186
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803190217
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803166200
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803107348
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-04-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803075841
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803079502
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-02-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803065776
Unscheduled inspection
Start date: 2018-01-18, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 42170802791065
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose Verification of the conformity of the work performed and the building materials used in the construction process Tasks compliance with the requirements of the legislation of the Russian Federation on urban development activities during the construction of the facility Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban development activities


# 77170802924494
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802574770
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701884873
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 74170701500697
Unscheduled inspection
Start date: 2017-04-04, end date: 2017-04-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hr23 st52 of the Urban Planning Code of the Russian Federation


# 74160701104632
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the compliance of work on the installation of control tubes on gas pipeline cases, installation and strapping of GRPS, restoration of landscaping and construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Receipt of a construction permit 3Compliance with the requirements of hh23 st 52 of the Urban Planning Code of the Russian Federation


# 74160601794806
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the development of a trench for a gas pipeline, the installation of a sand base, welding of a gas pipeline into a whip, laying in a trench and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.