# 002005211151
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005229656
Unscheduled inspection
Start date: 2020-11-13, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005196526
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-23, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Inter-field condensate pipeline of the UKPG Beregovoy NGKMUKPG Yaroyakhinsky NGKM" in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are the prevention, detection and suppression of violations of mandatory requirements of regulatory documents The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of the article 52 of this Code
# 002005180666
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 2KGS45 dated September 23, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004459881
Unscheduled inspection
Start date: 2020-08-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004443079
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-14, duration: 11
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the Cenomanian deposit of the Beregovoye field of the license area of CJSC Geotransgaz Connection of a bush of gas wells 30 skv301 302 303 cipher 069DP" The objectives of this audit are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 002004306410
Unscheduled inspection
Start date: 2020-05-06, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902988836
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the regulation on the elimination of identified violations of mandatory requirements 570900919C dated March 26, 2019, previously issued by the state construction supervision authority, based on the notice on the elimination of violations DKS04 dated August 6, 2019. The objectives of this audit are to verify the elimination by a legal entity of the identified violation specified in paragraphs 570900919C dated March 26, 2019. March 2019
# 001903092001
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the previously issued instruction of the North Ural Rostechnadzor Department dated March 20, 2019 59383the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903810774
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose assessment of the licensee's compliance with the licensing requirements based on the Application for renewal of the license dated 04092019 3627 FSETAN Instruction dated 30092019 0705011303 Tasks decision-making on the compliance non-compliance of the licensee with the licensing requirementSubject the condition of premises buildings structures technical facilities equipment of other objects that are supposed to be used by the licensee in carrying out the licensed type of activity and the availability of employees necessary for carrying out the licensed type of activity in order to assess compliance such facilities and employees meet the licensing requirements
# 001902682845
Unscheduled inspection
Start date: 2019-05-16, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00160700139771
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the previously issued instruction of the Severouralsky Department of Rostechnadzor 576935P3 dated 16122015 576935P4 dated 16122015the tasks of this audit are to verify the elimination of violations of industrial safety requirements identified by the Severouralsky Department of the Federal Environmental Technological and Nuclear Supervision Service during an audit in relation to Geotransgaz Joint Stock Company
# 722100175436
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 18
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is being conducted in order to implement the program of inspections for the capital construction facility "Development of the Sysconsin gas field within the Sysconsin license area of NOVATEK-Pur JSC. UKPG reconstruction. DCS "cipher 218.1-P" for the purpose of monitoring the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; fulfillment of the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.
# 722100088326
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722100122763
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-11, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 2-PHM dated March 9, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy conservation and energy efficiency requirements during the construction of a capital construction facility.
-the objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts
# 722100138909
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-11, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 2-KGS10 dated March 19, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility.
-the objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts
# 892100097510
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: Goal:- verification of the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used;
- checking for a building permit; - verification of compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
Tasks: prevention, detection and suppression of violations of legislation on urban development, project documentation, as well as other mandatory requirements.
Subject of verification: compliance with mandatory requirements and/or requirements established by municipal legal acts.
The basis is the notification from NOVATEK-Pur JSC on the completion of the construction of the capital construction facility dated 03/18/2021 No. 1-KGS2
# 892100040789
Unscheduled inspection
Start date: 2021-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722100027090
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-09, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment by a legal entity or individual entrepreneur of paragraphs No.1-2 of the regulation on the elimination of identified violations of mandatory requirements No. 57-09/979-20/R-P dated November 18, 2020, previously issued by the State construction supervision authority, based on the notice of elimination of violations No. 1-PCM dated December 18, 2020.
- the objectives of this audit are: to verify that the legal entity has eliminated the identified violation specified in paragraphs No.1-2 of Regulation No. 57-09/979-20/R-P dated November 18, 2020.
# 002005279481
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-21, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 2KGS5 dated December 2, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005211151
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 1KGS10 dated October 13, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005229656
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance by a legal entity with an individual entrepreneur previously issued by the state construction supervision authority of paragraphs 13 of the regulation on the elimination of identified violations of mandatory requirements 570901320C dated July 22, 2020 on the basis of the notice on the elimination of violations of 1KGS5 dated September 21, 2020. the objectives of this audit are to verify the elimination by a legal entity of the identified violation specified in paragraphs 13 of regulation 570901320C dated July 22, 2020
# 002005196526
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-23, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Inter-field condensate pipeline of the UKPG Beregovoy NGKMUKPG Yaroyakhinsky NGKM" in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility. The objectives of this inspection are the prevention, detection and suppression of violations of mandatory requirements of regulatory documents The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of the article 52 of this Code
# 002005190975
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-11-18, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of a notice of completion of the 1PMP dated October 1, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005180666
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 2KGS45 dated September 23, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005180664
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the 4KGS30 completion notice dated September 22, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004459881
Unscheduled inspection
Start date: 2020-08-05, end date: 2020-09-01, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the notice of completion of 1DQSV dated July 2, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements 7 The subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. by parts 2 3 and 3_1 of Article 52 of this Code
# 002004443079
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-14, duration: 11
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of an order previously issued by the state construction supervision authority to eliminate violations of mandatory requirements based on a notice of elimination of violations for the capital construction facility "Development of the Cenomanian deposit of the Beregovoye field of the license area of CJSC Geotransgaz Connection of a bush of gas wells 30 skv301 302 303 cipher 069DP" The objectives of this audit are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 002004416434
Unscheduled inspection
Start date: 2020-06-25, end date: 2020-07-22, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the 1KGS5 completion notice dated April 23, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004404281
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-05, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the notice of completion of the 1KP dated March 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 722004239064
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-29, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: The purpose of fulfilling paragraph 1 of the instruction on the elimination of identified violations dated 0612201924t, hereinafter referred to as the Instruction issued earlier by Novatek Pur JSC, which expires in 2005-2020, is to verify the elimination of previously identified violations of the forest legislation of the Russian Federation, subject to compliance by a legal entity in the process of carrying out activities with the mandatory requirements of the legislation of the Russian Federation in the field of forest relations
# 002004306410
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the 3KGS30 completion notice dated February 11, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001904056905
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: The audit is carried out in order to verify the report on the elimination of identified inconsistencies with the accreditation criteria submitted by the letter of NOVATEKPur Joint Stock Company dated 18102019 4342 bx 597 dated 30102019the objectives of the audit are to establish the fact that an accredited person has eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence UFO658U dated 01102019the subject of verification is compliance with mandatory requirements and or requirements established by municipal legal acts
# 721903995743
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-06, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: The purpose is to establish the compliance of the legal entity's activities with the requirements of the current legislation of the Russian Federation in the field of environmental protection based on a reasoned submission by an official of the state control and supervision body prepared based on the results of consideration of information about the threat of harm to the life and health of citizens, harm to animals, plants, and the environment as a result of unauthorized use of a forest plot. The task is to ensure that the legal entity, including its officials of the established procedure for the use of the forest fund as well as other requirements established by the forest legislation of the Russian Federation are subject to compliance by a legal entity in the process of carrying out activities with the mandatory requirements of the legislation of the Russian Federation in the field of forest relations
# 001904041365
Unscheduled inspection
Start date: 2019-12-10, end date: 2020-01-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the notice of completion of 1DKS dated November 15, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 721904174555
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-19, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: Purpose verification of compliance by a legal entity of NOVATEKPUR JSC with the requirements of previously issued regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements 18 dated 19072018 22 dated 19072018 issued on the basis of the inspection Act 84 dated 19072018the task is to monitor compliance with mandatory requirements of the legislation of the Russian Federation when executing previously issued regulations on the elimination of identified violations by NOVATEKPUR JSC legislation in the field of environmental protection and violations of environmental requirements 18 of 19072018 22 of 19072018 issued on the basis of the Inspection Act 84 of 19072018preservation of regulations
# 001902988836
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the regulation on the elimination of identified violations of mandatory requirements 570900919C dated March 26, 2019, previously issued by the state construction supervision authority, based on the notice on the elimination of violations DKS04 dated August 6, 2019. The objectives of this audit are to verify the elimination by a legal entity of the identified violation specified in paragraphs 570900919C dated March 26, 2019. March 2019
# 001903092001
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the previously issued instruction of the North Ural Rostechnadzor Department dated March 20, 2019 59383the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903810774
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose assessment of the licensee's compliance with the licensing requirements based on the Application for renewal of the license dated 04092019 3627 FSETAN Instruction dated 30092019 0705011303 Tasks decision-making on the compliance non-compliance of the licensee with the licensing requirementSubject the condition of premises buildings structures technical facilities equipment of other objects that are supposed to be used by the licensee in carrying out the licensed type of activity and the availability of employees necessary for carrying out the licensed type of activity in order to assess compliance such facilities and employees meet the licensing requirements
# 721904177907
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-13, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: Purpose verification of compliance by a legal entity of NOVATEKPUR JSC with the requirements of a previously issued regulation on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements 6 dated 13022019 inspection Act 17 dated 13022019the task is to monitor compliance with mandatory requirements of the legislation of the Russian Federation in the execution by NOVATEKPUR JSC of a previously issued regulation on the elimination of identified violations of legislation in the field of environmental protection and violations of environmental protection requirements 6 dated 13022019 issued on the basis of the inspection act 17 dated 13022019 on compliance with the regulations of state control bodies supervision of municipal control bodies
# 001902682845
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-06-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with the previously issued instruction of the Severouralsky Rostechnadzor Department 598487P dated December 13, 2018. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts in the field of state energy supervision and to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations requirements of federal laws and other regulatory legal acts when conducting an audit in relation to NOVATEKPUR JSC
# 001902655848
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-03-26, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspections of a capital construction facility completed on the basis of the 1DKS completion notice dated January 31, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts
# 721902843091
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: This audit is conducted in order to verify the fulfillment by a legal entity of the requirements of a previously issued regulation on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements the purpose of this audit is to monitor compliance with the mandatory requirements of the legislation of the Russian Federation in the execution of a previously issued regulation on the elimination of identified violations of legislation in the field of environmental protection and violations of environmental requirements
# 721802050309
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-12-05, duration: —
Authority: Gosudarstvennaya inspekciya truda v YAmaloNeneckom avtonomnom okruge
Purpose of inspection: this audit is conducted in order to protect the rights and interests of an employee of Abueva TS in connection with information received from GBUZ Yamalo-Nenets Autonomous District "TSRB" URB branch about an accident on 08102018. supervision of compliance with mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms assessment of compliance of a legal entity's activities with mandatory requirements of labor legislation and other regulatory legal acts containing norms of labor law protection of labor rights and freedoms of employees of the enterprise prevention of violations of mandatory requirements of labor legislation and other regulatory legal acts containing norms of labor lawthe purpose of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts to prevent harm to the life health of citizens harm to animals plants and the environment
# 001801903069
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the previously issued instruction of the Severouralsky Rostechnadzor Department 59794P dated April 09, 2018. The objectives of this audit are to verify the elimination of violations of requirements in the electric power industry identified by the Severouralsky Department of the Federal Environmental Technological and Nuclear Supervision Service during an audit in relation to GEOTRANSGAZ JOINT STOCK COMPANY
# 89170802268043
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160700139771
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-14, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the previously issued instruction of the Severouralsky Department of Rostechnadzor 576935P3 dated 16122015 576935P4 dated 16122015the tasks of this audit are to verify the elimination of violations of industrial safety requirements identified by the Severouralsky Department of the Federal Environmental Technological and Nuclear Supervision Service during an audit in relation to Geotransgaz Joint Stock Company
# 89160601783213
Unscheduled inspection
Start date: 2016-08-04, end date: 2016-08-31, duration: —
Authority: Federalnaya sluzhba po trudu i zanyatosti
Purpose of inspection: protection of the rights and interests of employees in connection with the consideration of the appeal from 03082016 4180216PV On the appeal of a Short-term employee
# 00160601553447
Unscheduled inspection
Start date: 2016-04-12, end date: 2016-04-18, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the previously issued instruction of the North Ural Rostechnadzor Department 576935P1 dated 16/12/2015