Found 79 inspections:

# 002004235027
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-25, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the fact of fulfillment or non-fulfillment of the instruction dated 05122019 DS407162019 previously sent to Mosstroymechanization5 JSC on the elimination of identified violations with a deadline for elimination until 21012020the objectives of the audit are to bring the activities of Mosstroymechanization5 JSC in line with the requirements of legal acts regulating legal relations in the field of participation in the shared construction of apartment buildings and or other facilities when attracting funds from citizens and legal entities for the construction of residential buildings at the address of the Place of business, Moscow region, Zheleznodorozhny Leonovskoe Highway, 2 building 8The subject of this audit is the fulfillment by Mosstroymechanization5 JSC of the DS407162019 instruction on the elimination of identified violations dated 05122019


# 001902926725
Unscheduled inspection
Start date: 2019-08-02, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 772105330584
Unscheduled inspection
Start date: 2021-01-27, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection:


# 772004481310
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-25, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the execution of an instruction previously issued to the person being checked


# 002004235027
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-25, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the fact of fulfillment or non-fulfillment of the instruction dated 05122019 DS407162019 previously sent to Mosstroymechanization5 JSC on the elimination of identified violations with a deadline for elimination until 21012020the objectives of the audit are to bring the activities of Mosstroymechanization5 JSC in line with the requirements of legal acts regulating legal relations in the field of participation in the shared construction of apartment buildings and or other facilities when attracting funds from citizens and legal entities for the construction of residential buildings at the address of the Place of business, Moscow region, Zheleznodorozhny Leonovskoe Highway, 2 building 8The subject of this audit is the fulfillment by Mosstroymechanization5 JSC of the DS407162019 instruction on the elimination of identified violations dated 05122019


# 772004201461
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772004201473
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-02-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control of the execution of the previously issued to the person being checked regulation 3311 dated 12082019


# 772004206294
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-02-14, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose is to monitor the fulfillment by the person being audited of the previously issued instruction to eliminate violations of mandatory fire safety requirements dated January 25, 2019 3111 tasks are to verify compliance with fire safety requirements established by federal laws and laws and other regulations of the City of Moscow adopted in accordance with other regulatory legal acts of the Russian Federation, taking measures based on the results of these inspections. compliance with the regulations of state control bodies, supervision bodies of municipal control


# 001903944590
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-12-05, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the fact of fulfillment or non-fulfillment of the instruction dated 30092019 DS404862019 previously sent to Mosstroymechanization5 JSC on the elimination of identified violations with a period of elimination until 31102019. The objectives of the audit are to bring the activities of Mosstroymechanization5 JSC in line with the requirements of legal acts regulating legal relations in the field of participation in the shared construction of apartment buildings and or other when attracting funds from citizens and legal entities for the construction of residential buildings at the address of the Place of business, Moscow region, Zheleznodorozhny Leonovskoe Highway, 2 building 8, the subject of this audit is the fulfillment by Mosstroymechanization5 JSC of the DS404862019 regulation on the elimination of identified violations dated 30092019


# 501903903555
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 26082019 0908003405509 with a deadline of 25102019


# 501903903391
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 26082019 0908003404513 with a deadline of 25102019


# 501903903338
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 771903897037
Unscheduled inspection
Start date: 2019-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 001903777579
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-10-23, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the fact of fulfillment or non-fulfillment of the instructions from 23082019 DS403982019 on the elimination of identified violations previously sent to MOSSTROYMECHANIZATION5 JOINT STOCK COMPANY with a deadline for elimination until 23092019. The objectives of the audit are to bring the activities of MOSSTROYMECHANIZATION5 JOINT STOCK COMPANY in line with the requirements of legal acts regulating legal relations in the field of participation in the shared construction of apartment buildings and or other real estate objects when attracting funds from citizens and legal entities for the construction of residential buildings at the address Moscow region Zheleznodorozhny Leonovskoe Highway, building 2, building 8, the subject of this audit is the fulfillment by MOSSTROYMECHANIZATION5 Joint STOCK COMPANY of the regulation dated 23082019 DS403982019 on the elimination of identified violations with a period of elimination until 23092019


# 501902992324
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 501902992366
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-26, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order dated 21062019 0908003405508 with a deadline of 19082019


# 501902992292
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 001902926725
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-29, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: This audit is conducted in order to verify the facts of violations of the requirements of the Federal Law of 30122004 214 FZ "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" regulatory legal acts of the President of the Russian Federation regulatory legal acts of the Government of the Russian Federation regulatory legal acts of the authorized body acts of appeal of Karpovets EA 07OG845482019 dated 22072019 on 4 sheets the objectives of this audit are to ensure that JSC MSM5 complies with the requirements of legal acts regulating legal relations in the field of participation in the shared construction of apartment buildings and other real estate objects when attracting funds from citizens and legal entities for the construction of residential buildings located at Zheleznodorozhny, Moscow Region Leonovskoe Highway possession 2 building 8 the subject of this audit is compliance by the developer of JSC MSM5 with the mandatory requirements established by Part 2 of Art 1 and Articles 18 19 20 21 of the Federal Law of 30122004 214 FZ "On participation in the shared construction of apartment buildings and other real estate objects and on Amendments to certain legislative acts of the Russian Federation" during the construction of residential buildings houses located at the address Moscow region Zheleznodorozhny Leonovskoe highway possession 2 building 8 for the period from the 2nd quarter of 2012 to the 2nd quarter of 2019


# 501902936090
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-07, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 03062019 0908027300513 with a deadline of 03102019


# 771902901257
Unscheduled inspection
Start date: 2019-07-26, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection:


# 771902901180
Unscheduled inspection
Start date: 2019-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 501902869861
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-21, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 05042019 0908003403511 with a deadline until 03062019


# 501902869754
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration:
Authority:
Purpose of inspection:


# 501902868810
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-21, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 05042019 0908003405507 with a deadline until 03062019


# 771902632238
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-17, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the execution of the instruction on the elimination of violations of fire safety requirements. The objectives of the audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to verify compliance by legal entities and individual entrepreneurs with mandatory fire safety requirements and to take measures based on the results of this audit. The subject of the audit is to comply with the instructions of state control bodies, supervision of municipal control bodies


# 501902661406
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-05, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001398487051522565598 dated 22032019 within the framework of regulation 0908027300512 dated 11032019 with a deadline of 24042019


# 501902658205
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 501902658241
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 501902658236
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-05, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the instruction on the elimination of violations 0908003404510 dated 21.012019


# 501902605333
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-11, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001872858849721629548 dated 22022019 within the framework of the instruction 0908027300511 dated 29012019 with a deadline of up to 28022019


# 771902474164
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 501902506671
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-01-21, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 03072018 0908003403509 with a deadline until 24092018


# 501902506625
Unscheduled inspection
Start date: 2019-01-14, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 501902506763
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-01-21, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 03072018 0908003405505 with a deadline until 03092018


# 501902466513
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-01-21, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 03072018 0908003403509 with a deadline until 24092018


# 501902506964
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-29, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001266393486119996759 dated 29/12/2018 within the framework of regulation 0908027300510 dated 20122/2018 with a deadline of 21.012019


# 771902449736
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority:
Purpose of inspection:


# 501802413780
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-20, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001286782680318533958 dated 15/12/2018 within the framework of the instruction 0908027300509 dated 30102018 with a deadline of 17/122018


# 771802062626
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the execution of the instruction on the elimination of violations of fire safety requirements. The objectives of the audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to verify compliance by legal entities and individual entrepreneurs with mandatory fire safety requirements and to take measures based on the results of this audit. The subject of the audit is to comply with the instructions of state control bodies, supervision of municipal control bodies


# 501802097406
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-30, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001579262377416398249 dated 20092018 within the framework of regulation 0908027300508 dated 23082018 with a deadline of 01102018


# 771801487279
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-10-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: supervision in the field of protection of the population and territories from emergency situations 68FZ monitoring the implementation of the regulation on the elimination of violations of requirements in the field of protection of the population and territories from emergency situations 242 dated 29/12/2017


# 771801487408
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-10-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Civil defense FZ28 monitoring the implementation of the regulation on the elimination of violations of requirements in the field of civil defense No. 232 dated 29/12/2017


# 771801473753
Unscheduled inspection
Start date: 2018-09-18, end date: —, duration:
Authority:
Purpose of inspection:


# 501800685549
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-08-23, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001042982966914897424 dated 01082018 within the framework of regulation 0908027300507 dated 05062018 with a deadline of 26072018


# 501800415154
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-03, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001414205975612969773 dated 14052018 within the framework of regulation 0908003405504 dated 31.012018 with a deadline of up to 30032018


# 501800415112
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-03, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001206603970812969613 dated 14052018 within the framework of regulation 0908003404508 dated 31.012018 with a deadline of up to 30032018


# 501800415077
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-03, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001478241157212969414 dated 14052018 within the framework of regulation 0908003403508 dated 31.012018 with a deadline of up to 30032018


# 501800353496
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-06-05, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001868702506912469586 dated 19042018 within the framework of regulation 0908027300510 dated 31.012018 with a deadline of 14032018


# 771800356056
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-06-13, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the execution of the instruction on the elimination of violations of fire safety requirements. The objectives of the audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to verify compliance by legal entities and individual entrepreneurs with mandatory fire safety requirements and to take measures based on the results of this audit. The subject of the audit is to comply with the instructions of state control bodies, supervision of municipal control bodies


# 771800275113
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the execution of the instruction on the elimination of violations of fire safety requirements. The objectives of the audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to verify compliance by legal entities and individual entrepreneurs with mandatory fire safety requirements and to take measures based on the results of this audit. The subject of the audit is to comply with the instructions of state control bodies, supervision of municipal control bodies


# 771800074677
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-09, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: purpose control over the implementation of regulation No. 14611 of 05062017 tasks to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them and to take measures based on the results of the audit subject to compliance with the instructions of state control bodies supervision bodies of municipal control


# 771800060453
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-03-06, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: The purpose of monitoring the fulfillment of the official's instruction on the elimination of violations of sanitary requirements 020300291 dated November 07, 2017. The objectives of this audit are to monitor compliance with mandatory requirements in the field of sanitary and epidemiological human well-being. The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 771800059740
Unscheduled inspection
Start date: 2018-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802878914
Unscheduled inspection
Start date: 2017-11-24, end date: 2017-12-06, duration:
Authority: Gosudarstvennaya inspekciya po kontrolyu za ispolzovaniem obektov nedvizhimosti goroda Moskvy
Purpose of inspection: Verification of the execution of the prescription


# 77170802878891
Unscheduled inspection
Start date: 2017-11-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802799950
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-30, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Control over the implementation of regulation 1041 of 17112016 on the elimination of violations of mandatory requirements for the protection of the population and territory from emergencies


# 77170802799909
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802789514
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-11-21, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: Ensuring the sanitary and epidemiological well-being of the population monitoring compliance with the requirements of paragraphs 15 7 10 11 of Regulation 010300027 of 29032017 Monitoring compliance with mandatory requirements in the field of sanitary and epidemiological well-being of the populationcompliance with mandatory requirements and or requirements established by municipal legal acts compliance with regulations of state control and supervision bodies


# 77170802763970
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-11-21, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: Ensuring sanitary and epidemiological welfare of the population monitoring compliance with the requirements of paragraphs 15 7 10 11 of Regulation 010300027 of 29032017 Monitoring compliance with mandatory requirements in the field of sanitary and epidemiological welfare of the population compliance with the requirements of state control and supervision bodies


# 77170802549652
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-27, duration:
Authority: Gosudarstvennaya inspekciya po kontrolyu za ispolzovaniem obektov nedvizhimosti goroda Moskvy
Purpose of inspection: Verification of the execution of the prescription


# 77170802549457
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802135495
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-10-11, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the execution of the instruction on the elimination of violations of fire safety requirements. The objectives of the audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to verify compliance by legal entities and individual entrepreneurs with mandatory fire safety requirements and to take measures based on the results of this audit. The subject of the audit is to comply with the instructions of state control bodies, supervision of municipal control bodies


# 50170802661750
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 50170802655837
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-28, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the instruction 09080034403505 from 04082017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building at 143980 Moscow region Zheleznodorozhny Leonovskoe highway 2 position 3


# 77170701807042
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-08-09, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's appeal dated 30062017 72695417 on remuneration issues


# 50170802656054
Unscheduled inspection
Start date: 2017-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 50170802656092
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-04, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the fulfillment of the instruction 09080034404504 dated 15062017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building at 143980 Moscow region Zheleznodorozhny Leonovskoe highway 2 position 4


# 50170801929685
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration:
Authority:
Purpose of inspection:


# 50170801928952
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-04, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the fulfillment of the instruction 0908027300503 dated 15062017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Reconstruction of VZU 8 at 143900 Moscow region Balashikha Leonovskoe highway Park lane 8 In


# 77170701726540
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration:
Authority: Gosudarstvennaya inspekciya po kontrolyu za ispolzovaniem obektov nedvizhimosti goroda Moskvy
Purpose of inspection: Verification of the execution of a previously issued prescription


# 77170701726562
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-07-17, duration:
Authority: Gosudarstvennaya inspekciya po kontrolyu za ispolzovaniem obektov nedvizhimosti goroda Moskvy
Purpose of inspection: Verification of the execution of a previously issued prescription


# 77170701655565
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-26, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Control over the implementation of the regulation GPN 39411 of 24102016 on the elimination of violations of fire safety requirements on the implementation of measures to ensure fire safety at protection facilities and to prevent the threat of fire


# 77170701554664
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-05-20, duration:
Authority: Gosudarstvennaya inspekciya po kontrolyu za ispolzovaniem obektov nedvizhimosti goroda Moskvy
Purpose of inspection: Control of the execution of the regulation from 20032017 90208402


# 50170701615713
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-27, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the fulfillment of the instruction 0908003404502 dated 22022017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building at 143980 Moscow region Zheleznodorozhny Leonovskoe highway 2 position 4


# 50170701615612
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-27, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: execution of the instruction 0908003403503 dated 22022017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building at 143980 Moscow region Zheleznodorozhny Leonovskoe highway possession 2 position 3


# 77160701296430
Unscheduled inspection
Start date: 2016-12-30, end date: 2017-02-02, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: compliance with labor legislation protection of the rights and interests of employees in connection with the consideration of the appeal dated 06122016 75127016 on labor remuneration supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements or requirements established by municipal legal acts


# 77160701296426
Unscheduled inspection
Start date: 2016-12-29, end date: 2017-02-01, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Compliance with labor legislation in order to monitor the implementation of previously issued regulations dated 26102016 6607116PV484683 supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms compliance with regulations of state control bodies supervision of municipal control bodies


# 77160701092613
Unscheduled inspection
Start date: 2016-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77150601443635
Unscheduled inspection
Start date: 2015-09-23, end date: 2015-10-14, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of Regulation 27611 of 29042015 on the elimination of violations of fire safety requirements on the implementation of measures to ensure fire safety at protective facilities and to prevent the threat of fire


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.