Found 9 inspections:

# 242201915339
Unscheduled inspection
Start date: 2022-04-21, end date: —, duration:
Authority:
Purpose of inspection:


# 242100185528
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: 3
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: Objectives: fulfillment of the deadline for prescriptions No. 21/1/1 – 21/1/11 prescriptions for the elimination of violations of established requirements and measures in the field of civil defense in the Turukhansky district No. 21/1/1-11 dated 04/06/2020, the deadline for which expired on 03/31/2021; Tasks: implementation, in accordance with the procedure established by the legislation of the Russian Federation, of activities to verify compliance with requirements in the field of civil defense and take measures based on the results of this audit; The subject of the audit: compliance with the instructions of state control (supervision) bodies, municipal control bodies.


# 242005207666
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241802325006
Unscheduled inspection
Start date: 2018-12-24, end date: 2019-01-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of received notification 302 dated 14122018 on the completion of construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation 7 The subject of this inspection is 71 Verification of compliance with the implementation of works and construction materials used during the construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and to the requirements of equipping a capital construction facility with metering devices for energy resources used, all acts prescriptions notices on the elimination of violations of deficiencies identified during implementation of regional state construction supervision 72 Compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a construction permit


# 241802009481
Unscheduled inspection
Start date: 2018-10-30, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800490916
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the audited person of the instruction dated 27112017 4625SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 29062018 the objectives of this audit are to establish the fact of elimination of previously identified violations, verification of actually performed works in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the order of the authority carrying out regional state construction supervision


# 24170802746805
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802201185
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-10-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19102016 6811SENiEK on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 05092017 vx 90 on the elimination of violations before the expiration of the period specified in the prescription, the objectives of this inspection is to establish the fact of elimination of previously identified violations, verification of actually performed works in accordance with prescribed measures. The purpose of this inspection is to comply with the legal order of the body carrying out regional state construction supervision


# 24170802186242
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19062017 2531NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 04092017 vx 89 on the elimination of violations before the expiration of the period specified in the prescription, the objectives of this inspection is to establish the fact of elimination of previously identified violations, verification of actually performed works in accordance with prescribed measures. The purpose of this inspection is to comply with the legal order of the body carrying out regional state construction supervision