Found 90 inspections:

# 772101143230
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772100990217
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-25, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100570898
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772100226139
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-28, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100052352
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-29, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772005200388
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration:
Authority:
Purpose of inspection:


# 772004512821
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 772004486832
Unscheduled inspection
Start date: 2020-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772004440390
Unscheduled inspection
Start date: 2020-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 772004412693
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-05-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004312893
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772004382878
Unscheduled inspection
Start date: 2020-03-26, end date: —, duration:
Authority:
Purpose of inspection:


# 772004325722
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004230924
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771904139454
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903994967
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 771903821481
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority:
Purpose of inspection:


# 771903761299
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection:


# 77190803483063
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-08-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803486702
Unscheduled inspection
Start date: 2019-08-27, end date: 2019-08-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803458540
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: this audit is carried out in order to carry out control measures in connection with the verification of compliance with the instruction based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, issued by the state construction supervision authority, of an order to eliminate an identified violation of mandatory requirements from 03062019 446819 The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person. The subject of this audit is verification of the elimination of violations specified in the order issued by Mosgosstroynadzor 446819 dated 03062019


# 77190803448514
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803455303
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803430540
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803447618
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803445481
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-06-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803422986
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: this inspection is carried out in order to carry out control measures in connection with the implementation of the inspection program on the basis of the approved inspection program dated 17072018 1The objectives of this inspection are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The subject of this inspection is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources verification of the elimination of violations specified in the order issued by Mosgosstroynadzor 243619 of 05042019


# 77190803423324
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803391617
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803402872
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803379613
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803343805
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803314343
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803315673
Unscheduled inspection
Start date: 2019-01-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803295892
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803278367
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803265997
Unscheduled inspection
Start date: 2018-11-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803261916
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803265987
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803255358
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-10-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803221363
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803217942
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803217940
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803238281
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803198827
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803208579
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803185722
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803187416
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-08-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803164658
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803154154
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803127441
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803132283
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803099098
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803087668
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803073723
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802990094
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170803022534
Unscheduled inspection
Start date: 2017-12-25, end date: 2017-12-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170803030407
Unscheduled inspection
Start date: 2017-12-26, end date: 2018-01-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the requirements established by the legislation on urban planning activities within the framework of the subject of state construction supervision


# 77170803030397
Unscheduled inspection
Start date: 2017-12-26, end date: 2018-01-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the requirements established by the legislation on urban planning activities within the framework of the subject of state construction supervision


# 77170802811137
Unscheduled inspection
Start date: 2017-11-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802882149
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802783574
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802756370
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802734502
Unscheduled inspection
Start date: 2017-10-13, end date: 2017-10-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170801971809
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170801942607
Unscheduled inspection
Start date: 2017-08-30, end date: 2017-09-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170801942605
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701825432
Unscheduled inspection
Start date: 2017-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701828269
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701693537
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701746806
Unscheduled inspection
Start date: 2017-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701649879
Unscheduled inspection
Start date: 2017-05-25, end date: 2017-06-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701547651
Unscheduled inspection
Start date: 2017-05-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701563605
Unscheduled inspection
Start date: 2017-04-27, end date: 2017-05-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701510674
Unscheduled inspection
Start date: 2017-04-04, end date: 2017-04-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701463003
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701367177
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701331657
Unscheduled inspection
Start date: 2017-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701302410
Unscheduled inspection
Start date: 2017-01-12, end date: 2017-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701210895
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701162722
Unscheduled inspection
Start date: 2016-12-07, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160701114394
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the instruction issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an instruction issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements, the objectives of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The subject of this audit is to verify the elimination of violations specified in the instruction issued by Mosgosstroynadzor 1072416 of 17102016


# 77160701083028
Unscheduled inspection
Start date: 2016-11-03, end date: 2016-11-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701014598
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-11-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation6 committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with technical requirements regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


# 77160700965443
Unscheduled inspection
Start date: 2016-10-07, end date: 2016-10-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentation on the basis of the approved verification program The tasks of this audit are the prevention identification and suppression of violations of technical regulations and design documentation committed by the audited person The subject of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 945816 of 15092016 compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160700131468
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700112922
Unscheduled inspection
Start date: 2016-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700360857
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-10-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700048029
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this inspection are to prevent, identify and suppress violations of technical regulations and project documentation committed by the person being audited. The subject of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 785616 from 26072016


# 77160601730758
Unscheduled inspection
Start date: 2016-07-22, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.