# 772101441174
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101441176
Unscheduled inspection
Start date: 2021-12-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101422385
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-29, duration: 18
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772101502185
Unscheduled inspection
Start date: 2021-12-29, end date: —, duration: 6
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of Regulation No. 09-27-116300-05-02 dated September 06, 2021. with a deadline of 13.12.2021)
# 772101440399
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Conducting an inspection based on the notice of completion of construction dated 02.12.2021 No. P001-8406186304-52657447, assessing the compliance of the work performed with the requirements of the project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts
# 772101288737
Unscheduled inspection
Start date: 2021-11-10, end date: 2021-11-23, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772101326188
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101326182
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101276748
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101259040
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101371834
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 6
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations (notification of the elimination of violations No. P001-4435390323-51961297 dated 11/12/2021 within the framework of Regulation No. 01-31-186000-05 dated August 17, 2021 with a deadline until 11/17/2021).
# 772101328834
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101338503
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-12-10, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772101329488
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101328831
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-12-10, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772101187806
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101069853
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations , assessment of the performance of work according to the requirements of the project documentation
# 772100631966
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100683771
Unscheduled inspection
Start date: 2021-09-09, end date: 2021-09-17, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100905656
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of Regulation No. 04-61-169200-05-01 dated 07/27/2021 with a deadline of execution until 09/27/2021.
# 772100948287
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations (notification of the elimination of violations No. P001-4003223634-49570731 dated 09/14/2021 within the framework of Regulation No. 09-27-116300-05-02 dated September 06, 2021. with a deadline of 13.12.2021).
# 772100518623
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100627254
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100627482
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration: 4
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the execution of the order, assessment of the conformity of the work performed as part of the verification of the execution of the order
# 772100759418
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100782549
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations (notification of the elimination of violations No. P001-4003223634-49080162 dated 09/02/2021 within the framework of Regulation No. 09-27-116300-05-01 dated July 12, 2021. with a deadline of 14.09.2021).
# 772100546220
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100569642
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100518593
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of compliance of the performed works with the requirements of the project documentation
# 772100425303
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: 4
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: compliance with mandatory requirements and (or) requirements established by municipal legal acts
# 772100358199
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100349185
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100343592
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100324209
Unscheduled inspection
Start date: 2021-07-05, end date: 2021-07-23, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100255273
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100959349
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 5
Authority: Prokuratura Moskovskoi oblasti
Purpose of inspection: assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility "Integrated residential development with infrastructure facilities at the address: Moscow region, Leninsky municipal district, Molokovskoye rural settlement, Misailovo village and Dalnye Prudishchi village, 4th stage, 1st and 2nd stage of construction: microdistrict 2, block 4, residential buildings No.57,58,59,60,61,62,63 (1st stage of construction, residential buildings 57,58,59,60,61)" at the address: Moscow region, Leninsky district, S.P. Molokovskoye, D. Misailovo and D. Dalniye Prudishchi
# 772100310323
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-12, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100303502
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration: 7
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of elimination of violations
# 772100266937
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100230559
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100146048
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-14, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100188840
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of Regulation No. 01-31-181800-05-01 dated 02/17/2021 with a deadline of execution until 04/16/2021
# 772100105747
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100181983
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-14, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100101388
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-07, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772105316918
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-16, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772005268463
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005138734
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502004486423
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 772004488825
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004488807
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004433708
Unscheduled inspection
Start date: 2020-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004433700
Unscheduled inspection
Start date: 2020-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004321469
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004353041
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004352081
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-04-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 501904174696
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-30, duration: 3
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001406189714731816449 dated 12122019 within the framework of regulation 0927099400503 dated 22102019 with a deadline of 23122019
# 771904043571
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 501903959902
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-14, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order dated 09102019 0927103800501 with a deadline of 08112019
# 501903894565
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-11, duration: 4
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of compliance with the regulation notice of elimination of violations P001004903538429216886 dated 30092019 within the framework of the regulation dated 22082019 0927095600502 with a deadline of 25102019
# 501902940048
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-14, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001704943525226698925 dated 29072019 within the framework of regulation 0927099400502 dated 29052019 with a deadline of 29072019
# 77190803461231
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 501902867058
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-29, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order dated 29032019 0927099400501 deadline 15052019
# 77190803397450
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803374184
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803315064
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration: —
Authority: —
Purpose of inspection: