Found 39 inspections:

# 00170802883151
Unscheduled inspection
Start date: 2017-12-05, end date: 2018-01-09, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: control of the execution of the prescription


# 562101427248
Unscheduled inspection
Start date: 2021-12-10, end date: 2021-12-10, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: implementation of regional state construction supervision in connection with receipt of a notice of completion of construction of a capital construction facility;, the objectives of this inspection are: prevention, detection and suppression of violations of the legislation on urban development activities committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation)., The subject of this audit is compliance with: compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation, the requirement for a construction permit; the requirements established by Parts 2 and 3.1 of Article 52 of this Code; requirements for the procedure for carrying out construction control established by this Code, other regulatory legal acts acts.


# 562101497904
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562101385090
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program, - the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Development Code of the Russian Federation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation). -The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for the implementation of construction control established by the Urban Planning Code and other regulatory legal acts


# 562101377616
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of a notice of the beginning of construction; - the objectives of this audit are: to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, legislation on urban planning (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation). The subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used.


# 562101367789
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: 1. This inspection is carried out for the purpose of: carrying out regional state construction supervision on the basis of the inspection program approved on 30.06.2021 (as amended on 08.10.2021). 2. The objectives of this inspection are: prevention, identification and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation). 3. The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for the implementation of construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts; 5) p.p. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 verification programs.


# 562100734285
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - purpose: implementation of regional state construction supervision in connection with receipt of notification of completion of the capital construction facility; - the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Development Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation). - the subject of this audit is compliance: 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of this Code; 4) requirements for the procedure for the implementation of construction control established by this Code and other regulatory legal acts.


# 562100734069
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - purpose: to carry out regional state construction supervision in connection with the receipt of a notice of completion of the capital construction facility; - the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Development Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation). - the subject of this audit is compliance: 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of this Code; 4) requirements for the procedure for the implementation of construction control established by this Code and other regulatory legal acts.


# 562100733865
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 562100733506
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 562100733307
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - purpose: to carry out regional state construction supervision in connection with the receipt of a notice of completion of the capital construction facility; - the objectives of this audit: prevention, identification and suppression of violations of the legislation on urban development, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Development Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation). - the subject of this verification is compliance: 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of this Code; 4) requirements for the procedure for the implementation of construction control established by this Code and other regulatory legal acts.


# 562100842805
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562100520693
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - purpose: implementation of regional state construction supervision on the basis of the inspection program approved on 06/07/2021; - the tasks of this audit: prevention, detection and suppression of violations of the legislation on urban development, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Development Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation). - the subject of this audit is compliance: 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for the implementation of construction control established by the urban Planning Code and other regulatory legal acts. 5) paragraphs 1,2,3,4,5 of the inspection program).


# 562100515893
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562100520855
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:


# 562100520769
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration:
Authority:
Purpose of inspection:


# 562100516121
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration:
Authority:
Purpose of inspection:


# 562100332568
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the notice of the beginning of construction dated 06/22/2021 (reg. No. 927 dated 06/23/2021), the inspection program approved on 30.06.2021; identification and suppression of violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, legislation on urban planning (Part 5 of Article 52, Part 2 of Article 51, Part 2, Part 3, Part 3.1, Part 6 of Article 52 of the Urban Planning Code of the Russian Federation); compliance of the performed works and applied building materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; paragraph 1 of the inspection program dated 30.06.2021, compliance with mandatory requirements of urban planning legislation (Part 5 of Article 52, Part 2 of Article 51, Part 2, Part 3, Part 3.1, Part 6 of Article 52 of the Urban Planning Code of the Russian Federation).


# 562100320645
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 562100221047
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration:
Authority:
Purpose of inspection:


# 562000088322
Unscheduled inspection
Start date: 2021-03-24, end date: 2020-08-12, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection: To establish that: this inspection is carried out in order to: comply with the requirements of the Orenburg Environmental Interdistrict Prosecutor's Office dated 03/16/2021 No. 07/07/2020-G on conducting an unscheduled inspection within the framework of supervision of the execution of laws on materials received by the prosecutor's office (in accordance with paragraph 3 of Part 2 of Article 10 of the Federal Law of the Russian Federation dated December 26, 2008 No. 294-FZ "On the protection of the rights of legal entities and individual entrepreneurs in the implementation of state control (supervision) of municipal control") the objectives of this audit are: supervision and control over the implementation of mandatory requirements of the legislation of the Russian Federation in the field of ensuring sanitary and epidemiological welfare of the population. The subject of this audit is: compliance with mandatory requirements.


# 562004449048
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-20, duration: 20
Authority: YUzhnoUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Requirements of the Orenburg environmental Protection interdistrict Prosecutor's Office from 25062020 07072020 from 06072020 07072020


# 562004446767
Unscheduled inspection
Start date: 2020-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 562004460393
Unscheduled inspection
Start date: 2020-07-16, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection:


# 562004426147
Unscheduled inspection
Start date: 2020-06-03, end date: 2020-06-19, duration:
Authority: YUzhnoUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: The requirement of the Orsk environmental protection interdistrict Prosecutor's office from 18052020 07072020


# 562004419349
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-23, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to comply with the requirement of the Orenburg Environmental Interdistrict Prosecutor's Office from 18052020 07072020 to conduct an unscheduled inspection within the framework of supervision of the execution of laws on materials received by the prosecutor's office in accordance with paragraph 3 of Part 2 of st10 of the Federal Law of the Russian Federation dated December 26, 2008 294 FZ "On the protection of the Rights of Legal Entities and Individual Entrepreneurs in the implementation of state control supervision of municipal control"the objectives of this audit are the implementation of supervision and control over the fulfillment of mandatory requirements of the legislation of the Russian Federation in the field of ensuring sanitary and epidemiological welfare of the populationthe subject of this audit is compliance with mandatory requirements


# 562004442333
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection:


# 562004442321
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration:
Authority:
Purpose of inspection:


# 562004280954
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection:


# 561904069891
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-19, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: The appeal of the residents of the village of Krasny Kommunar of the Sakmarsky district


# 561903930752
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-12-05, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Orenburgskoi oblasti
Purpose of inspection: Purpose confirmation of the facts of identification following the results of the administrative survey of the object of land relations of signs of violations of the requirements of the legislation of the Russian Federation for which the legislation of the Russian Federation provides for administrative and other responsibility act of administrative inspection of the object of land relations 66 dated 21102019 presentation on the appointment of an unscheduled inspection of compliance with land legislation 38 dated 24102019 in accordance with the order of the Ministry of Economic Development of the Russian Federation dated 09012018 7 the above signs of violation of land relations legislation falls under n 3 indicators of the risk of violation of mandatory requirements used to determine the need for unscheduled inspections when carried out by the Federal Service for State Registration of Cadastre and Cartography and its territorial bodies of State Land supervision the purpose of this audit is to ensure compliance of JSC Preobrazhenskneft with land legislation requirements for the protection and use of land the subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts acts


# 561903799386
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notice of completion of construction identification and suppression of violations of the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources legislation on urban development h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation compliance of completed works and applied construction materials in the process of construction of a capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with urban planning legislation h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation


# 561800571671
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-08-17, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: Confirmation of the appeal of the head of the Krasnokommunarsky district Council of the Sakmarsky RNA with complaints from residents of the village of Krasny Kommunar and the Courtyards of the Sakmarsky rna on atmospheric air pollution in the territory of these settlements


# 00170802883151
Unscheduled inspection
Start date: 2017-12-05, end date: 2018-01-09, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: control of the execution of the prescription


# 00170802860157
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-15, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of regulation 32710rpo194 of 21072017, the deadline for which has expired


# 56160701225700
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-12-09, duration:
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: verification of the fact of harm to health according to the notification received by the State Labor Inspectorate in the Orenburg region about a fatal accident with an employee Perunov CM 6300416IZ dated 24102016


# 56160700884290
Unscheduled inspection
Start date: 2016-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 56160700058481
Unscheduled inspection
Start date: 2016-08-25, end date: 2016-09-15, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: compliance with the regulations of 02032015 PNH121 PNH122


# 56150601393598
Unscheduled inspection
Start date: 2015-12-15, end date: 2015-12-28, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: Compliance with the requirements of 02032015 PNE121 PNE122 PNE123 PNE124


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.