Found 18 inspections:

# 002004231040
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 00170802758982
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-20, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere svyazi informacionnyh tehnologii i massovyh kommunikacii po Uralskomu federalnomu okrugu
Purpose of inspection: Consideration of information on violations of the legislation of the Russian Federation in the field of communications identified during the activities of the CH radio monitoring Act CH A662424nd401


# 662201509515
Unscheduled inspection
Start date: 2022-01-10, end date: 2022-01-21, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-17-24/213-16 dated 08/11/2021 (Amendment No. 6), the task of this inspection is to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work performed and the construction materials used in the construction of the capital construction facility "Administrative Building of JSC Uralelectromed at 1 Uspenskiy Avenue, Verkhnyaya Pyshma, Sverdlovsk region. Block 2", located at 1 Uspensky Avenue, Verkhnyaya Pyshma, Sverdlovsk Region, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements a capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662201509575
Unscheduled inspection
Start date: 2022-01-10, end date: —, duration:
Authority:
Purpose of inspection:


# 742101395218
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 662101318150
Unscheduled inspection
Start date: 2021-11-16, end date: 2021-11-29, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/513 dated 10/15/2021 issued by UMMC-Telecom LLC, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 10/15/2021 No. 29-17-29/513, issued by UMMC-Telecom LLC.


# 742101215050
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 662100671510
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 662100671234
Unscheduled inspection
Start date: 2021-09-20, end date: 2021-10-15, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-24/213-16 dated 2021-08-11; The tasks are to carry out regional state construction supervision; The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility: The Administrative Building of Uralelectromed JSC at 1 Uspenskiy Avenue, Verkhnyaya Pyshma, Sverdlovsk Region. Block 2, located at 1 Uspensky Avenue, Verkhnyaya Pyshma, Sverdlovsk Region, meets the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements apply). efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100258145
Unscheduled inspection
Start date: 2021-06-09, end date: 2021-06-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on the installation of external and internal enclosing structures, the installation of pits and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100191433
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-05-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on the installation of external and internal enclosing structures, the installation of pits and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100098896
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on 1. Building foundations 2. Installation of metal structures (during work) and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100040739
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the construction of the foundations of the building, the installation of metal structures (in the course of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105308179
Unscheduled inspection
Start date: 2021-01-26, end date: 2021-02-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work according to 1. Performance of PIC work; 2. Excavation; 3. Foundation construction (in the course of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 002004231040
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-02-18, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere svyazi informacionnyh tehnologii i massovyh kommunikacii po Uralskomu federalnomu okrugu
Purpose of inspection: Control of the execution of orders on the elimination of identified violations from 26072019 P66281nd118


# 331800179207
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-02-16, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere svyazi informacionnyh tehnologii i massovyh kommunikacii po Vladimirskoi oblasti
Purpose of inspection: monitoring the implementation of previously issued regulations on the elimination of identified violations of mandatory requirements from 13072017 P33289nd147698136 verification of compliance with licensing conditions requirements and mandatory requirements for the provision of telecommunication services compliance with regulations of state control and supervision bodies


# 00170802758982
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-20, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere svyazi informacionnyh tehnologii i massovyh kommunikacii po Uralskomu federalnomu okrugu
Purpose of inspection: Consideration of information on violations of the legislation of the Russian Federation in the field of communications identified during the activities of the CH radio monitoring Act CH A662424nd401


# 33170701725661
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-07-14, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere svyazi informacionnyh tehnologii i massovyh kommunikacii po Vladimirskoi oblasti
Purpose of inspection: consideration of information on violations received from the Federal Security Service of Russia in the Vladimir region


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.