Found 59 inspections:

# 001903965467
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-11-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu osuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ustraneniyu narushenii obyazatelnyh trebovanii v svyazi s istecheniem sroka ispolneniya predpisaniya 3028313262373523PR ot 30102018zadachami nastoyaschei proverki yavlyayutsya prinyatie predusmotrennyh zakonodatelstvom Rossiiskoi Federacii mer po presecheniyu i ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom nastoyaschei proverki yavlyaetsyaV vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora


# 001902615791
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-16, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 00170802707662
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ocenka hoda podgotovki obektov teplosnabzheniya k otopitelnomu periodu v sootvetstvii s prikazom Rostehnadzora O kontrole hoda podgotovki obektov elektroenergetiki i teplosnabzheniya k rabote osennezimnii period 20172018 godov ot 10072017 256osuschestvlenie kontrolya za prinimaemymi yuridicheskim licom merami po soblyudeniyu teplosnabzhayuschimi organizaciyami trebovanii bezopasnosti v sfere teplosnabzheniya vliyayuschih na vypolnenie trebovanii po gotovnosti k otopitelnomu periodu


# 00170802170116
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: osuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ustraneniyu narushenii obyazatelnyh trebovanii v svyazi s istecheniem sroka ispolneniya predpisaniya 2778163247PR ot 31102016


# 00160701106477
Unscheduled inspection
Start date: 2016-10-27, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 00160700070130
Unscheduled inspection
Start date: 2016-08-12, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 00160700070095
Unscheduled inspection
Start date: 2016-08-12, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to ensure compliance by heat supply organizations with safety requirements in the field of heat supply that affect the fulfillment of requirements for readiness for the heating period


# 00160601646503
Unscheduled inspection
Start date: 2016-05-30, end date: 2016-06-03, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the activities of legal and individual entrepreneurs in compliance with the requirements of legislation on urban development activities and mandatory norms and rules during the construction and reconstruction of a capital construction facility


# 00150601276964
Unscheduled inspection
Start date: 2015-10-07, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the preparation of electric power industry enterprises and heat supply facilities for the heating period


# 782101312218
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration: 10
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: osuschestvleniya gosudarstvennogo nadzora v oblasti grazhdanskoi oborony, reestrovyi nomer funkcii v federalnoi gosudarstvennoi informacionnoi sisteme "Federalnyi reestr gosudarstvennyh i municipalnyh uslug (funkcii)" – 10001495528


# 782101312213
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 472105336225
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: proverki vypolneniya predpisanii po ustraneniyu narushenii obyazatelnyh trebovanii v oblasti grazhdanskoi oborony ot 02.11.2018 № 4, ot 05.06.2019 goda - preduprezhdenie, vyyavlenie i presechenie narushenii yuridicheskimi licami, ih rukovoditelyami i inymi dolzhnostnymi licami, individualnymi predprinimatelyami, ih upolnomochennymi predstavitelyami obyazatelnyh trebovanii v oblasti grazhdanskoi oborony; - sistematicheskoe nablyudenie za ispolneniem obyazatelnyh trebovanii v oblasti grazhdanskoi oborony; - predotvraschenie vozmozhnogo prichineniya vreda zhizni, zdorovyu grazhdan.


# 472105336276
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: proverki vypolneniya predpisaniya po ustraneniyu narushenii obyazatelnyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii prirodnogo i tehnogennogo haraktera ot 02 noyabrya 2018 g. № 4 - preduprezhdenie, vyyavlenie i presechenie narushenii yuridicheskimi licami, ih rukovoditelyami i inymi dolzhnostnymi licami, individualnymi predprinimatelyami, ih upolnomochennymi predstavitelyami obyazatelnyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii; - sistematicheskoe nablyudenie za ispolneniem obyazatelnyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; - predotvraschenie vozmozhnogo prichineniya vreda zhizni, zdorovyu grazhdan.


# 472004527790
Unscheduled inspection
Start date: 2020-08-28, end date: 2020-09-24, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer technical customer on completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction


# 472004543174
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-31, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Verification of compliance with labor legislation


# 472004461722
Unscheduled inspection
Start date: 2020-07-23, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection:


# 472004306329
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: kontrolya ispolneniya predpisaniya GPN ot 27082019 2146611411


# 472004306220
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: kontrolya ispolneniya predpisaniya GPN ot 27082019 2146611511


# 472004286659
Unscheduled inspection
Start date: 2020-02-13, end date: —, duration:
Authority:
Purpose of inspection:


# 471904069021
Unscheduled inspection
Start date: 2019-12-05, end date: 2020-01-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer technical customer on completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction


# 001903965467
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-11-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu osuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ustraneniyu narushenii obyazatelnyh trebovanii v svyazi s istecheniem sroka ispolneniya predpisaniya 3028313262373523PR ot 30102018zadachami nastoyaschei proverki yavlyayutsya prinyatie predusmotrennyh zakonodatelstvom Rossiiskoi Federacii mer po presecheniyu i ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom nastoyaschei proverki yavlyaetsyaV vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora


# 471903985880
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction metering devices for energy resources used to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction


# 471902978118
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration:
Authority:
Purpose of inspection:


# 471902876444
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-08-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer technical customer on completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction


# 471902810211
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-07-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of works at the beginning of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation


# 471902717421
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu proverki vypolneniya predpisanie po ustraneniyu narushenii obyazatelnyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii prirodnogo i tehnogennogo haraktera ot 02 noyabrya 2018 g 4zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii yuridicheskimi licami ih rukovoditelyami i inymi dolzhnostnymi licami individualnymi predprinimatelyami ih upolnomochennymi predstavitelyami obyazatelnyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii sistematicheskoe nablyudenie za ispolneniem obyazatelnyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii prirodnogo i tehnogennogo haraktera predotvraschenie vozmozhnogo prichineniya vreda zhizni zdorovyu grazhdan


# 471902717242
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu proverki vypolneniya predpisanie po ustraneniyu narushenii obyazatelnyh trebovanii v oblasti grazhdanskoi oborony ot 02 noyabrya 2018 g 4Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v oblasti grazhdanskoi oborony ogranichennyh perechnem voprosov vklyuchennyh v poverochnyi list spisok kontrolnyh voprosov utverzhdennogo prikazom MCHS Rossii ot 27022018 78 «Ob utverzhdenii formy proverochnogo lista spiska kontrolnyh voprosov ispolzuemogo pri osuschestvlenii gosudarstvennogo nadzora v oblasti grazhdanskoi oborony pri provedenii planovyh proverok po kontrolyu za soblyudeniem obyazatelnyh trebovanii v grazhdanskoi oborony» Zaregistrirovano v Minyuste RF 27 marta 2018g registracionnyi 50527 vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora


# 781902610211
Unscheduled inspection
Start date: 2019-04-02, end date: 2019-04-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: s celyu nastoyaschaya proverka provoditsya s celyu kontrolya ustraneniya narushenii trebovanii pozharnoi bezopasnosti ukazannyh v predpisanii ob ustranenii vyyavlennyh narushenii trebovanii pozharnoi bezopasnosti ot 16032018 2211811 srok ispolneniya kotorogo istek srok ustraneniya 01022019 goda zadachami nastoyaschei proverki yavlyayutsya vyyavlenie presechenie i preduprezhdenie vozmozhnyh narushenii trebovanii pozharnoi bezopasnosti osuschestvlenie sistematicheskogo nablyudeniya za ispolneniem trebovanii pozharnoi bezopasnosti Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii trebovanii pozharnoi bezopasnosti predotvraschenie vozmozhnogo prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam sistematicheskoe nablyudenie za ispolneniem trebovanii pozharnoi bezopasnosti Predmetom nastoyaschei proverki yavlyaetsya kontrol ustraneniya narushenii trebovanii pozharnoi bezopasnosti ukazannyh v predpisanii ob ustranenii vyyavlennyh narushenii trebovanii pozharnoi bezopasnosti


# 001902615791
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-16, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 471904000592
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-23, duration:
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms


# 471802328587
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-24, duration:
Authority: SeveroZapadnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Compliance with the instructions of the state control bodies


# 471802087972
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-11-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt of an application


# 471800614456
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction metering devices for energy resources used to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction


# 471800596084
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction metering devices for energy resources used to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction


# 471800588900
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-08-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction metering devices for energy resources used to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction


# 471800383185
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-06-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of works at the beginning of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation


# 471800383203
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of works at the beginning of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation


# 471800197369
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 471801948456
Unscheduled inspection
Start date: 2018-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 471800078236
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer technical customer on completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction


# 781800070053
Unscheduled inspection
Start date: 2018-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 471800048289
Unscheduled inspection
Start date: 2018-02-05, end date: 2019-03-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer technical customer on completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction


# 47170803025269
Unscheduled inspection
Start date: 2017-12-31, end date: 2018-02-26, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Leningradskoi oblasti
Purpose of inspection: Compliance with the mandatory requirements established by regulatory legal acts of the Russian Federation in the course of carrying out activities


# 47170802958350
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Leningradskoi oblasti
Purpose of inspection:


# 00170802707662
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ocenka hoda podgotovki obektov teplosnabzheniya k otopitelnomu periodu v sootvetstvii s prikazom Rostehnadzora O kontrole hoda podgotovki obektov elektroenergetiki i teplosnabzheniya k rabote osennezimnii period 20172018 godov ot 10072017 256osuschestvlenie kontrolya za prinimaemymi yuridicheskim licom merami po soblyudeniyu teplosnabzhayuschimi organizaciyami trebovanii bezopasnosti v sfere teplosnabzheniya vliyayuschih na vypolnenie trebovanii po gotovnosti k otopitelnomu periodu


# 00170802170116
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: osuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ustraneniyu narushenii obyazatelnyh trebovanii v svyazi s istecheniem sroka ispolneniya predpisaniya 2778163247PR ot 31102016


# 47170701547898
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-05-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: The purpose of checking the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this check is compliance with mandatory requirements including compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for used energy resourcescompliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 78170701542805
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-05-17, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: s celyu kontrolya ustraneniya narushenii trebovanii pozharnoi bezopasnosti ukazannyh v predpisanii ob ustranenii vyyavlennyh narushenii trebovanii pozharnoi bezopasnosti ot 30032016 2215511 srok ispolneniya kotorogo istek srok ustraneniya 01032017zadachami nastoyaschei proverki yavlyayutsya vyyavlenie presechenie i preduprezhdenie vozmozhnyh narushenii trebovanii pozharnoi bezopasnosti osuschestvlenie sistematicheskogo nablyudeniya za ispolneniem trebovanii pozharnoi bezopasnostiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie trebovanii pozharnoi bezopasnosti na obekte zaschity ispolzuemom ekspluatiruemom organizaciei v processe osuschestvleniya svoei deyatelnosti


# 47170701535466
Unscheduled inspection
Start date: 2017-04-12, end date: 2017-05-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: The purpose of checking the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this check is compliance with mandatory requirements including compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for used energy resourcescompliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 47170701527890
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-05-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer of the technical customer on the completion of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements equipment of the capital construction facility with metering devices for used energy resourcescompliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 47160701202130
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Cel proverka zaversheniya rabot po osuschestvleniyu stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ukazannogo v izveschenii zastroischika tehnicheskogo zakazchika ob okonchanii stroitelstva Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v tom chisle sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov vypolnenie trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii


# 47160701190978
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Cel proverka zaversheniya rabot po osuschestvleniyu stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ukazannogo v izveschenii zastroischika tehnicheskogo zakazchika ob okonchanii stroitelstvaPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v tom chisle sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov vypolnenie trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii


# 47160701140700
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of completion of work on the implementation of construction reconstruction of the capital construction facility specified in the notice of the developer of the technical customer on completion of construction The subject of verification is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements capital construction facility with accounting devices for energy resources used to meet the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00160701106477
Unscheduled inspection
Start date: 2016-10-27, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 00160700937017
Unscheduled inspection
Start date: 2016-09-07, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 00160700070130
Unscheduled inspection
Start date: 2016-08-12, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the measures taken by a legal entity to eliminate violations of mandatory requirements


# 00160700070095
Unscheduled inspection
Start date: 2016-08-12, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to ensure compliance by heat supply organizations with safety requirements in the field of heat supply that affect the fulfillment of requirements for readiness for the heating period


# 00160601646503
Unscheduled inspection
Start date: 2016-05-30, end date: 2016-06-03, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the activities of legal and individual entrepreneurs in compliance with the requirements of legislation on urban development activities and mandatory norms and rules during the construction and reconstruction of a capital construction facility


# 00150601276964
Unscheduled inspection
Start date: 2015-10-07, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the preparation of electric power industry enterprises and heat supply facilities for the heating period


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.